| = Introduction = | | = Introduction = |
− | The Kingdom of Cambodia is located in the tropical region of Southeast Asia in the Lower Mekong region. The physical landscape is dominated by the lowland plains around the Mekong River and the Tonle Sap Lake. Of the country area 181,035 Km2, approximately 49% remains covered by forest. There are about 2.5 million hectares of arable land and over 0.5 million hectares of pasture land. The climate in Cambodia is tropical and subject to both southeast and northwest monsoons. Cambodia has a population of around 14.7 million people, with a growth rate of about 1.8 % and an average age of the population of 19 years. <ref name="http://www.un.org/esa/agenda21/natlinfo/countr/cambodia/energy.pdf">http://www.un.org/esa/agenda21/natlinfo/countr/cambodia/energy.pdf</ref> | + | The Kingdom of Cambodia is located in the tropical region of Southeast Asia in the Lower Mekong region. The physical landscape is dominated by the lowland plains around the Mekong River and the Tonle Sap Lake. Of the country area 181,040 Km2, approximately 49% remains covered by forest. There are about 2.5 million hectares of arable land and over 0.5 million hectares of pasture land. The climate in Cambodia is tropical and subject to both southeast and northwest monsoons. Cambodia has a population of around 15.1 million people, with a growth rate of about 1.8 % and an average age of the population of 19 years. <ref name="http://www.un.org/esa/agenda21/natlinfo/countr/cambodia/energy.pdf">http://www.un.org/esa/agenda21/natlinfo/countr/cambodia/energy.pdf</ref> |
| + | Years of war has severely damaged Cambodia’s power sector. After restoration of order in the country the Government has followed a program focused on rehabilitation and development of the basic infrastructure, with the aim of improving the socio - economic conditions. Cambodia is an agricultural country, where over 85% of the population live in rural areas with agriculture as the main profession. Their livelihood depends mainly on agriculture: farming, fishing, livestock, forest and non-forest products. |
| + | For heating, the majority of population use fuel-wood, charcoal, agricultural residues collected mostly from forest areas close to their villages. <ref name="http://www.un.org/esa/agenda21/natlinfo/countr/cambodia/energy.pdf">http://www.un.org/esa/agenda21/natlinfo/countr/cambodia/energy.pdf</ref> For lighting and small electrical appliances (e.g. mobile phone chagrining), about 1.6 million of 2.3 million rural households rely on car batteries and kerosene lighting.<ref name="http://www.phnompenhpost.com/index.php/2011071550395/Business/cambodias-energy-dilemma.html">http://www.phnompenhpost.com/index.php/2011071550395/Business/cambodias-energy-dilemma.html</ref><br/> |
| | | |
− | <br/>Cambodia's infrastructure, including the power sector, was severely damage by years of war. After restoration of order in the country the Government has followed a program focused on rehabilitation and development of the basic infrastructure, with the aim of improving the socio - economic conditions for further step of development. Cambodia is an agricultural country, where over 85% of the people in Cambodia live in rural areas with agriculture as the main profession of subsistence. Their livelihood depends mainly on agriculture: farming, fishing, livestock, forest and non-forest products. For heating, the majority of energy they use are fuel-wood, charcoal, agricultural residues collected mostly from forest areas close to their villages. <ref name="http://www.un.org/esa/agenda21/natlinfo/countr/cambodia/energy.pdf">http://www.un.org/esa/agenda21/natlinfo/countr/cambodia/energy.pdf</ref>
| + | == Major Energy Challenges == |
− | | + | |
− | For lighting and small electrical appliances (e.g. mobile phone charginging), about 1.6 million of 2.3 million rural households rely on car batteries and kerosene lighting.<ref name="http://www.phnompenhpost.com/index.php/2011071550395/Business/cambodias-energy-dilemma.html">http://www.phnompenhpost.com/index.php/2011071550395/Business/cambodias-energy-dilemma.html</ref><br/>
| + | |
− | | + | |
− | <br/>
| + | |
− | | + | |
− | | + | |
− | == Main Energy Challenges ==
| + | |
| | | |
| *high electricity prices - dependent on imported fossil fuels | | *high electricity prices - dependent on imported fossil fuels |
Line 24: |
Line 19: |
| *rising demand, persisting shortages | | *rising demand, persisting shortages |
| *inefficiency in old generating equipment | | *inefficiency in old generating equipment |
