Line 1: |
Line 1: |
| | | |
− | == Overview ==
| + | = Overview<br/> = |
| | | |
| <u>Net-metering is:</u><br/> | | <u>Net-metering is:</u><br/> |
Line 6: |
Line 6: |
| *a system, in which the active current / electricity generated by consumers in decentralized micro- and mini- generators, is offset with the metered consumption<ref>ANEEL 2012. Regulierung Nr. 482 vom 17. April 2012 der Nationalen fckLREnergieagentur – ANEEL (Brazil)</ref><br/> | | *a system, in which the active current / electricity generated by consumers in decentralized micro- and mini- generators, is offset with the metered consumption<ref>ANEEL 2012. Regulierung Nr. 482 vom 17. April 2012 der Nationalen fckLREnergieagentur – ANEEL (Brazil)</ref><br/> |
| <div><br/></div> | | <div><br/></div> |
− | [[Net Metering#toc|►Go to Top]]
| |
− |
| |
| = How does net metering work?<br/> = | | = How does net metering work?<br/> = |
| | | |
Line 33: |
Line 31: |
| *'''Billing: '''billing is based on the net amount of electricity consumed per billing period - in other words, the difference between the amount of electricity consumed and the amount produced. If a household produces more electricity than it consumes, the surplus can usually be carried over (many times with a validity time limit attached), or be given to the utility without any compensation. | | *'''Billing: '''billing is based on the net amount of electricity consumed per billing period - in other words, the difference between the amount of electricity consumed and the amount produced. If a household produces more electricity than it consumes, the surplus can usually be carried over (many times with a validity time limit attached), or be given to the utility without any compensation. |
| </div> | | </div> |
− | <br/>[[Net Metering#toc|►Go to Top]] | + | <br/> |
| | | |
| = How and Where Has Net Metering Been Applied<br/> = | | = How and Where Has Net Metering Been Applied<br/> = |
Line 47: |
Line 45: |
| <u>The following table provides an overview of countries where net metering policies are currently in use:</u><ref>REN21, 2012. "Renewables 2012 Global Status Report", REN21 Secretariat, Paris</ref> | | <u>The following table provides an overview of countries where net metering policies are currently in use:</u><ref>REN21, 2012. "Renewables 2012 Global Status Report", REN21 Secretariat, Paris</ref> |
| | | |
− | {| align="center" cellspacing="1" cellpadding="1" border="1" style="font-size: 14px; width: 800px" | + | {| cellspacing="1" cellpadding="1" border="1" align="center" style="font-size: 14px; width: 800px" |
| |- | | |- |
| | | | | |
Line 292: |
Line 290: |
| <u>Net metering is also being developed and piloted in the following low-income countries:</u> | | <u>Net metering is also being developed and piloted in the following low-income countries:</u> |
| | | |
− | {| align="center" cellspacing="1" cellpadding="1" border="1" style="width: 800px; font-size: 14px" | + | {| cellspacing="1" cellpadding="1" border="1" align="center" style="width: 800px; font-size: 14px" |
| |- | | |- |
| | | | | |
Line 323: |
Line 321: |
| |} | | |} |
| | | |
− | <br/>[[Net Metering#toc|►Go to Top]] | + | <br/><br/> |
| | | |
| = Pro's and Con's of Net Metering<br/> = | | = Pro's and Con's of Net Metering<br/> = |
Line 337: |
Line 335: |
| <br/> | | <br/> |
| | | |
− | {| cellspacing="1" cellpadding="1" border="1" style="width: 800px; font-size: 14px" | + | {| cellspacing="1" cellpadding="1" border="1" style="width: 800px; font-size: 14px" |
| |- | | |- |
| | <u>'''Grid parity''' can be defined in two ways<ref>Farrell, J. 2012. "Solar Grid Parity 101". http://www.ilsr.org/solar-grid-parity-101/</ref>:</u> | | | <u>'''Grid parity''' can be defined in two ways<ref>Farrell, J. 2012. "Solar Grid Parity 101". http://www.ilsr.org/solar-grid-parity-101/</ref>:</u> |
Line 365: |
Line 363: |
| *Both technical and regulatory capacity is needed to ensure that net-metering systems are installed correctly, that distribution networks are able to accommodate net-metered systems and that the appropriate regulation is developed and implemented. | | *Both technical and regulatory capacity is needed to ensure that net-metering systems are installed correctly, that distribution networks are able to accommodate net-metered systems and that the appropriate regulation is developed and implemented. |
| | | |
− | [[Net Metering#toc|►Go to Top]]
| + | |
| | | |
| = Success Factors for Net Metering = | | = Success Factors for Net Metering = |
Line 375: |
Line 373: |
