Line 16: |
Line 16: |
| '''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012 | | '''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012 |
| | | |
− | <br/>
| + | |
| | | |
| '''Ownership / Operation Model:''' Privately owned | | '''Ownership / Operation Model:''' Privately owned |
Line 26: |
Line 26: |
| '''Generator:''' Modified direct drive motor, 3 phase, 20 V, 150 W (approximately) | | '''Generator:''' Modified direct drive motor, 3 phase, 20 V, 150 W (approximately) |
| | | |
− | {| cellspacing="1" cellpadding="1" border="1" style="width: 100%;" | + | {| class="FCK__ShowTableBorders" border="0" cellpadding="3" cellspacing="1" style="width: 100%;" |
| |- | | |- |
− | | add picture of MHP location | + | | colspan="2" | |
− | | add picture of MHP location | + | [[File:Haeusleberg farm.jpg|frame|center|A view over the Häusleberg organic farm]] |
| + | |
| |- | | |- |
− | | add description of picture | + | | colspan="2" | |
− | | add description of picture | + | <br/> |
| + | |
| |- | | |- |
− | | add picture of MHP location<br/> | + | | [[File:Haeusleberg turbine 1.jpg|frame|center|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/> |
− | | add picture of MHP location | + | | [[File:Haeusleberg turbine 2.jpg|frame|center|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/> |
| |- | | |- |
− | | add description of picture | + | | <br/> |
− | | add description of picture | + | | <br/> |
| + | |- |
| + | | [[File:Haeusleberg turbine 3.jpg|frame|center|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/> |
| + | | [[File:Haeusleberg turbine 4.jpg|frame|center|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/> |
| + | |- |
| + | | <br/> |
| + | | <br/> |
| + | |- |
| + | | [[File:Haeusleberg turbine 5.jpg|frame|center|Nozzle alignment test.]]<br/> |
| + | | |
| + | |- |
| + | | <br/> |
| + | | |
| |} | | |} |
| | | |
− | ''add respective country category''
| + | <br/> |
| + | |
| + | = Further Information<br/> = |
| + | |
| + | *project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/] |
| + | |
| + | <br/> |
| + | |
| + | = References<br/> = |
| + | |
| + | <references /> |
Revision as of 21:24, 26 March 2014
Overview
Location of the site:
- Country: Germany
- District: Baden-Württemberg
- River: Schanzbach
- GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E
This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: sites.google.com/site/haeusleberg/
Further Information - Project
Start of Construction: December 2011
Date of Commissioning: June 2012
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Turbine: Pelton
Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
A view over the Häusleberg organic farm
|
|
Side view of the installed turbine atop the wooden framed drainage barrel.
|
Top view of the installed turbine atop the wooden framed drainage barrel.
|
|
|
The turbine from below showing the pelton runner at the nozzle mounting bracket.
|
The stator of the direct drive motor during modifications for the 12 V hybrid system.
|
|
|
Nozzle alignment test.
|
|
|
|
Further Information