− | *incompetitive market structure | + | *in-competitive market structure |
− | *lacking marketable RE techologies/business modells | + | *lacking marketable RE technologies/business models |
− | *RE usage negligibable in energy mix | + | *RE usage negligible in energy mix |
| *lacking financing, legal framework, policies and incentives for energy efficiency and renewable energy investment | | *lacking financing, legal framework, policies and incentives for energy efficiency and renewable energy investment |
| *lacking institutional and educational capacities | | *lacking institutional and educational capacities |
− | *lacking public awareness for energy effciency and renewable energies | + | *lacking public awareness for energy efficiency and renewable energies |
− | <br/>
| + | |
| | | |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| = Energy Situation = | | = Energy Situation = |
| Key Energy Figures for Cambodia (Source: IEA 2008<ref name="http://www.iea.org/stats/indicators.asp?COUNTRY_CODE=KH">http://www.iea.org/stats/indicators.asp?COUNTRY_CODE=KH</ref>) | | Key Energy Figures for Cambodia (Source: IEA 2008<ref name="http://www.iea.org/stats/indicators.asp?COUNTRY_CODE=KH">http://www.iea.org/stats/indicators.asp?COUNTRY_CODE=KH</ref>) |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| {| cellspacing="2" border="0" style="width: 100%;" | | {| cellspacing="2" border="0" style="width: 100%;" |
Line 70: |
Line 58: |
| |} | | |} |
| <br/>Energy Access in Cambodia | | <br/>Energy Access in Cambodia |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| {| cellspacing="2" border="0" style="width: 100%;" | | {| cellspacing="2" border="0" style="width: 100%;" |
Line 107: |
Line 92: |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
| | | |
− | <br/>
| + | = Fossil Fuels = |
− | | + | At the moment, all commercial fossil fuels available in Cambodia (2008: 1.549 ktoe) are imported in the form of LPG(liquidified petroleum gas), gasoline, diesel and other petroleum products.<ref name="http://www.iea.org/stats/balancetable.asp?COUNTRY_CODE=KH">http://www.iea.org/stats/balancetable.asp?COUNTRY_CODE=KH</ref><br/> |
− | | + | |
− | == Fossil Fuels ==
| + | |
− | At the moment, all commercial fossil fuels available in Cambodia (2008: 1.549 ktoe) are imported in the form of LPG, gasoline, diesel and other petroleum products.<ref name="http://www.iea.org/stats/balancetable.asp?COUNTRY_CODE=KH">http://www.iea.org/stats/balancetable.asp?COUNTRY_CODE=KH</ref><br/> | + | |
| | | |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
| | | |
− | <br/>
| + | == Oil and Gas <ref name="http://english.alarabiya.net/articles/2011/07/14/157542.html">http://english.alarabiya.net/articles/2011/07/14/157542.html</ref> == |
− | | + | Oil reserves have been found off the shore of Cambodia. The size of the oil fields are unknown, however, estimated at around 2 billion barrels of oil, which could contribute $2 billion in annual revenues, and about 11 trillion cubic feet of natural gas. |
− | | + | Exploitation was underway when, neighbouring Thailand contested the maritime area claimed by Cambodia based on a 1973 Thai claim on the eastern boundary line of the Gulf in an area known as the Overlapping Claims Area (OCA). In an effort to ease tensions, both countries signed a Memorandum of Understanding in 2001 in which an agreement outlines a framework to solve the maritime dispute. It was however scrapped by the Thai cabinet in 2009 when the Cambodian government appointed ousted prime minister Thaksin Shinawatra as special adviser to Prime Minister Hun Sen. Foreign investors are expected to be strongly involved in the exploitation process. This, together with high corruption rate in Cambodia, contributes to the assumptions of many that the broader population will not profit from these natural resources. |
− | === Oil and Gas <ref name="http://english.alarabiya.net/articles/2011/07/14/157542.html">http://english.alarabiya.net/articles/2011/07/14/157542.html</ref> ===
| + | |
− | Oil reserves have been found off the shore of Cambodia. The size of the oil fields are unkown, estimates reach 2 billion barrels of oil, which could contribute $2 billion in annual revenues, and 11 trillion cubic feet of natural gas. | + | |
− | | + | |
