SOFTWARE UPDATE ANNOUNCEMENT: 30 AUG - 15 SEP
|
Error creating thumbnail: convert: unable to open image `/var/www/ISWiki/prod/current/energypedia/images/0/0a/Icon_Announcement.png': No such file or directory @ error/blob.c/OpenBlob/2641. convert: no images defined `/tmp/transform_2bae1ff-1.png' @ error/convert.c/ConvertImageCommand/3044.
|
Hurrah! Your beloved energypedia is getting a new software update to ensure faster and easier knowledge exchange and sharing on energypedia. After the new software update, you can expect a new and updated energypedia with a responsive design.
Hence, from 30 Aug to 15 Sep, energypedia will be on read-only mode and you will not be able to download/upload content or create/edit articles on energypedia.
|
Friedenheim
From old.energypedia.info
(Difference between revisions)
|
|
Line 1: |
Line 1: |
| {{HPDB | | {{HPDB |
| |HPDBCountry=South Africa | | |HPDBCountry=South Africa |
− | |HPDBCity/Town=Nelspruit, Mpumalanga, | + | |HPDBCity/Town=Nelspruit, Mpumalanga, |
| |HPDBDate of Commission=1985 | | |HPDBDate of Commission=1985 |
| |HPDBStream Name=Krokodil | | |HPDBStream Name=Krokodil |
Revision as of 07:23, 28 January 2013
Back to the Hydropower Sites Database
General Information
Country:
|
South Africa
|
City/Town:
|
Nelspruit, Mpumalanga,
|
Coordinates (Powerhouse):
|
|
Year of Commission:
|
1985
|
Basin Name:
|
|
Stream Name:
|
Krokodil
|
Developer:
|
|
Operator:
|
|
Project Status:
|
Commissioned
|
Any other uses of the water source:
|
|
Contact:
|
|
Comment:
|
|
Link to Photos:
|
http://hydro4africa.net/HP_database/station.php?ID=1&tab=images
|
Technical Information
Power: (kW)
|
2000.0 kW
|
Energy (kWh/a):
|
|
Capacity Factor (%):
|
|
Penstock Diameter (mm):
|
|
Penstock Length (m):
|
|
Penstock Material (m³/s):
|
|
Maximum Flow of the Penstock (m³/s):
|
|
Minimum Flow of the Stream (m³/s):
|
|
Head (m):
|
|
Turbine Type:
|
2 * Francis of 1000.0 kW
|
Turbine Manufacturer:
|
Sulzer
|
Generator Type:
|
|
Generator Capacity (kW):
|
|
Generator Manufacturer:
|
|
Comment:
|
|
Mini/Island Grid Information
Mini Grid:
|
No
|
Load Control Information:
|
|
Connection Type:
|
|
Public Lighting:
|
|
Length of Transmission Line (m):
|
|
Voltage (v):
|
|
Transmission Conductor (type) :
|
|
Diameter of Conductor (mm²):
|
|
Transformer Rating (kVA):
|
|
Link to Grid:
|
|
S.W.E.R:
|
|
Operational Period (Xdays/year):
|
|
Comment:
|
|
Dam Information
Dam Type:
|
|
Dam Construction Material:
|
|
Dam Height [m]:
|
500 m
|
Length of Dam [m]:
|
5200 m
|
Storage Volume of Reservoir (m³):
|
4.000 m3/s
|
Flood Storage of Reservoir:
|
|
Channel Material:
|
|
Comment:
|
|
Economic Information
Cost (€):
|
|
Donor/Financier & Percentage:
|
|
Tariff Levels:
|
|
Connected Households:
|
|
Connection Cost (€):
|
|
Cost to be Covered by Households (%):
|
|
Comment:
|
|
Link to Cost Breakdown:
|
|