|   SOFTWARE UPDATE ANNOUNCEMENT: 30 AUG - 15 SEP
  
 | 
 Error creating thumbnail: convert: unable to open image `/var/www/ISWiki/prod/current/energypedia/images/0/0a/Icon_Announcement.png': No such file or directory @ error/blob.c/OpenBlob/2641.  convert: no images defined `/tmp/transform_4aaf495-1.png' @ error/convert.c/ConvertImageCommand/3044.    
 | 
  Hurrah! Your beloved energypedia is getting a new software update to ensure faster and easier knowledge exchange and sharing on energypedia. After the new software update, you can expect a new and updated energypedia with a responsive design.
 Hence, from 30 Aug to 15 Sep, energypedia will be on read-only mode and you will not be able to download/upload content or create/edit articles on energypedia.
 
 | 
 
 
 
        			
        			                    
                    
        			
        			
        				Jatiluhur
        			
        			
                    
                                        
        			
        			
        				        				
        				From old.energypedia.info
        				
        				        				
        				(Difference between revisions)
        				
        				        				        				        				
        				
        				
        				        				
        				
				
				
				
				
			
			     | 
			   | 
			
| Line 2: | 
Line 2: | 
|   | |HPDBCountry=Indonesia  |   | |HPDBCountry=Indonesia  | 
|   | |HPDBCity/Town=Jatimekar  |   | |HPDBCity/Town=Jatimekar  | 
| − | |HPDBCoordinates=Latitude= -6.523, Longitude= 107.389  | + | |HPDBCoordinates=-6.523, 107.389  | 
|   | |HPDBDate of Commission=1967  |   | |HPDBDate of Commission=1967  | 
|   | |HPDBStream Name=Citarum River  |   | |HPDBStream Name=Citarum River  | 
		Latest revision as of 08:10, 3 September 2012
Back to the Hydropower Sites Database
  General Information 
|  Country:
 | 
 Indonesia
 | 
|  City/Town:
 | 
 Jatimekar
 | 
|  Coordinates (Powerhouse):
 | 
 6° 31' 23" S, 107° 23' 20" E
 | 
|  Year of Commission:
 | 
 1967
 | 
|  Basin Name:
 | 
 | 
|  Stream Name:
 | 
 Citarum River
 | 
|  Developer:
 | 
 | 
|  Operator:
 | 
 PT PLN (Persero)
 | 
|  Project Status:
 | 
 Completed
 | 
|  Any other uses of the water source:
 | 
 | 
|  Contact:
 | 
 | 
|  Comment:
 | 
 | 
|  Link to Photos:
 | 
 | 
  Technical Information 
|  Power: (kW)
 | 
 150,000
 | 
|  Energy (kWh/a):
 | 
 790,000,000
 | 
|  Capacity Factor (%):
 | 
 14.5
 | 
|  Penstock Diameter (mm):
 | 
 | 
|  Penstock Length (m):
 | 
 | 
|  Penstock Material (m³/s):
 | 
 | 
|  Maximum Flow of the Penstock (m³/s):
 | 
 | 
|  Minimum Flow of the Stream (m³/s):
 | 
 | 
|  Head (m):
 | 
 | 
|  Turbine Type:
 | 
 | 
|  Turbine Manufacturer:
 | 
 | 
|  Generator Type:
 | 
 | 
|  Generator Capacity (kW):
 | 
 | 
|  Generator Manufacturer:
 | 
 | 
|  Comment:
 | 
 | 
  Mini/Island Grid Information 
|  Mini Grid:
 | 
 No
 | 
|  Load Control Information:
 | 
 | 
|  Connection Type:
 | 
 | 
|  Public Lighting:
 | 
 | 
|  Length of Transmission Line (m):
 | 
 | 
|  Voltage (v):
 | 
 | 
|  Transmission Conductor (type) :
 | 
 | 
|  Diameter of Conductor (mm²):
 | 
 | 
|  Transformer Rating (kVA):
 | 
 | 
|  Link to Grid:
 | 
 | 
|  S.W.E.R:
 | 
 | 
|  Operational Period (Xdays/year):
 | 
 | 
|  Comment:
 | 
 Regional Grid - PT PLN (Persero)
 | 
  Dam Information 
| 
 Dam Type:
 
 | 
 Embankment on Rockfill
 | 
|  Dam Construction Material:
 | 
 | 
|  Dam Height [m]:
 | 
 105
 | 
|  Length of Dam [m]:
 | 
 1200
 | 
|  Storage Volume of Reservoir (m³):
 | 
 3,430,000,000
 | 
|  Flood Storage of Reservoir:
 | 
 | 
|  Channel Material:
 | 
 | 
|  Comment:
 | 
 140,000,000m lost to sedimentation
 | 
  Economic Information 
| Cost (€):
 | 
 | 
|  Donor/Financier & Percentage:
 | 
 | 
|  Tariff Levels:
 | 
 | 
|  Connected Households:
 | 
 | 
|  Connection Cost (€):
 | 
 | 
|  Cost to be Covered by Households (%):
 | 
 | 
|  Comment:
 | 
 | 
|  Link to Cost Breakdown:
 | 
 |