| SOFTWARE UPDATE ANNOUNCEMENT: 30 AUG - 15 SEP
|
Error creating thumbnail: convert: unable to open image `/var/www/ISWiki/prod/current/energypedia/images/0/0a/Icon_Announcement.png': No such file or directory @ error/blob.c/OpenBlob/2641. convert: no images defined `/tmp/transform_4d661b9-1.png' @ error/convert.c/ConvertImageCommand/3044.
|
Hurrah! Your beloved energypedia is getting a new software update to ensure faster and easier knowledge exchange and sharing on energypedia. After the new software update, you can expect a new and updated energypedia with a responsive design.
Hence, from 30 Aug to 15 Sep, energypedia will be on read-only mode and you will not be able to download/upload content or create/edit articles on energypedia.
|
Tekeze
From old.energypedia.info
(Difference between revisions)
|
|
| Line 2: |
Line 2: |
| | |HPDBCountry=Ethiopia | | |HPDBCountry=Ethiopia |
| | |HPDBCity/Town=Amhara | | |HPDBCity/Town=Amhara |
| − | |HPDBCoordinates=Latitude= 13.3492, Longitude= 38.74049 | + | |HPDBCoordinates=13.3492, 38.74049 |
| | |HPDBDate of Commission=2009 | | |HPDBDate of Commission=2009 |
| | |HPDBBasin Name=Tekeze River (a tributary of Atbarah River which is a tributary of the Nile) | | |HPDBBasin Name=Tekeze River (a tributary of Atbarah River which is a tributary of the Nile) |
Latest revision as of 08:09, 3 September 2012
Back to the Hydropower Sites Database
General Information
| Country:
|
Ethiopia
|
| City/Town:
|
Amhara
|
| Coordinates (Powerhouse):
|
13° 20' 57" N, 38° 44' 26" E
|
| Year of Commission:
|
2009
|
| Basin Name:
|
Tekeze River (a tributary of Atbarah River which is a tributary of the Nile)
|
| Stream Name:
|
|
| Developer:
|
|
| Operator:
|
Ethiopian national grid at Mekele
|
| Project Status:
|
Completed
|
| Any other uses of the water source:
|
|
| Contact:
|
|
| Comment:
|
|
| Link to Photos:
|
|
Technical Information
| Power: (kW)
|
300.000
|
| Energy (kWh/a):
|
981.000.000
|
| Capacity Factor (%):
|
37
|
| Penstock Diameter (mm):
|
|
| Penstock Length (m):
|
|
| Penstock Material (m³/s):
|
|
| Maximum Flow of the Penstock (m³/s):
|
119
|
| Minimum Flow of the Stream (m³/s):
|
|
| Head (m):
|
155
|
| Turbine Type:
|
Fracis turbines
|
| Turbine Manufacturer:
|
Dongfang China
|
| Generator Type:
|
|
| Generator Capacity (kW):
|
|
| Generator Manufacturer:
|
Dongfang China
|
| Comment:
|
|
Mini/Island Grid Information
| Mini Grid:
|
No
|
| Load Control Information:
|
|
| Connection Type:
|
|
| Public Lighting:
|
|
| Length of Transmission Line (m):
|
105000
|
| Voltage (v):
|
230000
|
| Transmission Conductor (type) :
|
|
| Diameter of Conductor (mm²):
|
|
| Transformer Rating (kVA):
|
|
| Link to Grid:
|
|
| S.W.E.R:
|
|
| Operational Period (Xdays/year):
|
|
| Comment:
|
|
Dam Information
|
Dam Type:
|
Dam on river with reservoir
|
| Dam Construction Material:
|
Concrete Arch Dam
|
| Dam Height [m]:
|
188
|
| Length of Dam [m]:
|
420
|
| Storage Volume of Reservoir (m³):
|
9310000000
|
| Flood Storage of Reservoir:
|
|
| Channel Material:
|
|
| Comment:
|
|
Economic Information
| Cost (€):
|
364,999,999
|
| Donor/Financier & Percentage:
|
|
| Tariff Levels:
|
|
| Connected Households:
|
|
| Connection Cost (€):
|
|
| Cost to be Covered by Households (%):
|
|
| Comment:
|
Project Financed By: China Exim Bank ($50 million)
|
| Link to Cost Breakdown:
|
|