|   | |HPDBCountry=Ethiopia  |   | |HPDBCountry=Ethiopia  | 
|   | |HPDBCity/Town=District: Bona  |   | |HPDBCity/Town=District: Bona  | 
| − | |HPDBCoordinates=6º34’40’’N 38º41’50.3’’ E  | + | |HPDBCoordinates=6°34’40’’ N, 38°41’50.3’’ E  | 
|   | |HPDBStream Name=Gange  |   | |HPDBStream Name=Gange  | 
|   | |HPDBOperator=Gobecho Genet Electric users cooperative/Community based cooperative Society  |   | |HPDBOperator=Gobecho Genet Electric users cooperative/Community based cooperative Society  | 
| Line 12: | 
Line 12: | 
|   | |HPDBGenerator Capacity=10kW  |   | |HPDBGenerator Capacity=10kW  | 
|   | |HPDBCommentTI=A.C. Synchronous Generator/ Power 10 kW, 400 V, 50 Hz, 1500r/min, 3 phase  |   | |HPDBCommentTI=A.C. Synchronous Generator/ Power 10 kW, 400 V, 50 Hz, 1500r/min, 3 phase  | 
| − | |HPDBMini Grid=No  | + | |HPDBMini Grid=Yes  | 
|   | |HPDBDonor/Financier=GIZ EnDev  |   | |HPDBDonor/Financier=GIZ EnDev  | 
|   | |HPDBTariff Levels=Flat rate/monthly based per appliance  |   | |HPDBTariff Levels=Flat rate/monthly based per appliance  | 
|   | }}  |   | }}  | 
|   | further information: https://energypedia.info/index.php/File:Fact_sheet_Gobecho.pdf  |   | further information: https://energypedia.info/index.php/File:Fact_sheet_Gobecho.pdf  | 
		Latest revision as of 08:13, 3 September 2012
Back to the Hydropower Sites Database
  General Information 
|  Country:
 | 
 Ethiopia
 | 
|  City/Town:
 | 
 District: Bona
 | 
|  Coordinates (Powerhouse):
 | 
 The following coordinate was not recognized: 6°34’40’’ N, 38°41’50.3’’ E.The following coordinate was not recognized: 6°34’40’’ N, 38°41’50.3’’ E.
 | 
|  Year of Commission:
 | 
 | 
|  Basin Name:
 | 
 | 
|  Stream Name:
 | 
 Gange
 | 
|  Developer:
 | 
 | 
|  Operator:
 | 
 Gobecho Genet Electric users cooperative/Community based cooperative Society
 | 
|  Project Status:
 | 
 | 
|  Any other uses of the water source:
 | 
 | 
|  Contact:
 | 
 | 
|  Comment:
 | 
 | 
|  Link to Photos:
 | 
 https://energypedia.info/index.php/MHP_Gobecho_I
 | 
  Technical Information 
|  Power: (kW)
 | 
 7
 | 
|  Energy (kWh/a):
 | 
 | 
|  Capacity Factor (%):
 | 
 | 
|  Penstock Diameter (mm):
 | 
 | 
|  Penstock Length (m):
 | 
 | 
|  Penstock Material (m³/s):
 | 
 | 
|  Maximum Flow of the Penstock (m³/s):
 | 
 | 
|  Minimum Flow of the Stream (m³/s):
 | 
 | 
|  Head (m):
 | 
 | 
|  Turbine Type:
 | 
 cross flow turbine (T-3)
 | 
|  Turbine Manufacturer:
 | 
 SELAM
 | 
|  Generator Type:
 | 
 Synchronous
 | 
|  Generator Capacity (kW):
 | 
 10kW
 | 
|  Generator Manufacturer:
 | 
 | 
|  Comment:
 | 
 A.C. Synchronous Generator/ Power 10 kW, 400 V, 50 Hz, 1500r/min, 3 phase
 | 
  Mini/Island Grid Information 
|  Mini Grid:
 | 
 Yes
 | 
|  Load Control Information:
 | 
 | 
|  Connection Type:
 | 
 | 
|  Public Lighting:
 | 
 | 
|  Length of Transmission Line (m):
 | 
 | 
|  Voltage (v):
 | 
 | 
|  Transmission Conductor (type) :
 | 
 | 
|  Diameter of Conductor (mm²):
 | 
 | 
|  Transformer Rating (kVA):
 | 
 | 
|  Link to Grid:
 | 
 | 
|  S.W.E.R:
 | 
 | 
|  Operational Period (Xdays/year):
 | 
 | 
|  Comment:
 | 
 | 
  Dam Information 
| 
 Dam Type:
 
 | 
 | 
|  Dam Construction Material:
 | 
 | 
|  Dam Height [m]:
 | 
 | 
|  Length of Dam [m]:
 | 
 | 
|  Storage Volume of Reservoir (m³):
 | 
 | 
|  Flood Storage of Reservoir:
 | 
 | 
|  Channel Material:
 | 
 | 
|  Comment:
 | 
 | 
  Economic Information 
| Cost (€):
 | 
 | 
|  Donor/Financier & Percentage:
 | 
 GIZ EnDev
 | 
|  Tariff Levels:
 | 
 Flat rate/monthly based per appliance
 | 
|  Connected Households:
 | 
 | 
|  Connection Cost (€):
 | 
 | 
|  Cost to be Covered by Households (%):
 | 
 | 
|  Comment:
 | 
 | 
|  Link to Cost Breakdown:
 | 
 | 
further information: https://energypedia.info/index.php/File:Fact_sheet_Gobecho.pdf