| *'''Regulatory capacity: '''regulatory authorities need to have the capacity to ensure that net metering policies and regulations are not only well developed, but also properly implemented. | | *'''Regulatory capacity: '''regulatory authorities need to have the capacity to ensure that net metering policies and regulations are not only well developed, but also properly implemented. |
| | | |
− | [[Net Metering#toc|►Go to Top]]
| |
| | | |
− | = [http://www.giz.de/en/ GIZ] Experience with Net Metering<br/> =
| |
| | | |
| + | = GIZ Experience with Net Metering<br/> = |
| + | |
| + | ► [http://www.giz.de/en/ Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ)] |
| *'''[[Net Metering Brazil (FRE)|Brazil]]''': The [https://www.giz.de/en/worldwide/12565.html GIZ Energy Programme, “Renewable Energy Sources and Energy Efficiency”], is running from 2013 to 2015<ref>GIZ, "Energy programme for Brazil" http://www.giz.de/de/weltweit/12565.html</ref>. Among other activities, GIZ is assisting the [http://www.aneel.gov.br/?idiomaAtual=1 Brazilian Energy Regulatory Authority (ANEEL)], local governmental institutions and other stakeholders to develop and implement net-metering policy<ref name="Project Development Program (PDP). 2011.">Project Development Program (PDP). 2011. "Grid connection of solar PV: Technical and economical assessment of net-metering in Kenya". GIZ, Federal Ministry of Economics & Technology.</ref>. Net metering legislation was enacted in April 2012, covering all renewable energy systems up to 1 MW<ref>Figueiredo, R. 2012. "Brazil's attempt at distributed generation: will net metering work?" Renewable Energy World. http://www.renewableenergyworld.com/rea/news/article/2012/07/brazils-attempt-at-distributed-generation-will-net-metering-work</ref>.<br/> | | *'''[[Net Metering Brazil (FRE)|Brazil]]''': The [https://www.giz.de/en/worldwide/12565.html GIZ Energy Programme, “Renewable Energy Sources and Energy Efficiency”], is running from 2013 to 2015<ref>GIZ, "Energy programme for Brazil" http://www.giz.de/de/weltweit/12565.html</ref>. Among other activities, GIZ is assisting the [http://www.aneel.gov.br/?idiomaAtual=1 Brazilian Energy Regulatory Authority (ANEEL)], local governmental institutions and other stakeholders to develop and implement net-metering policy<ref name="Project Development Program (PDP). 2011.">Project Development Program (PDP). 2011. "Grid connection of solar PV: Technical and economical assessment of net-metering in Kenya". GIZ, Federal Ministry of Economics & Technology.</ref>. Net metering legislation was enacted in April 2012, covering all renewable energy systems up to 1 MW<ref>Figueiredo, R. 2012. "Brazil's attempt at distributed generation: will net metering work?" Renewable Energy World. http://www.renewableenergyworld.com/rea/news/article/2012/07/brazils-attempt-at-distributed-generation-will-net-metering-work</ref>.<br/> |
| *'''[[Kenya Energy Situation|Kenya]]''': Through the [http://www.renewables-made-in-germany.com/en/networking-in-your-country/renewable-energy-project-development-programme-pdp.html Project Development Programme (PDP)] and a [http://www.developpp.de/en/content/developppde development partnership (develoPPP)], GIZ has been supporting the Kenyan authorities in developing net metering legislation and policy. Net metering has now been included in draft energy policy, forming part of wider energy sector reforms taking place. Two pilot projects feeding solar PV into the national [[Portal:Grid|grid]] have been launched: a 60 kW installation at the SOS Children’s Village in Mombasa; and a 515 kW system on the roof of the [http://www.unep.org/roa/Programmes/KenyaCountryProgramme/tabid/51365/Default.aspx UNEP offices]<ref name="Franz. M. 2012.">Franz. M. 2012. "Net metering for small RE - the next big show in town? Background and evidence from Kenya and Ghana." Presented at the GIZ Fachverbund Energy Africa, Dakar, Senegal.</ref>. The [http://www.euei-pdf.org/ EU Energy Initiative Partnership Dialogue Facility (EUEI PDF)] is also providing further support to formulate net-metering regulation in the country through a project under the [http://www.euei-pdf.org/sites/default/files/files/field_pblctn_file/RECPstrategy2020en_lowres_0.pdf Renewable Energy Cooperation Programme (RECP)].