− | Exploitation was underway but neighboring Thailand has contested the maritime area claimed by Cambodia based on a 1973 Thai claim on the eastern boundary line of the Gulf in an area known as the Overlapping Claims Area (OCA). In an effort to ease tensions, both countries signed a Memorandum of Understanding in 2001 in which an agreement outlines a framework to solve the maritime dispute. It was however scrapped by the Thai cabinet in 2009 when the Cambodian government appointed ousted prime minister Thaksin Shinawatra as special adviser to Prime Minister Hun Sen. Foreign investors are expected to be strongly involved in the exploitation process. This, together with high corruption rate in Cambodia, contributes to the assumptions of many that the broader population will not profit from these natural resources. | + | |
| | | |
| With the new Thai government in place from August 2011 an, Cambodia (as well as Thailand due to its growing energy demand) is eager to start negotiations again soon. Chevron was expected to develop the site. | | With the new Thai government in place from August 2011 an, Cambodia (as well as Thailand due to its growing energy demand) is eager to start negotiations again soon. Chevron was expected to develop the site. |
− |
| |
| Chevron Overseas Petroleum (Cambodia) Ltd. is believed to start drilling in offshore Bloc A soon, even though it is quite small. There is some time pressure as work has been delayed, yet not all remaining issues are solved so far. Extraction is to start in 2012. Before this, a possible joint production with Thailand will have to be agreed on. South Korea is also said to be interested in the oil and gas sector in Cambodia. Japanese JOGMEC (Japan Oil Gas Metals Coporation) has signed an MoU with the Cambodian Petroleum Authority on all 17 inland blocs (K. Thim, Siem Reap and Peah Vihear) to investigate data on oil resources. <ref name="http://oilprice.com/Energy/Energy-General/Cambodia-Next-Oil-and-Natural-Gas-Frontier.html">http://oilprice.com/Energy/Energy-General/Cambodia-Next-Oil-and-Natural-Gas-Frontier.html</ref> | | Chevron Overseas Petroleum (Cambodia) Ltd. is believed to start drilling in offshore Bloc A soon, even though it is quite small. There is some time pressure as work has been delayed, yet not all remaining issues are solved so far. Extraction is to start in 2012. Before this, a possible joint production with Thailand will have to be agreed on. South Korea is also said to be interested in the oil and gas sector in Cambodia. Japanese JOGMEC (Japan Oil Gas Metals Coporation) has signed an MoU with the Cambodian Petroleum Authority on all 17 inland blocs (K. Thim, Siem Reap and Peah Vihear) to investigate data on oil resources. <ref name="http://oilprice.com/Energy/Energy-General/Cambodia-Next-Oil-and-Natural-Gas-Frontier.html">http://oilprice.com/Energy/Energy-General/Cambodia-Next-Oil-and-Natural-Gas-Frontier.html</ref> |
| | | |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
| | | |
− | <br/> | + | == Coal<br/> == |
| + | During the period 1958-61, China’s countrywide mineral survey mission reported indication of coal in Kampot, Kampong Thom, Kratie, Stung Treng and Battanbang provinces. One deposit in Phum Talat in Stung Treng province has also been identified and the reserve has been estimated to be around 7 million tons, the exploitation might be feasible for application in cement production and for domestic fuel. The inventory and feasibility study of coal deposits in Cambodia are needed.<ref name="http://www.un.org/esa/agenda21/natlinfo/countr/cambodia/energy.pdf">http://www.un.org/esa/agenda21/natlinfo/countr/cambodia/energy.pdf</ref> |
| + | A '''new coal fired power plant '''is planned to be built in Sihanoukville: 135 MW. With a PPA agreement, the government is obliged to have a guarantee i.e. the Cambodia International Investment Development Group, which is owned by ruling party senator Lao Meng Khin, in case the state-owned Electrucite du Cambodge, fails to pay for the power.<ref name="http://www.bernama.com/bernama/v6/newsbusiness.php?id=659796">http://www.bernama.com/bernama/v6/newsbusiness.php?id=659796</ref> |
