| 
			 | 
			
| Line 16: | 
Line 16: | 
|   | '''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012  |   | '''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012  | 
|   |  |   |  | 
| − | <br/>
  | + |    | 
|   |  |   |  | 
|   | '''Ownership / Operation Model:''' Privately owned  |   | '''Ownership / Operation Model:''' Privately owned  | 
| Line 26: | 
Line 26: | 
|   | '''Generator:''' Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)  |   | '''Generator:''' Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)  | 
|   |  |   |  | 
| − | {| cellspacing="1" cellpadding="1" border="1" style="width: 100%;"  | + | {| class="FCK__ShowTableBorders" border="0" cellpadding="3" cellspacing="1" style="width: 100%;"  | 
|   | |-  |   | |-  | 
| − | | add picture of MHP location  | + | | colspan="2" |   | 
| − | | add picture of MHP location  | + | [[File:Haeusleberg farm.jpg|frame|center|A view over the Häusleberg organic farm]]  | 
|   | + |    | 
|   | |-  |   | |-  | 
| − | | add description of picture  | + | | colspan="2" |    | 
| − | | add description of picture  | + | <br/>  | 
|   | + |    | 
|   | |-  |   | |-  | 
| − | | add picture of MHP location<br/>  | + | | [[File:Haeusleberg turbine 1.jpg|frame|center|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/>  | 
| − | | add picture of MHP location  | + | | [[File:Haeusleberg turbine 2.jpg|frame|center|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/>  | 
|   | |-  |   | |-  | 
| − | | add description of picture  | + | | <br/>  | 
| − | | add description of picture  | + | | <br/>  | 
|   | + | |-  | 
|   | + | | [[File:Haeusleberg turbine 3.jpg|frame|center|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/>  | 
|   | + | | [[File:Haeusleberg turbine 4.jpg|frame|center|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/>  | 
|   | + | |-  | 
|   | + | | <br/>  | 
|   | + | | <br/>  | 
|   | + | |-  | 
|   | + | | [[File:Haeusleberg turbine 5.jpg|frame|center|Nozzle alignment test.]]<br/>  | 
|   | + | |   | 
|   | + | |-  | 
|   | + | | <br/>  | 
|   | + | |   | 
|   | |}  |   | |}  | 
|   |  |   |  | 
| − | ''add respective country category''
  | + | <br/>  | 
|   | + |    | 
|   | + | = Further Information<br/> =  | 
|   | + |    | 
|   | + | *project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]  | 
|   | + |    | 
|   | + | <br/>  | 
|   | + |    | 
|   | + | = References<br/> =  | 
|   | + |    | 
|   | + | <references />  | 
		Revision as of 21:24, 26 March 2014
  Overview
 
Location of the site:
- Country: Germany
 - District: Baden-Württemberg
 - River: Schanzbach
 - GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E
 
This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: sites.google.com/site/haeusleberg/
  Further Information - Project
 
Start of Construction: December 2011
Date of Commissioning: June 2012
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Turbine: Pelton
Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
   A view over the Häusleberg organic farm  
 | 
| 
  
 
 | 
    Side view of the installed turbine atop the wooden framed drainage barrel.  
 | 
    Top view of the installed turbine atop the wooden framed drainage barrel.  
 | 
  
 | 
  
 | 
    The turbine from below showing the pelton runner at the nozzle mounting bracket.  
 | 
    The stator of the direct drive motor during modifications for the 12 V hybrid system.  
 | 
  
 | 
  
 | 
    Nozzle alignment test.  
 | 
 | 
  
 | 
 | 
  Further Information
 
  References