<br/> | | *'''[[Kenya Energy Situation|Kenya]]''': Through the [http://www.renewables-made-in-germany.com/en/networking-in-your-country/renewable-energy-project-development-programme-pdp.html Project Development Programme (PDP)] and a [http://www.developpp.de/en/content/developppde development partnership (develoPPP)], GIZ has been supporting the Kenyan authorities in developing net metering legislation and policy. Net metering has now been included in draft energy policy, forming part of wider energy sector reforms taking place. Two pilot projects feeding solar PV into the national [[Portal:Grid|grid]] have been launched: a 60 kW installation at the SOS Children’s Village in Mombasa; and a 515 kW system on the roof of the [http://www.unep.org/roa/Programmes/KenyaCountryProgramme/tabid/51365/Default.aspx UNEP offices]<ref name="Franz. M. 2012.">Franz. M. 2012. "Net metering for small RE - the next big show in town? Background and evidence from Kenya and Ghana." Presented at the GIZ Fachverbund Energy Africa, Dakar, Senegal.</ref>. The [http://www.euei-pdf.org/ EU Energy Initiative Partnership Dialogue Facility (EUEI PDF)] is also providing further support to formulate net-metering regulation in the country through a project under the [http://www.euei-pdf.org/sites/default/files/files/field_pblctn_file/RECPstrategy2020en_lowres_0.pdf Renewable Energy Cooperation Programme (RECP)].<br/> |
Line 384: |
Line 383: |
| *'''[[Morocco Energy Situation|Morocco]]''': The [https://www.giz.de/en/downloads/giz2012-renewable-energy-peren-en.pdf “Promotion of Renewable Energy and Energy Efficiency” project], implemented by GIZ, has as one of its components the assessment of the potential for grid-connected solar PV in Morocco<ref>GIZ. 2012. "The promotion of renewable energy and energy efficiency - the 'PEREN' project". https://www.giz.de/en/downloads/giz2012-renewable-energy-peren-en.pdf</ref>. The assessment has shown that Morocco will achieve grid-parity for all customer categories by 2013. GIZ is also developing a “million roofs program” proposal, which is dependent on net metering. While there are currently no specific net metering regulations in place, a law published in 2010 makes it possible to connect medium- and high-voltage renewable energy based systems to the grid<ref name="Project Development Program (PDP). 2011.">Project Development Program (PDP). 2011. "Grid connection of solar PV: Technical and economical assessment of net-metering in Kenya". GIZ, Federal Ministry of Economics & Technology.</ref>.<br/> | | *'''[[Morocco Energy Situation|Morocco]]''': The [https://www.giz.de/en/downloads/giz2012-renewable-energy-peren-en.pdf “Promotion of Renewable Energy and Energy Efficiency” project], implemented by GIZ, has as one of its components the assessment of the potential for grid-connected solar PV in Morocco<ref>GIZ. 2012. "The promotion of renewable energy and energy efficiency - the 'PEREN' project". https://www.giz.de/en/downloads/giz2012-renewable-energy-peren-en.pdf</ref>. The assessment has shown that Morocco will achieve grid-parity for all customer categories by 2013. GIZ is also developing a “million roofs program” proposal, which is dependent on net metering. While there are currently no specific net metering regulations in place, a law published in 2010 makes it possible to connect medium- and high-voltage renewable energy based systems to the grid<ref name="Project Development Program (PDP). 2011.">Project Development Program (PDP). 2011. "Grid connection of solar PV: Technical and economical assessment of net-metering in Kenya". GIZ, Federal Ministry of Economics & Technology.</ref>.<br/> |
| | | |
− | [[Net Metering#toc|►Go to Top]]
| + | |
| | | |
| = Further Information<br/> = | | = Further Information<br/> = |
Line 392: |
Line 391: |
| *[[Metering and Billing Systems|Metering and Billing Systems]]<br/> | | *[[Metering and Billing Systems|Metering and Billing Systems]]<br/> |
| | | |
− | [[Net Metering#toc |►Go to Top]]
| + | <br/> |
− | | + | |
| | | |
| = References = | | = References = |
Line 399: |
Line 397: |
| <references /><br/> | | <references /><br/> |
| | | |
− | [[Category:Grid]]
| |
| [[Category:Net_Metering]] | | [[Category:Net_Metering]] |
| + | [[Category:Grid]] |
Net metering means that both the electricity produced and consumed by a household or investor is measured. The prerequisite for net metering is economic viability of the net-metered electricity source compared to the grid price. This is also referred to as grid parity, a situation where it is cheaper to produce one's own electricity than to buy it from the national utility.
Net metering has been successfully implemented in both developed and developing countries.
The economic case is primarily built on the fact that certain renewable energy generation costs have reached, or will shortly reach, grid parity in many developing countries.