|
|
Line 1: |
Line 1: |
| + | |
| + | {{Revision|(Red highlighted links don't have an existance web page. Please provide the link address).}} |
| + | |
| = Introduction = | | = Introduction = |
| | | |
Line 4: |
Line 7: |
| | | |
| We recommend to: | | We recommend to: |
− | | + | page |
| *use the recommended [[Indicator rural electrification and stoves|'''list of indicators''']] | | *use the recommended [[Indicator rural electrification and stoves|'''list of indicators''']] |
| *conduct '''baseline studies '''before project intervention and impact studies after households, social infrastructure or SMEs got access to a form of modern energy | | *conduct '''baseline studies '''before project intervention and impact studies after households, social infrastructure or SMEs got access to a form of modern energy |
Revision as of 08:39, 21 November 2012
Error creating thumbnail: convert: unable to open image `/var/www/ISWiki/prod/current/energypedia/images/7/78/M-revision.PNG': No such file or directory @ error/blob.c/OpenBlob/2641. convert: no images defined `/tmp/transform_1a4f572-1.png' @ error/convert.c/ConvertImageCommand/3044.
|
This article needs to be revised. Please rewrite the article according to the specifications below. Only remove this maintenance box after a thorough revision of this article. See the discussion page for more details or start a discussion there.
In particular the following aspects and passages have been specified to be in need for a revision:
(Red highlighted links don't have an existance web page. Please provide the link address).
|
Introduction
The Impacts Monitoring Group of Energising Development has developed recommendations for a "proper" impact assessments.
We recommend to:
page
- use the recommended list of indicators
- conduct baseline studies before project intervention and impact studies after households, social infrastructure or SMEs got access to a form of modern energy
- use a theory based approach by applying the result chain for developing the study design
- use a mixed methods approach: the logic of the comparative advantages of methods: that means the mix of quantitative (standarised household interviews) and qualitative methods (open/ semi-structured interviews with key persons and households or focus group discussions)
- include control groups if possible (households which do not have acces to modern energy) into your baseline and impact study
- consider research ethics
The following tables show typical steps for baseline and impact studies, which we would recommend and support.
Preparation
Tasks
|
Materials/ Support
|
Library
|
Terms for Consultants/ Enumerators
|
- Sample Terms for national / international consultants
- Sample Terms for enumerators
|
ToR Consultants:
|
Selection Consultant/ Enumerators
|
|
|
Study of available documents and statistics on national development goals and policies, national sector goals and policies, BMZ goals and concept for the partner country
|
- Checklist on relevant development goals
|
|
Developing of Results Chains/ Indicators
|
|
Rural Electrifciation:
Cooking:
|
Developing of Questionnaires, interview guidelines, PRA tools (MAPP), observation criteria and other tools (catalogue of methods)
|
|
Example Questionnaires
PRA tools, Interview Guidelines, Observation criteria etc.
(Impact Studies Material)
|
Sampling/ Selection target Group
|
|
|
Training of Supervisors and Enumerators/ Pretesting
|
- Training Material
- Training Agenda
|
|
Implementation
Task
|
Materials/ Support
|
Library
|
Logistics
|
Checklist on how to implement HH Interviews
|
|
Conducting Interviews
|
|
|
Data entry
|
|
|
Data Analysis/ Reporting
Task
|
Materials/ Support
|
Library
|
Data analysis
|
|
|
Data interpretation – in exchange with the project team (in a workshop)
|
- Checklist for data interpretation
|
|
Report writing (+ summary writing)
|
- Example for report summary
- Example for ICS description (Annex)
|
|
Handover of raw data
|
|
|