| | |HPDBCountry=Ethiopia | | |HPDBCountry=Ethiopia |
| | |HPDBCity/Town=District: Bona | | |HPDBCity/Town=District: Bona |
| − | |HPDBCoordinates=6º34’40’’N 38º41’50.3’’ E | + | |HPDBCoordinates=6°34’40’’ N, 38°41’50.3’’ E |
| | |HPDBStream Name=Gange | | |HPDBStream Name=Gange |
| | |HPDBOperator=Gobecho Genet Electric users cooperative/Community based cooperative Society | | |HPDBOperator=Gobecho Genet Electric users cooperative/Community based cooperative Society |
| Line 12: |
Line 12: |
| | |HPDBGenerator Capacity=10kW | | |HPDBGenerator Capacity=10kW |
| | |HPDBCommentTI=A.C. Synchronous Generator/ Power 10 kW, 400 V, 50 Hz, 1500r/min, 3 phase | | |HPDBCommentTI=A.C. Synchronous Generator/ Power 10 kW, 400 V, 50 Hz, 1500r/min, 3 phase |
| − | |HPDBMini Grid=No | + | |HPDBMini Grid=Yes |
| | |HPDBDonor/Financier=GIZ EnDev | | |HPDBDonor/Financier=GIZ EnDev |
| | |HPDBTariff Levels=Flat rate/monthly based per appliance | | |HPDBTariff Levels=Flat rate/monthly based per appliance |
| | }} | | }} |
| | further information: https://energypedia.info/index.php/File:Fact_sheet_Gobecho.pdf | | further information: https://energypedia.info/index.php/File:Fact_sheet_Gobecho.pdf |
Latest revision as of 08:13, 3 September 2012
Back to the Hydropower Sites Database
General Information
| Country:
|
Ethiopia
|
| City/Town:
|
District: Bona
|
| Coordinates (Powerhouse):
|
The following coordinate was not recognized: 6°34’40’’ N, 38°41’50.3’’ E.The following coordinate was not recognized: 6°34’40’’ N, 38°41’50.3’’ E.
|
| Year of Commission:
|
|
| Basin Name:
|
|
| Stream Name:
|
Gange
|
| Developer:
|
|
| Operator:
|
Gobecho Genet Electric users cooperative/Community based cooperative Society
|
| Project Status:
|
|
| Any other uses of the water source:
|
|
| Contact:
|
|
| Comment:
|
|
| Link to Photos:
|
https://energypedia.info/index.php/MHP_Gobecho_I
|
Technical Information
| Power: (kW)
|
7
|
| Energy (kWh/a):
|
|
| Capacity Factor (%):
|
|
| Penstock Diameter (mm):
|
|
| Penstock Length (m):
|
|
| Penstock Material (m³/s):
|
|
| Maximum Flow of the Penstock (m³/s):
|
|
| Minimum Flow of the Stream (m³/s):
|
|
| Head (m):
|
|
| Turbine Type:
|
cross flow turbine (T-3)
|
| Turbine Manufacturer:
|
SELAM
|
| Generator Type:
|
Synchronous
|
| Generator Capacity (kW):
|
10kW
|
| Generator Manufacturer:
|
|
| Comment:
|
A.C. Synchronous Generator/ Power 10 kW, 400 V, 50 Hz, 1500r/min, 3 phase
|
Mini/Island Grid Information
| Mini Grid:
|
Yes
|
| Load Control Information:
|
|
| Connection Type:
|
|
| Public Lighting:
|
|
| Length of Transmission Line (m):
|
|
| Voltage (v):
|
|
| Transmission Conductor (type) :
|
|
| Diameter of Conductor (mm²):
|
|
| Transformer Rating (kVA):
|
|
| Link to Grid:
|
|
| S.W.E.R:
|
|
| Operational Period (Xdays/year):
|
|
| Comment:
|
|
Dam Information
|
Dam Type:
|
|
| Dam Construction Material:
|
|
| Dam Height [m]:
|
|
| Length of Dam [m]:
|
|
| Storage Volume of Reservoir (m³):
|
|
| Flood Storage of Reservoir:
|
|
| Channel Material:
|
|
| Comment:
|
|
Economic Information
| Cost (€):
|
|
| Donor/Financier & Percentage:
|
GIZ EnDev
|
| Tariff Levels:
|
Flat rate/monthly based per appliance
|
| Connected Households:
|
|
| Connection Cost (€):
|
|
| Cost to be Covered by Households (%):
|
|
| Comment:
|
|
| Link to Cost Breakdown:
|
|
further information: https://energypedia.info/index.php/File:Fact_sheet_Gobecho.pdf