Line 1: |
Line 1: |
− |
| |
− |
| |
| | | |
| = Overview<br/> = | | = Overview<br/> = |
Line 36: |
Line 34: |
| == MHP costs in Rwanda<br/> == | | == MHP costs in Rwanda<br/> == |
| | | |
− | *in [[Results GIZ Kigali MHP meeting 2011|Rwanda in 2011 various cost categories for MHP were analysed.]] | + | *in [[Results_GIZ_Kigali_MHP_meeting_2011|Rwanda in 2011 various cost categories for MHP were analysed.]] |
− | *A special chapter about the [[Estimation of management costs|management costs]] was developed, too. | + | *A special chapter about the [[Micro-Hydropower_Plants_-_Estimation_of_Management_Costs|management costs]] was developed, too. |
| | | |
| + | <br/> |
| | | |
| = Further Information = | | = Further Information = |
− |
| |
− |
| |
| | | |
| = References<br/> = | | = References<br/> = |
Line 48: |
Line 45: |
| <references /> | | <references /> |
| | | |
− | [[Category:Financing_and_Funding]]
| |
− | [[Category:Rwanda]]
| |
− | [[Category:Hydro]]
| |
| [[Category:Micro_Hydro]] | | [[Category:Micro_Hydro]] |
| + | [[Category:Hydro]] |
| + | [[Category:Rwanda]] |
| + | [[Category:Financing_and_Funding]] |
Revision as of 13:38, 9 July 2014
Overview
Micro-Hydro Power (MHP) projects come along with a big variety of costs. Planning and developing a site brings a number of country, probalby regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework conditition might occur. A clear cost analysis upfront is highy recommended.
Cost factors are eventually:
a locations feasibility check by respective personal
land/water ownership/usage
civil construction (canal, wear, intake, pipes, powerhouse)
electro-mechanical equipment (turbine, generator, load controller)
power grid (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...)
opperation & maintenance (collecting tarrifs, running and maintaining the assets)
Land & water requirements are mostly small. But there may be interference with existing schemes (irrigation) or legal issues to be considered.
Order to delivery of electro-mechanical equipment may take half a year. Ensure to order in time.
Costs for power lines and household connections often require a substantial amount from the overall budged.
Any mhp scheme supplying a group of households has to install fixed procedures to cover operation & maintenance.
This includes the collection of tariffs from each user.
MHP costs in Rwanda