|
|
(5 intermediate revisions by 2 users not shown) |
Line 1: |
Line 1: |
| {{Biogas Project Database | | {{Biogas Project Database |
− | |BSP Project Name=Thermo-technical retrofitting of public buildings | + | |BSP Project Name=Kindergarten No. 5 Jargalant soum - Thermo-technical retrofitting of public buildings |
| |BSP Project Desc=Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings. | | |BSP Project Desc=Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings. |
− | |BSP Project Budget=264.563.214,00 MNT | + | |BSP Project Number=14.2128.8-002.00 |
| + | |BSP Project Budget=264,563,214 MNT |
| |BSP Project Status=Completed | | |BSP Project Status=Completed |
| |BSP Project Start=2014/07/22 | | |BSP Project Start=2014/07/22 |
| |BSP Project Type=other | | |BSP Project Type=other |
| |BSP Project End=2014/09/26 | | |BSP Project End=2014/09/26 |
| + | |BSP Project Picture=Untitled.png |
| |BSP Province Name=Khovd | | |BSP Province Name=Khovd |
| |BSP Province=48.001732, 91.635858 | | |BSP Province=48.001732, 91.635858 |
Line 14: |
Line 16: |
| }} | | }} |
| | | |
− | <u>Building data and geometry</u><br/>
| + | ==== Building data and geometry<br/> ==== |
| | | |
− | Construction year: 1975<br/> | + | *Construction year: 1975<br/> |
| + | *Cross volume: 3,276.8 m³<br/> |
| + | *Thermal envelope: 1,730.3 m²<br/> |
| + | *Net volume: 2,835 m³<br/> |
| + | *Net floor area: 799.3 m²<br/> |
| | | |
− | Cross volume: 3276.8 m³<br/>
| + | ==== Implemented measures:<br/> ==== |
− | | + | |
− | Thermal envelope: 1730.3 m²<br/>
| + | |
− | | + | |
− | Net volume: 2835 m³<br/>
| + | |
− | | + | |
− | Net floor area: 799.3 m²<br/>
| + | |
− | | + | |
− | <u>Implemented measures:</u><br/>
| + | |
| | | |
| *Roof insulation with 20cm EPS- hard foam and waterproofing<br/> | | *Roof insulation with 20cm EPS- hard foam and waterproofing<br/> |
| *Wall insulation with 15cm EPS- hard foam<br/> | | *Wall insulation with 15cm EPS- hard foam<br/> |
| *New windows with 5-chamber plastic frame and double glazing<br/> | | *New windows with 5-chamber plastic frame and double glazing<br/> |
− | *New exterior doors <br/> | + | *New exterior doors<br/> |
| *Rehabilitation of the heating system<br/> | | *Rehabilitation of the heating system<br/> |
| + | *Contracting company: Tulgat bagana LLC<br/> |
| + | |
| + | ==== Energy consumption<br/> ==== |
| | | |
− | Contracting company: Tulgat bagana LLC<br/>
| + | *Before: 522 kWh/(m2 a) {calculated}<br/> |
| + | *After: 140 kWh /(m2 a) {metred}<br/> |
| + | *Energy saving per year: 305,332 kWh<br/> |
| + | *Coal equivalent saving: 75,020 kg / 75 t<br/> |
| + | *CO<sub>2</sub> emission savings per year: 206 t CO<sub>2 </sub>{Estimated}<br/> |