|
|
(One intermediate revision by one user not shown) |
Line 2: |
Line 2: |
| == Summary == | | == Summary == |
| | | |
− | List of identified problems (including features and causes of degradation) in the upstream and downstream parts of the [[Micro_Hydro_Power_(MHP)_-_Ethiopia,_Gobecho_I|Gobecho]] and [[Micro_Hydro_Power_(MHP)_-_Ethiopia,_Hagara_Sodicha|Hagara Sodicha]] catchments. Italic font in brackets indicates the respective degree of degradation according to the [[File:Checklist_Environment_Assessment_related_to_MHP_projects_in_Ethiopia.pdf|checklist classification]]. Where no degree of degradation is indicated, it was not possible to analyze the respective data according to the checklist. | + | List of identified problems (including features and causes of degradation) in the upstream and downstream parts of the [[Micro_Hydro_Power_(MHP)_-_Ethiopia,_Gobecho_I|Gobecho]] and [[Micro_Hydro_Power_(MHP)_-_Ethiopia,_Hagara_Sodicha|Hagara Sodicha]] catchments. Italic font in brackets indicates the respective degree of degradation according to the [https://energypedia.info/index.php?title=File:Checklist_Environment_Assessment_related_to_MHP_projects_in_Ethiopia.pdf&page=1 checklist classification]. Where no degree of degradation is indicated, it was not possible to analyze the respective data according to the checklist. |
| | | |
| Source: Meder 2011. | | Source: Meder 2011. |
| + | |
| | | |
| == Licensing == | | == Licensing == |
Line 11: |
Line 12: |
| | | |
| <br/><br/><br/><br/><br/><br/> | | <br/><br/><br/><br/><br/><br/> |
| + | |
| + | [[Category:Ethiopia|{{PAGENAME}}]] <br/>[[Category:Hydro|{{PAGENAME}}]] <br/> <br/> |
Latest revision as of 11:51, 8 July 2014
[edit] Summary
List of identified problems (including features and causes of degradation) in the upstream and downstream parts of the Gobecho and Hagara Sodicha catchments. Italic font in brackets indicates the respective degree of degradation according to the checklist classification. Where no degree of degradation is indicated, it was not possible to analyze the respective data according to the checklist.
Source: Meder 2011.
[edit] Licensing
I, the copyright holder of this work, hereby publish it under the following license:
|
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Thumbnail | Dimensions | User | Comment |
current | 12:18, 10 February 2012 | Error creating thumbnail: convert: unable to open image `/var/www/ISWiki/prod/current/energypedia/images/b/b4/EA_List_of_identified_problems.jpg': No such file or directory @ error/blob.c/OpenBlob/2641.
convert: no images defined `/tmp/transform_5e7950d-1.jpg' @ error/convert.c/ConvertImageCommand/3044.
| 1,279 × 805 (124 KB) | ***** (***** | *****) | List of identified problems (including features and causes of degradation) in the upstream and downstream parts of the Gobecho and Hagara Sodicha catchments. Italic font in brackets indicates the respective degree of degradation according to the checklist |