| SOFTWARE UPDATE ANNOUNCEMENT: 30 AUG - 15 SEP
|
Error creating thumbnail: convert: unable to open image `/var/www/ISWiki/prod/current/energypedia/images/0/0a/Icon_Announcement.png': No such file or directory @ error/blob.c/OpenBlob/2641. convert: no images defined `/tmp/transform_2c01f92-1.png' @ error/convert.c/ConvertImageCommand/3044.
|
Hurrah! Your beloved energypedia is getting a new software update to ensure faster and easier knowledge exchange and sharing on energypedia. After the new software update, you can expect a new and updated energypedia with a responsive design.
Hence, from 30 Aug to 15 Sep, energypedia will be on read-only mode and you will not be able to download/upload content or create/edit articles on energypedia.
|
MHP Template
From old.energypedia.info
(Difference between revisions)
|
|
| Line 67: |
Line 67: |
| | | | |
| | <br/> | | <br/> |
| | + | |
| | | | |
| | == Civil Works and Penstock<br/> == | | == Civil Works and Penstock<br/> == |
| Line 73: |
Line 74: |
| | |- | | |- |
| | | style="width: 194px;" | <span style="line-height: 18px;">Dam construction material:</span> | | | style="width: 194px;" | <span style="line-height: 18px;">Dam construction material:</span> |
| − | | style="width: 390px;" | Concrete<span style="line-height: 18px;"></span> | + | | style="width: 390px;" | <br/><span style="line-height: 18px;"></span> |
| | |- | | |- |
| | | style="width: 194px;" | <span style="line-height: 18px;">Dam Dimensions:</span> | | | style="width: 194px;" | <span style="line-height: 18px;">Dam Dimensions:</span> |
| Line 82: |
Line 83: |
| | |- | | |- |
| | | style="width: 194px;" | <span style="line-height: 18px;">Sedimentation Basin material:</span> | | | style="width: 194px;" | <span style="line-height: 18px;">Sedimentation Basin material:</span> |
| − | | style="width: 390px;" | Concrete <span style="line-height: 18px;"></span> | + | | style="width: 390px;" | <br/><span style="line-height: 18px;"></span> |
| | |- | | |- |
| | | style="width: 194px;" | <span style="line-height: 18px;">Sedimentation Basin Dimensions:</span> | | | style="width: 194px;" | <span style="line-height: 18px;">Sedimentation Basin Dimensions:</span> |
| Line 105: |
Line 106: |
| | | style="width: 390px;" | <span style="line-height: 18px;"></span> | | | style="width: 390px;" | <span style="line-height: 18px;"></span> |
| | |} | | |} |
| | + | |
| | + | <br/> |
| | + | |
| | | | |
| | == Electromechanical Equipment<br/> == | | == Electromechanical Equipment<br/> == |
Revision as of 22:16, 27 March 2014
Overview
| Name of the site:
|
|
| Country:
|
|
| Turbine Type:
|
|
| Power Output:
|
|
| Project Status:
|
|
| Comments:
|
|
Operation Data
| Gross Head:
|
|
| Net/Design Head:
|
|
| Flow (design flow):
|
|
| Comments on flow variation during the year:
|
|
Technical Information
Civil Works and Penstock
| Dam construction material:
|
|
| Dam Dimensions:
|
|
| Storage Volume Reservoir:
|
|
| Sedimentation Basin material:
|
|
| Sedimentation Basin Dimensions:
|
|
| Penstock Length:
|
|
| Penstock Diameter at Beginning:
|
|
| Penstock Diameter at End:
|
|
| Penstock Changes of Diameter:
|
|
| Penstock Material:
|
|
| Security Valve:
|
|
Electromechanical Equipment
Turbine
| Turbine Type:
|
|
| Turbine Diameter:
|
|
| Turbine Material:
|
|
| Turbine Manufacturer:
|
|
| Potencial (nominal):
|
24 kW
|
| Rated Head:
|
|
| Rated Flow:
|
|
| Rated Speed:
|
|
| Runaway Speed:
|
|
| Shaft diameter and material:
|
|
| Direction of Rotation:
|
|
| Orientation of Shaft:
|
|
Generator:
| Generator Manufacturer and Model:
|
Stamford
|
| Phases:
|
|
| Potencial (nominal):
|
|
| Nominal voltage:
|
|
| Nominal Speed:
|
|
| Frequency:
|
|
| Isolation Class:
|
|
Mechanical Transmission / Coupling
| Type of Belt:
|
|
| Belt Manufacturer:
|
|
| Distance between Pulleys:
|
|
| Diameter of Generator Pulley:
|
|
| Diameter of Generator Pulley:
|
|
Control System
| Control System Manufacturer and Model:
|
|
| Type of Control:
|
|
| Capacity:
|
|
Electrical Transmission
| Mini Grid:
|
yes
|
| Connection to national Grid:
|
|
| Grid Voltage:
|
|
| Diameter of Conductor:
|
|
| Transformer Rating:
|
|
Economic Information
| Developer: (Contact: )
|
|
| Start of Construction:
|
|
| Date of Commissioning:
|
|
| Ownership / Operation Model:
|
|
| Operator:
|
|
| Tariff structure:
|
|
| Connected Housholds:
|
45
|
| Connection Cost Cost to be covered by houshold:
|
|
| Overall Project Costs:
|
|
Project Photos