| [[File:IrradianceTest.jpg|thumb|right|300px|Measuring the irradiance during the Site Acceptance Test (Source: Reinhold Schmidt)]] Upon completion of the installation, the functionality and the performance of the system should be tested in the presence of the future user (producer). The testing includes a number of separate analyses. The first step is the acceptance test for the photovoltaic pumping system (PVP) which includes the PV generator, the mounting and tracking system (if part of the system), the controller and the water pump. These components are the “engine” of the SPIS, their performance is vital for the successful use of the irrigation system. | | [[File:IrradianceTest.jpg|thumb|right|300px|Measuring the irradiance during the Site Acceptance Test (Source: Reinhold Schmidt)]] Upon completion of the installation, the functionality and the performance of the system should be tested in the presence of the future user (producer). The testing includes a number of separate analyses. The first step is the acceptance test for the photovoltaic pumping system (PVP) which includes the PV generator, the mounting and tracking system (if part of the system), the controller and the water pump. These components are the “engine” of the SPIS, their performance is vital for the successful use of the irrigation system. |
Line 20: |
Line 20: |
| The measurements are usually carried out in the following sequence: | | The measurements are usually carried out in the following sequence: |
| | | |
− | {| style="width: 100%" cellspacing="1" cellpadding="1" border="0" | + | {| style="width: 100%;" border="0" cellspacing="1" cellpadding="1" |
| |- | | |- |
− | | style="background-color: rgb(225, 229, 205)" | | + | | style="background-color: rgb(225, 229, 205);" | |
| Measurement of solar irradiance --> Calculation of electrical power output--> Measurement and calculation of total pumping head --> Measurement of actual water flow ---> Comparison of measured and designed water flow | | Measurement of solar irradiance --> Calculation of electrical power output--> Measurement and calculation of total pumping head --> Measurement of actual water flow ---> Comparison of measured and designed water flow |
| | | |
| |} | | |} |
| | | |
− | The different measurements should be carried-out within a short time interval under clear sky conditions. At least two ac-ceptance test runs are advisable, measuring at high irradiance (800 – 1,000 W/m2) and low irradiance levels (approx. 500 W/m2). The equipment for the test will be provided by the installer. | + | The different measurements should be carried out within a short time interval under clear sky conditions. At least two acceptance test runs are advisable, measuring at high irradiance (800 – 1,000 W/m2) and low irradiance levels (approx. 500 W/m2). The equipment for the test will be provided by the installer. |
| | | |
− | {| style="width: 100%" cellspacing="1" cellpadding="1" border="0" | + | {| style="width: 100%;" border="0" cellspacing="1" cellpadding="1" |
| |- | | |- |
− | | style="background-color: rgb(225, 229, 205)" | | + | | style="background-color: rgb(225, 229, 205);" | |
| '''Important''': Check on the tightness of seals and joints, screws and bolts. | | '''Important''': Check on the tightness of seals and joints, screws and bolts. |
| | | |
Line 42: |
Line 42: |
| |} | | |} |
| | | |
− | The results of the acceptance test should be compared with the design performance of the PV pumping system. The '''[[:File:DESIGN_–_Pump_Sizing_Tool.xlsx|DESIGN – Pump Sizing Tool]]''' could be used to record the most important data and to compare it with the design values. The acceptance test protocol should be signed by the installer and the producer. | + | The results of the acceptance test should be compared with the design performance of the PV pumping system. The '''[[:File:DESIGN – Pump Sizing Tool.xlsx|DESIGN – Pump Sizing Tool]]''' could be used to record the most important data and to compare it with the design values. The acceptance test protocol should be signed by the installer and the producer. |
| | | |
− | The tool '''[[:File:SET_UP_–_PVP_Acceptance_Test.docx|SET UP – PVP Acceptance Test]]''' provides more details on the steps, required equipment and calculations involved in the acceptance test. | + | The tool '''[[:File:SET UP – PVP Acceptance Test.docx|SET UP – PVP Acceptance Test]]''' provides more details on the steps, required equipment and calculations involved in the acceptance test. |
| | | |
− | === '''<span style="color:#879637;">Outcome/Product</span>''' === | + | === '''<span style="color: rgb(135, 150, 55);">Outcome/Product</span>''' === |
| | | |
| *Completed acceptance test for the photovoltaic water pumping system; | | *Completed acceptance test for the photovoltaic water pumping system; |
| *Comparison of actual performance to design performance; | | *Comparison of actual performance to design performance; |
| *Acceptance test protocol: | | *Acceptance test protocol: |
− | *'''[[:File:SET_UP_–_PVP_Acceptance_Test.docx|SET UP – PVP Acceptance Test]]'''. | + | *'''[[:File:SET UP – PVP Acceptance Test.docx|SET UP – PVP Acceptance Test]]'''. |
| | | |
− | === '''<span style="color:#879637;">Data Requirements</span>''' === | + | === '''<span style="color: rgb(135, 150, 55);">Data Requirements</span>''' === |
| | | |
| *Measured solar irradiance, total pumping head and water flow; | | *Measured solar irradiance, total pumping head and water flow; |
Line 59: |
Line 59: |
| *Observations from visual check. | | *Observations from visual check. |
| | | |
− | === '''<span style="color:#879637;">People/Stakeholders</span>''' === | + | === '''<span style="color: rgb(135, 150, 55);">People/Stakeholders</span>''' === |
| | | |
| *Producer; | | *Producer; |
Line 65: |
Line 65: |
| *Agricultural service provider. | | *Agricultural service provider. |
| | | |
− | === '''<span style="color:#879637;">Important Issues</span>''' === | + | === '''<span style="color: rgb(135, 150, 55);">Important Issues</span>''' === |
| | | |
| *The on-site acceptance test is mandatory to verify if the PVP systems achieves design performance. | | *The on-site acceptance test is mandatory to verify if the PVP systems achieves design performance. |
Upon completion of the installation, the functionality and the performance of the system should be tested in the presence of the future user (producer). The testing includes a number of separate analyses. The first step is the acceptance test for the photovoltaic pumping system (PVP) which includes the PV generator, the mounting and tracking system (if part of the system), the controller and the water pump. These components are the “engine” of the SPIS, their performance is vital for the successful use of the irrigation system.
This acceptance test (also referred to as Site Acceptance Test, SAT) is the second level of material testing in view of quality management. Manufacturers of system components are obliged to run a Factory Acceptance Test (FAT) prior to releasing products to the supplier. Ideally, both levels of testing should be presented when evaluating an SPIS, but are not always readily available.
The different measurements should be carried out within a short time interval under clear sky conditions. At least two acceptance test runs are advisable, measuring at high irradiance (800 – 1,000 W/m2) and low irradiance levels (approx. 500 W/m2). The equipment for the test will be provided by the installer.
The results of the acceptance test should be compared with the design performance of the PV pumping system. The DESIGN – Pump Sizing Tool could be used to record the most important data and to compare it with the design values. The acceptance test protocol should be signed by the installer and the producer.