Line 1: |
Line 1: |
− | = '''<u></u>'''Overview<br/> = | + | = Overview<br/> = |
| | | |
− | '''<u>Location of the site:<br/></u>''' | + | '''<u>Location of the site:</u>''' |
| | | |
| *<u>Country</u>: Germany | | *<u>Country</u>: Germany |
Line 12: |
Line 12: |
| | | |
| | | |
− | = Construction and Comissioning<br/> = | + | = Further Information - Project<br/> = |
| | | |
| '''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012 | | '''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012 |
Line 29: |
Line 29: |
| |- | | |- |
| | colspan="2" | | | | colspan="2" | |
− | [[File:Haeusleberg farm.jpg|frame|none|760px|A view over the Häusleberg organic farm]] | + | [[File:Haeusleberg farm.jpg|frame|center|760px|A view over the Häusleberg organic farm]] |
| | | |
| |- | | |- |
Line 36: |
Line 36: |
| | | |
| |- | | |- |
− | | [[File:Haeusleberg turbine 1.jpg|frame|none|370px|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/> | + | | [[File:Haeusleberg turbine 1.jpg|frame|center|370px|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/> |
− | | [[File:Haeusleberg turbine 2.jpg|frame|none|370px|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/> | + | | [[File:Haeusleberg turbine 2.jpg|frame|center|370px|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/> |
| |- | | |- |
| | <br/> | | | <br/> |
| | <br/> | | | <br/> |
| |- | | |- |
− | | [[File:Haeusleberg turbine 3.jpg|frame|none|370px|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/> | + | | [[File:Haeusleberg turbine 3.jpg|frame|center|370px|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/> |
− | | [[File:Haeusleberg turbine 4.jpg|frame|none|370px|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/> | + | | [[File:Haeusleberg turbine 4.jpg|frame|center|370px|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/> |
| |- | | |- |
| | <br/> | | | <br/> |
| | <br/> | | | <br/> |
| |- | | |- |
− | | [[File:Haeusleberg turbine 5.jpg|frame|none|370px|Nozzle alignment test.]]<br/> | + | | [[File:Haeusleberg turbine 5.jpg|frame|center|370px|Nozzle alignment test.]]<br/> |
| | | | | |
| |- | | |- |
Revision as of 14:03, 12 December 2012
Overview
Location of the site:
- Country: Germany
- District: Baden-Württemberg
- River: Schanzbach
- GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E
This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: sites.google.com/site/haeusleberg/
Further Information - Project
Start of Construction: December 2011
Date of Commissioning: June 2012
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Turbine: Pelton
Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
A view over the Häusleberg organic farm
|
|
Side view of the installed turbine atop the wooden framed drainage barrel.
|
Top view of the installed turbine atop the wooden framed drainage barrel.
|
|
|
The turbine from below showing the pelton runner at the nozzle mounting bracket.
|
The stator of the direct drive motor during modifications for the 12 V hybrid system.
|
|
|
Nozzle alignment test.
|
|
|
|
Further Information
References