| Line 1: | 
Line 1: | 
|   | + |  | 
|   |  |   |  | 
|   |  |   |  | 
| Line 5: | 
Line 6: | 
|   | '''Micro-Hydro Power (MHP)''' projects come along with a big variety of costs. Planning and developing a site brings a number of country, probalby regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework conditition might occur. A clear cost analysis upfront is highy recommended.<br/>  |   | '''Micro-Hydro Power (MHP)''' projects come along with a big variety of costs. Planning and developing a site brings a number of country, probalby regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework conditition might occur. A clear cost analysis upfront is highy recommended.<br/>  | 
|   |  |   |  | 
| − | <u>'''Cost factors''' are eventually:</u><u></u>
  | + | == Cost factors are eventually: ==  | 
|   |  |   |  | 
|   | <span lang="EN-US">a locations <u>feasibility check</u> by respective personal</span>  |   | <span lang="EN-US">a locations <u>feasibility check</u> by respective personal</span>  | 
| Line 19: | 
Line 20: | 
|   | <u>opperation & maintenance</u> (collecting tarrifs, running and maintaining the assets)  |   | <u>opperation & maintenance</u> (collecting tarrifs, running and maintaining the assets)  | 
|   |  |   |  | 
| − | <u>Some '''remarks''' regarding costs:</u>
  | + | == Some remarks regarding costs: ==  | 
|   |  |   |  | 
|   | <span lang="EN-US">Land & water requirements are mostly small. But there may be interference with existing schemes (irrigation) or legal issues to be considered.</span>  |   | <span lang="EN-US">Land & water requirements are mostly small. But there may be interference with existing schemes (irrigation) or legal issues to be considered.</span>  | 
| Line 27: | 
Line 28: | 
|   | <span lang="EN-US">Costs for power lines and household connections often require a substantial amount from the overall budged.</span>  |   | <span lang="EN-US">Costs for power lines and household connections often require a substantial amount from the overall budged.</span>  | 
|   |  |   |  | 
| − | <span lang="EN-US">Any mhp scheme supplying a group of households has to install fixed procedures to cover operation & maintenance.<br/> This includes the collection of tariffs from each user. </span>  | + | <span lang="EN-US">Any mhp scheme supplying a group of households has to install fixed procedures to cover operation & maintenance.<br/>This includes the collection of tariffs from each user.</span>  | 
| − |    | + |  | 
|   |  |   |  | 
|   | + | <br/>  | 
|   |  |   |  | 
|   | <br/>  |   | <br/>  | 
		Revision as of 10:14, 7 January 2014
  Overview
 
Micro-Hydro Power (MHP) projects come along with a big variety of costs. Planning and developing a site brings a number of country, probalby regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework conditition might occur. A clear cost analysis upfront is highy recommended.
  Cost factors are eventually: 
a locations feasibility check by respective personal
land/water ownership/usage
civil construction (canal, wear, intake, pipes, powerhouse)
electro-mechanical equipment (turbine, generator, load controller)
power grid (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...)
opperation & maintenance (collecting tarrifs, running and maintaining the assets)
 
Land & water requirements are mostly small. But there may be interference with existing schemes (irrigation) or legal issues to be considered.
Order to delivery of electro-mechanical equipment may take half a year. Ensure to order in time.
Costs for power lines and household connections often require a substantial amount from the overall budged.
Any mhp scheme supplying a group of households has to install fixed procedures to cover operation & maintenance.
This includes the collection of tariffs from each user.
  MHP costs in Rwanda
 
  Further Information 