SOFTWARE UPDATE ANNOUNCEMENT: 30 AUG - 15 SEP
|
Error creating thumbnail: convert: unable to open image `/var/www/ISWiki/prod/current/energypedia/images/0/0a/Icon_Announcement.png': No such file or directory @ error/blob.c/OpenBlob/2641. convert: no images defined `/tmp/transform_555644b-1.png' @ error/convert.c/ConvertImageCommand/3044.
|
Hurrah! Your beloved energypedia is getting a new software update to ensure faster and easier knowledge exchange and sharing on energypedia. After the new software update, you can expect a new and updated energypedia with a responsive design.
Hence, from 30 Aug to 15 Sep, energypedia will be on read-only mode and you will not be able to download/upload content or create/edit articles on energypedia.
|
Metering and Billing Systems
From old.energypedia.info
(Difference between revisions)
|
|
Line 22: |
Line 22: |
| *dis- and re-connection in case of late payment | | *dis- and re-connection in case of late payment |
| | | |
− | = [[Image:Digital meter.jpg|thumb|right|Digital meter. Its price is about 120-150 USD]] =
| + | <br> <br> |
− | | + | |
− | | [[Image:Standard kWh meter.jpg|thumb|Standard kWh meter. Its price is about 40-50 USD]]
| + | |
− | |
| + | |
− | |}
| + | |
− | | + | |
− | *technique is "state of the art"<br>
| + | |
− | *billing is fair and transparent
| + | |
− | *reading can be uncoupled from tariff collection
| + | |
− | *allows amount and time related tariffs (demand steering)
| + | |
− | | + | |
− | <u>Disadvantages</u>
| + | |
− | | + | |
− | *high costs (metering device)
| + | |
− | *especially at rural areas in dev. countries the investment cost for a meter unit are way out of range<br>
| + | |
− | *dis- and re-connection in case of late payment<br>
| + | |
− | | + | |
− | <br>
| + | |
− | | + | |
− | <br> | + | |
| | | |
| = Pre-paid system with coins or cards = | | = Pre-paid system with coins or cards = |
Line 111: |
Line 92: |
| [[Category:Hydro]] | | [[Category:Hydro]] |
| [[Category:Solar]] | | [[Category:Solar]] |
− | [[Category:metering]] | + | [[Category:Metering]] |
Revision as of 11:08, 2 June 2010
Standard kWh meter
Advantages
Digital meter. Its price is about 120-150 USD
|
Standard kWh meter. Its price is about 40-50 USD
|
- technique is "state of the art"
- billing is fair and transparent
- reading can be uncoupled from tariff collection
- allows amount and time related tariffs (demand steering)
Disadvantages
- high costs (metering device)
- especially at rural areas in dev. countries the investment cost for a meter unit are way out of range
- dis- and re-connection in case of late payment
Pre-paid system with coins or cards
Pre-paid system with coins or cards. Its price is about 40-80 USD
Advantages
- fair and transparent
- no meter reading
- no overdue costs
- no costs for dis- and re-connection
- close to “ability to pay”-variations
- coins less expensive than cards
Disadvantages
- relatively high cost for metering device
- less forgery proof
- costs for re-collection of coins and selling system for coins/cards
Current limiter
Error creating thumbnail: convert: unable to open image `/var/www/ISWiki/prod/current/energypedia/images/a/ab/Current_limiter_1.jpg': No such file or directory @ error/blob.c/OpenBlob/2641.
convert: no images defined `/tmp/transform_2d26cf0-1.jpg' @ error/convert.c/ConvertImageCommand/3044.
Current limiter. The price may be less than 5 USD
Advantages
- simultaneously protecting against overcurrent (actual purpose)
- delimiting peak demand
- no meter reading required; flat rates according to max. amperage
Disadvantages
- danger of fraud and theft of switch fuses
- additional costs for replacement of cut out fuses
- time of usage not considered; less fair
Flat rate
Advantages
- very cheap (no metering or delimiting device)
- especially in rural areas of Indonesia quite common and accepted
- can be combined with number of appliances or installed wattage (social control)
Disadvantages
- provokes waste of electricity, no incentive for saving
- no load control / demand steering possible (peaks)
- less fair
⇒ Back to Solar Section
⇒ Back to Hydro Section