|
|
| Line 11: |
Line 11: |
| | |- | | |- |
| | | style="width: 194px;" | <span style="line-height: 18px;">Turbine Type:</span> | | | style="width: 194px;" | <span style="line-height: 18px;">Turbine Type:</span> |
| − | | style="width: 390px;" | <span style="line-height: 18;">Pelton</span> | + | | style="width: 390px;" | <span style="line-height: 18px;">Pelton</span> |
| | |- | | |- |
| | | style="width: 194px;" | <span style="line-height: 18px;">Country:</span> | | | style="width: 194px;" | <span style="line-height: 18px;">Country:</span> |
Revision as of 22:47, 26 March 2014
Overview
| Name of the site:
|
El Plan
|
| Country:
|
Nicaragua (GPS Coordinates: ?)
|
| Turbine Type:
|
Pelton
|
| Country:
|
Nicaragua (GPS Coordinates: ?)
|
| Power Output:
|
X kW
|
| Project Status:
|
in operation
|
| Start of Construction:
|
?
|
| Date of Commissioning:
|
?
|
| Comments:
|
?
|
Operation Data
| Head:
|
|
| Flow:
|
|
| Turbine Type:
|
Pelton
|
| Country:
|
Nicaragua (GPS Coordinates: ?)
|
| Power Output:
|
X kW
|
| Start of Construction
|
?
|
| Date of Commissioning:
|
?
|
| Comments:
|
?
|
Technical Information
| Head:
|
|
| Flow:
|
|
| Turbine Type:
|
Pelton
|
| Country:
|
Nicaragua (GPS Coordinates: ?)
|
| Power Output:
|
X kW
|
| Start of Construction
|
?
|
| Date of Commissioning:
|
?
|
| Comments:
|
?
|
Civil Works
| Penstock Diameter:
|
X
|
| Penstock Length:
|
|
| Penstock Material:
|
PVC
|
| Dam Type
|
|
| Dam Construction Material:
|
X kW
|
| Dam Height:
|
?
|
| Dam Length:
|
?
|
| Storage Volume Reservoir:
|
?
|
Electromechanical Equipment
Turbine:
Turbine Maufacturer: (Contact: )
Generator: Generator Manufaturer Generator Capacity
Electrical Transmission
Mini Grid yes Connection to national Grid Voltage Transmission Conductor Diameter of Conductor Transformer Rating kvA
Economic Information
Developer: (Contact: )
Operator: (Contact: )
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Cost: Connected Hounsholds Connection Cost Cost to be covered by houshold
Project Photos