Line 1: |
Line 1: |
| + | |
| + | |
| + | = Overview<br/> = |
| + | |
| + | '''<u>Location of the site:</u>''' |
| + | *<u>Country</u>: Germany |
| + | *<u>District</u>: <span style="color: rgb(34, 34, 34); font-family: arial, sans-serif; font-size: small; line-height: 16px">Baden-Württemberg</span> |
| + | *<u>River</u>: Schanzbach |
| + | *<u>GPS Coordinates</u>: 47<span style="text-align: left">º55’40.5’’N 7º55’31.2’’E</span> |
| + | |
| + | <br/>This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/] |
| + | |
| + | <br/> |
| + | |
| + | = Further Information - Project<br/> = |
| + | |
| + | '''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012 |
| + | |
| + | |
| + | |
| + | '''Ownership / Operation Model:''' Privately owned |
| + | |
| + | '''Tariff structure:''' Not applicable |
| + | |
| + | <br/>'''Turbine:''' Pelton |
| + | |
| + | '''Generator:''' Modified direct drive motor, 3 phase, 20 V, 150 W (approximately) |
| + | |
| + | {| class="FCK__ShowTableBorders" border="0" cellpadding="3" cellspacing="1" style="width: 100%;" |
| + | |- |
| + | | colspan="2" | |
| + | [[File:Haeusleberg farm.jpg|frame|center|A view over the Häusleberg organic farm]] |
| + | |
| + | |- |
| + | | colspan="2" | |
| + | <br/> |
| + | |
| + | |- |
| + | | [[File:Haeusleberg turbine 1.jpg|frame|center|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/> |
| + | | [[File:Haeusleberg turbine 2.jpg|frame|center|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/> |
| + | |- |
| + | | <br/> |
| + | | <br/> |
| + | |- |
| + | | [[File:Haeusleberg turbine 3.jpg|frame|center|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/> |
| + | | [[File:Haeusleberg turbine 4.jpg|frame|center|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/> |
| + | |- |
| + | | <br/> |
| + | | <br/> |
| + | |- |
| + | | [[File:Haeusleberg turbine 5.jpg|frame|center|Nozzle alignment test.]]<br/> |
| + | | |
| + | |- |
| + | | <br/> |
| + | | |
| + | |} |
| + | |
| + | <br/> |
| + | |
| + | = Further Information<br/> = |
| + | |
| + | *project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/] |
| + | |
| + | <br/> |
| + | |
| + | = References<br/> = |
| + | |
| + | <references /> |
| + | |
| + | |
| + | |
| + | |
| + | |
| + | |
| | | |
| | | |
Line 9: |
Line 83: |
| ''add general comments such as number of connected HH in this segment'' | | ''add general comments such as number of connected HH in this segment'' |
| | | |
− | | + | <br/> |
| | | |
| '''Start of construction:'''<br/>'''Date of Commissioning:''' | | '''Start of construction:'''<br/>'''Date of Commissioning:''' |
| | | |
− | | + | <br/> |
| | | |
| '''Ownership / Operation Model:''' | | '''Ownership / Operation Model:''' |
Line 21: |
Line 95: |
| <br/>'''Turbine:''' | | <br/>'''Turbine:''' |
| | | |
− | '''Generator: '''<br/> | + | '''Generator: '''<br/> |
| | | |
| {| cellspacing="1" cellpadding="1" border="1" style="width: 100%;" | | {| cellspacing="1" cellpadding="1" border="1" style="width: 100%;" |
Revision as of 21:09, 26 March 2014
Overview
Location of the site:
- Country: Germany
- District: Baden-Württemberg
- River: Schanzbach
- GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E
This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: sites.google.com/site/haeusleberg/
Further Information - Project
Start of Construction: December 2011
Date of Commissioning: June 2012
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Turbine: Pelton
Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
A view over the Häusleberg organic farm
|
|
Side view of the installed turbine atop the wooden framed drainage barrel.
|
Top view of the installed turbine atop the wooden framed drainage barrel.
|
|
|
The turbine from below showing the pelton runner at the nozzle mounting bracket.
|
The stator of the direct drive motor during modifications for the 12 V hybrid system.
|
|
|
Nozzle alignment test.
|
|
|
|
Further Information
References
Location of the site:
- Country: text
- District: text
- River: text
- GPS Coordinates: text
add general comments such as number of connected HH in this segment
Start of construction:
Date of Commissioning:
Ownership / Operation Model:
Tariff structure:
Turbine:
Generator:
add picture of MHP location
|
add picture of MHP location
|
add description of picture
|
add description of picture
|
add picture of MHP location
|
add picture of MHP location
|
add description of picture
|
add description of picture
|
add respective country category