SOFTWARE UPDATE ANNOUNCEMENT: 30 AUG - 15 SEP
|
Error creating thumbnail: convert: unable to open image `/var/www/ISWiki/prod/current/energypedia/images/0/0a/Icon_Announcement.png': No such file or directory @ error/blob.c/OpenBlob/2641. convert: no images defined `/tmp/transform_d26b7-1.png' @ error/convert.c/ConvertImageCommand/3044.
|
Hurrah! Your beloved energypedia is getting a new software update to ensure faster and easier knowledge exchange and sharing on energypedia. After the new software update, you can expect a new and updated energypedia with a responsive design.
Hence, from 30 Aug to 15 Sep, energypedia will be on read-only mode and you will not be able to download/upload content or create/edit articles on energypedia.
|
Mudododo 2 (Francisco Jone)
From old.energypedia.info
(Difference between revisions)
|
|
Line 2: |
Line 2: |
| |HPDBCountry=Mozambique | | |HPDBCountry=Mozambique |
| |HPDBCity/Town=Mharidza, Mudododo 2, Manica | | |HPDBCity/Town=Mharidza, Mudododo 2, Manica |
− | |HPDBCoordinates=-18° 50' 14.70" N, 32° 43' 36.00" E | + | |HPDBCoordinates=18° 50' 14.70" N, 32° 43' 36.00" E |
| |HPDBStream Name=Nhamatsamba | | |HPDBStream Name=Nhamatsamba |
| |HPDBOperator=Francisco Jone | | |HPDBOperator=Francisco Jone |
Latest revision as of 20:08, 18 October 2012
Back to the Hydropower Sites Database
General Information
Country:
|
Mozambique
|
City/Town:
|
Mharidza, Mudododo 2, Manica
|
Coordinates (Powerhouse):
|
18° 50' 15" N, 32° 43' 36" E
|
Year of Commission:
|
|
Basin Name:
|
|
Stream Name:
|
Nhamatsamba
|
Developer:
|
|
Operator:
|
Francisco Jone
|
Project Status:
|
|
Any other uses of the water source:
|
Milling, Irrigation
|
Contact:
|
|
Comment:
|
In operation with 24/25 houses, 5/4 PUE connected
|
Link to Photos:
|
|
Technical Information
Power: (kW)
|
16
|
Energy (kWh/a):
|
|
Capacity Factor (%):
|
|
Penstock Diameter (mm):
|
|
Penstock Length (m):
|
|
Penstock Material (m³/s):
|
|
Maximum Flow of the Penstock (m³/s):
|
|
Minimum Flow of the Stream (m³/s):
|
|
Head (m):
|
|
Turbine Type:
|
|
Turbine Manufacturer:
|
|
Generator Type:
|
|
Generator Capacity (kW):
|
|
Generator Manufacturer:
|
|
Comment:
|
|
Mini/Island Grid Information
Mini Grid:
|
Yes
|
Load Control Information:
|
|
Connection Type:
|
|
Public Lighting:
|
|
Length of Transmission Line (m):
|
|
Voltage (v):
|
|
Transmission Conductor (type) :
|
|
Diameter of Conductor (mm²):
|
|
Transformer Rating (kVA):
|
|
Link to Grid:
|
|
S.W.E.R:
|
|
Operational Period (Xdays/year):
|
|
Comment:
|
|
Dam Information
Dam Type:
|
|
Dam Construction Material:
|
|
Dam Height [m]:
|
|
Length of Dam [m]:
|
|
Storage Volume of Reservoir (m³):
|
|
Flood Storage of Reservoir:
|
|
Channel Material:
|
|
Comment:
|
|
Economic Information
Cost (€):
|
|
Donor/Financier & Percentage:
|
|
Tariff Levels:
|
|
Connected Households:
|
|
Connection Cost (€):
|
|
Cost to be Covered by Households (%):
|
|
Comment:
|
|
Link to Cost Breakdown:
|
|