| + | Another coal fired power plant (1,800 MW) is planned to be built in Koh Kong by Cambodian tycoon Ly Yong Phat (Cambodia People's Party senator, stakes in hotels, entertainment, utilities, plantations etc in Koh Kong) under a US$3 billion joint-venture agreement with Thai energy firm Ratchaburi Electricity Generating Plc. The ownership structure is unknown and would be Cambodia's largest power station. However, under 90 % of the power (1,600 MW), would be sold to Thailand. Tariffs are currently being negotiated. Also 30 Million USD are going to be invested in power lines between the coal plant and the Tata Hydropower plant in Koh Kong.From the Thai side, this project is attractive as in Thailand the company has received very strong criticism from environmentalists on projects like this - now this problem is being outsourced to Cambodia. The Cambodian government should conduct a proper environmental impact assessment for the plant. Marketing the power domestically could drop power prices to $0.04, down from the current $0.17, one of the highest rates in the region. Yet the plant would far exceed the country’s current demand for power.<ref name="http://www.phnompenhpost.com/index.php/2012032955308/Business/koh-kong-power-to-go-to-thais.html">http://www.phnompenhpost.com/index.php/2012032955308/Business/koh-kong-power-to-go-to-thais.html</ref> |
| | | |
− |
| |
− | === Coal<br/> ===
| |
− | During the period 1958-61, a mineral countrywide survey mission from China reported indication of coa l in Kampot, Kampong Thom, Kratie, Stung Treng and Battanbang provinces. One deposit in Phum Talat in Stung Treng province has been identified and the reserve has been estimated around 7 million tons, the exploitation might be feasible for application in cement production and for domestic fuel. The inventory and feasibility study of coal deposits in Cambodia are needed.<ref name="http://www.un.org/esa/agenda21/natlinfo/countr/cambodia/energy.pdf">http://www.un.org/esa/agenda21/natlinfo/countr/cambodia/energy.pdf</ref>
| |
− |
| |
− | <br/>
| |
− |
| |
− | A '''new coal fired power plant '''is planned to be built in Sihanoukville: 135 MW. On top of a PPA, the government obliged to a guarantee with the Cambodia International Investment Development Group, which is owned by ruling party senator Lao Meng Khin, in case the state-owned Electrucite du Cambodge, fails to pay for the power. Shandong Licun to operate Leader Universal, wholly-owned subsidiary, Cambodian Energy Ltd Powr Plant in Sihanoukville.<ref name="http://www.bernama.com/bernama/v6/newsbusiness.php?id=659796">http://www.bernama.com/bernama/v6/newsbusiness.php?id=659796</ref>
| |
− |
| |
− | <br/>
| |
− |
| |
− | Another coal fired power plant (1,800 MW) is planned to be built in Koh Kong by Cambodian tycoon Ly Yong Phat (Camboida People's Party senator, stakes in hotels, entertainment, utilities, platations etc in Koh Kong) under a US$3 billion joint-venture agreement with Thai energy firm Ratchaburi Electricity Generating Plc. he owenership structure is unknown. TThis would be Cambodia's largest power station. Yet, just under 90 % of the power (1,600 MW), would be sold to Thailand. Construction is to start soon (2012) . Tariffs are currently being negotiated.Also 30 Million USD are going to be invested in power lines between the coal plant and the Tata Hydropower plant in Koh Kong.From the Thai side, this project is attractive as in Thailand the company has received very strong criticism from environmentalists on projects like this - now this problem is being outsourced to Cambodia. The Cambodian government should conduct a proper environmental impact assessment for the plant. Marketing the power domestically could drop power prices to $0.04, down from the current $0.17, one of the highest rates in the region. Yet the plant would far exceed the country’s current demand for power.<ref name="http://www.phnompenhpost.com/index.php/2012032955308/Business/koh-kong-power-to-go-to-thais.html">http://www.phnompenhpost.com/index.php/2012032955308/Business/koh-kong-power-to-go-to-thais.html</ref>
| |
− |
| |
− | <br/>
| |
| | | |
| '''3 coal operated power plants are planned, with several extension/construction phases - further details not available:''' | | '''3 coal operated power plants are planned, with several extension/construction phases - further details not available:''' |
− |
| |
− | <br/>
| |
− |
| |
− |
| |
| *plant 1 of 200 MW: 100 MW (phase 1 in 2012), 100 MW (phase 2 in 2013) | | *plant 1 of 200 MW: 100 MW (phase 1 in 2012), 100 MW (phase 2 in 2013) |
| *plant 2 of 700 MW: 100 MW each year from 2014-2018, 200 MW in 2019 | | *plant 2 of 700 MW: 100 MW each year from 2014-2018, 200 MW in 2019 |
Line 155: |
Line 118: |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
| | | |
− | <br/>
| + | = Renewable Energy<ref name="http://agmhp.aseanenergy.org/focus-countries/2009/09/30/renewable-energy-in-the-kingdom-of-cambodia">http://agmhp.aseanenergy.org/focus-countries/2009/09/30/renewable-energy-in-the-kingdom-of-cambodia</ref> = |
