(One intermediate revision by one user not shown) |
Line 1: |
Line 1: |
| | | |
− | = Overview = | + | = Overview<br/> = |
− | | + | |
− | During the 1st EnDev East Africa Micro Hydro Workshop a field visit was done to see the Greenpower Project Kirangurwe near Mount Kenya.<br/>
| + | |
| | | |
| + | During the 1st EnDev East Africa Micro Hydro Workshop which was held in 2009 a field visit was done to see the Greenpower Project Kirangurwe near Mount Kenya.<br/> |
| | | |
| + | <br/> |
| | | |
| = Video of the Turbine Arriving at Kirangurwe = | | = Video of the Turbine Arriving at Kirangurwe = |
| | | |
− | During the field visit the turbine arrived. | + | During the field visit the turbine arrived. |
| | | |
| -> You can see a youtube video about this exiting event at [http://www.youtube.com/watch?v=1mxXjmYIXQw Kirangurwe turbine video].<br/><br/> | | -> You can see a youtube video about this exiting event at [http://www.youtube.com/watch?v=1mxXjmYIXQw Kirangurwe turbine video].<br/><br/> |
Line 19: |
Line 19: |
| | | |
| '''Civil works: water intake: no trash rack installed''' | | '''Civil works: water intake: no trash rack installed''' |
| + | |
| *trash rack is required to prevent debris transported by the water flow entering the turbine(s) | | *trash rack is required to prevent debris transported by the water flow entering the turbine(s) |
| *gate for flushing sediments just in front the forebay not installed | | *gate for flushing sediments just in front the forebay not installed |
Line 24: |
Line 25: |
| | | |
| <br/>'''Mechanical works: tubular poles (for transmission lines)''' | | <br/>'''Mechanical works: tubular poles (for transmission lines)''' |
| + | |
| *no fixing points for grounding/earthing (protection) are provided. They are necessary in case live conductors (under tension) are in contact with metal parts of the distribution system to prevent danger for human beings and the system when connected to the grounding/earthing system | | *no fixing points for grounding/earthing (protection) are provided. They are necessary in case live conductors (under tension) are in contact with metal parts of the distribution system to prevent danger for human beings and the system when connected to the grounding/earthing system |
− | *the same risk applies due to missing spring- or feather-rings at the turbine/gen-set | + | *the same risk applies due to missing spring- or feather-rings at the turbine/gen-set |
| *welding points on screws for fixing the distribution-line insulators on the tubular poles not galvanized | | *welding points on screws for fixing the distribution-line insulators on the tubular poles not galvanized |
| *no earthing bars and respective outlets could be detected in the foundation of the power house where metal parts of the turbine/gen-set and other metal parts or housings have to be connected | | *no earthing bars and respective outlets could be detected in the foundation of the power house where metal parts of the turbine/gen-set and other metal parts or housings have to be connected |
Line 34: |
Line 36: |
| | | |
| '''Catchment area:''' | | '''Catchment area:''' |
| + | |
| *a catchment area is an essential part of a (mini) hydro scheme. Due to the retention function as a kind of water reservoir for a more or less steady water flow towards the reservoir and intake it must be maintained carefully. No tree-cutting is allowed under any circumstances in the catchment area. | | *a catchment area is an essential part of a (mini) hydro scheme. Due to the retention function as a kind of water reservoir for a more or less steady water flow towards the reservoir and intake it must be maintained carefully. No tree-cutting is allowed under any circumstances in the catchment area. |
| *it is to be ensured, that appropriate trees are planted which are unavoidable for water retention purposes; eucalyptus trees are not appropriate as their water demand is excessive and may “steal” water required for electricity generation by the turbine(s) | | *it is to be ensured, that appropriate trees are planted which are unavoidable for water retention purposes; eucalyptus trees are not appropriate as their water demand is excessive and may “steal” water required for electricity generation by the turbine(s) |
Line 49: |
Line 52: |
| | | |
| *[http://gpower-africa.org/F_End/Projects.asp Website GPOWER: gpower-africa.org]<br/> | | *[http://gpower-africa.org/F_End/Projects.asp Website GPOWER: gpower-africa.org]<br/> |
| + | *[[Kenya_Energy_Situation|Kenya Energy Situation]]<br/> |
| | | |
− | | + | <br/> |
| | | |
| = References = | | = References = |
During the 1st EnDev East Africa Micro Hydro Workshop which was held in 2009 a field visit was done to see the Greenpower Project Kirangurwe near Mount Kenya.
During the field visit the turbine arrived.
The field trip was accompanied by serval Micro Hydro Experts. There impressions of the project site and setup were share in a expert panel discussion. Here is a summary of their statements: