SOFTWARE UPDATE ANNOUNCEMENT: 30 AUG - 15 SEP
|
Error creating thumbnail: convert: unable to open image `/var/www/ISWiki/prod/current/energypedia/images/0/0a/Icon_Announcement.png': No such file or directory @ error/blob.c/OpenBlob/2641. convert: no images defined `/tmp/transform_339be27-1.png' @ error/convert.c/ConvertImageCommand/3044.
|
Hurrah! Your beloved energypedia is getting a new software update to ensure faster and easier knowledge exchange and sharing on energypedia. After the new software update, you can expect a new and updated energypedia with a responsive design.
Hence, from 30 Aug to 15 Sep, energypedia will be on read-only mode and you will not be able to download/upload content or create/edit articles on energypedia.
|
Tekeze
From old.energypedia.info
(Difference between revisions)
|
|
(2 intermediate revisions by 2 users not shown) |
Line 2: |
Line 2: |
| |HPDBCountry=Ethiopia | | |HPDBCountry=Ethiopia |
| |HPDBCity/Town=Amhara | | |HPDBCity/Town=Amhara |
− | |HPDBCoordinates=Latitude= 13.3492, Longitude= 38.74049 | + | |HPDBCoordinates=13.3492, 38.74049 |
− | |HPDBDate of Commission= 2009 | + | |HPDBDate of Commission=2009 |
| |HPDBBasin Name=Tekeze River (a tributary of Atbarah River which is a tributary of the Nile) | | |HPDBBasin Name=Tekeze River (a tributary of Atbarah River which is a tributary of the Nile) |
| |HPDBOperator=Ethiopian national grid at Mekele | | |HPDBOperator=Ethiopian national grid at Mekele |
| |HPDBProject Status=Completed | | |HPDBProject Status=Completed |
− | |HPDBPower=300000 | + | |HPDBPower=300.000 |
− | |HPDBEnergy=981000 | + | |HPDBEnergy=981.000.000 |
| + | |HPDBCapacity Factor=37 |
| |HPDBPenstock Flow=119 | | |HPDBPenstock Flow=119 |
| |HPDBHead=155 | | |HPDBHead=155 |
Latest revision as of 08:09, 3 September 2012
Back to the Hydropower Sites Database
General Information
Country:
|
Ethiopia
|
City/Town:
|
Amhara
|
Coordinates (Powerhouse):
|
13° 20' 57" N, 38° 44' 26" E
|
Year of Commission:
|
2009
|
Basin Name:
|
Tekeze River (a tributary of Atbarah River which is a tributary of the Nile)
|
Stream Name:
|
|
Developer:
|
|
Operator:
|
Ethiopian national grid at Mekele
|
Project Status:
|
Completed
|
Any other uses of the water source:
|
|
Contact:
|
|
Comment:
|
|
Link to Photos:
|
|
Technical Information
Power: (kW)
|
300.000
|
Energy (kWh/a):
|
981.000.000
|
Capacity Factor (%):
|
37
|
Penstock Diameter (mm):
|
|
Penstock Length (m):
|
|
Penstock Material (m³/s):
|
|
Maximum Flow of the Penstock (m³/s):
|
119
|
Minimum Flow of the Stream (m³/s):
|
|
Head (m):
|
155
|
Turbine Type:
|
Fracis turbines
|
Turbine Manufacturer:
|
Dongfang China
|
Generator Type:
|
|
Generator Capacity (kW):
|
|
Generator Manufacturer:
|
Dongfang China
|
Comment:
|
|
Mini/Island Grid Information
Mini Grid:
|
No
|
Load Control Information:
|
|
Connection Type:
|
|
Public Lighting:
|
|
Length of Transmission Line (m):
|
105000
|
Voltage (v):
|
230000
|
Transmission Conductor (type) :
|
|
Diameter of Conductor (mm²):
|
|
Transformer Rating (kVA):
|
|
Link to Grid:
|
|
S.W.E.R:
|
|
Operational Period (Xdays/year):
|
|
Comment:
|
|
Dam Information
Dam Type:
|
Dam on river with reservoir
|
Dam Construction Material:
|
Concrete Arch Dam
|
Dam Height [m]:
|
188
|
Length of Dam [m]:
|
420
|
Storage Volume of Reservoir (m³):
|
9310000000
|
Flood Storage of Reservoir:
|
|
Channel Material:
|
|
Comment:
|
|
Economic Information
Cost (€):
|
364,999,999
|
Donor/Financier & Percentage:
|
|
Tariff Levels:
|
|
Connected Households:
|
|
Connection Cost (€):
|
|
Cost to be Covered by Households (%):
|
|
Comment:
|
Project Financed By: China Exim Bank ($50 million)
|
Link to Cost Breakdown:
|
|