− | | + | Cambodia has abundant RE resources such as mini/micro/pico hydropower, solar, biomass and other.At present, the development of RE sources in Cambodia is very slow in comparison with its neighboring countries, because of the lack of experiences and funds, and inadequate data. Hence the utilization of these sources is also insignificant in the contribution to the total energy supply mix, which is mainly based on imported fuel oil for power generation. |
− | | + | In order to promote RE development, Cambodia (in late 2011/ early 2012) is working on a RE strategy which lays down the policy intention, objectives and guidelines for developing the requisite infrastructure for providing renewable electricity services in rural areas. |
− | == Renewable Energy<ref name="http://agmhp.aseanenergy.org/focus-countries/2009/09/30/renewable-energy-in-the-kingdom-of-cambodia">http://agmhp.aseanenergy.org/focus-countries/2009/09/30/renewable-energy-in-the-kingdom-of-cambodia</ref> ==
| + | |
− | The Rural Electrification Strategy (RES) of the Royal Government of Cambodia (RGC) policy for rural electrification aims to substantially scale up access to electricity services for rural area, where about 85% of the Cambodian population lives there and today only 15% of them has access to electricity services and at the same time to improve the standard of living, reduce poverty and foster economic development.
| + | |
− | | + | |
− | The important part of RES is the mobilization of Cambodian Renewable Energy (RE) sources, where they are cost effective, and the promotion of RE technologies.
| + | |
− | | + | |
− | In order to promote RE development, the RGC (in late 2011/ early 2012) is working on a RE strategy which lays down the policy intention, objectives and guidelines for developing the requisite infrastructure for providing renewable electricity services in rural areas.
| + | |
− | | + | |
− | Cambodia has abundant RE sources such as mini/micro/pico hydropower, solar, biomass and other. | + | |
− | | + | |
− | At present, the development of RE sources in Cambodia is very slow in comparison with its neighbouring countries, because of the lack of experiences and funds, and inadequate data. Hence the utilization of these sources is also insignificant in the contribution to the total energy supply mix, which is mainly based on imported fuel oil for power generation. | + | |
| | | |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
| | | |
− | <br/>
| + | == Biomass == |
| + | Biomass is the main source of energy for Cambodia, mainly in the form of the wood and charcoal. Wood-fuel serves about 85% of the total energy demand and is used for domestic cooking and also extensively by industries, but currently is not used for power generation. |
| | | |
| + | The New Energy and Industrial Technology Development Organization (NEDO) has conducted an assessment of the potential for using biomass as a source of renewable energy in Cambodia.Based on existing crop and livestock residues and if assumes 35% conversion efficiency, the preliminary assessment of biomass generation potential estimate at around 18.852 GWh/yr with 2 MW already exploited. |
| | | |
− | === Biomass ===
| + | '''Biomass gasification''' is currently being further looked into:more and more rice mills (rice husk), ice factories (wood) and garment factories (wood) are using gasifiers. Also, rural electricity enterprises (REE) which supply rural villages with basic electricity services are increasingly evaluating biomass gasifiers due to increasing diesel prices. Currently roughly 150 biomass gasifiers have been installed throughout Cambodia, mostly using dual-fuel mode thus replacing up to 80% of diesel. In some cases, gas engines have been installed. Estimates see a market of up to 600 more medium sized gasifiers (100-300kW), and maybe 50 larger gasifiers (uo to 1MW). |
− | Biomass is the main source of energy for Cambodia, mainly in the form of the wood and charcoal. Wood-fuel serves about 85% of the total energy demand and is used for domestic cooking and also extensity by industry, but currently is not used for power generation. | + | |
| | | |
− | The New Energy and Industrial Technology Development Organization (NEDO) has conducted an assessment of the potential for using biomass as a source of renewable energy in Cambodia. | + | The first biomass (mostly rice husk is used by rice mills and fire wood by ice plants and REE) were introduced in 2006 by [http://www.google.com/url?sa=t&rct=j&q=sme+renewable+cambodia&source=web&cd=1&ved=0CCgQFjAA&url=http://www.smerenewables.com/&ei=0t_eTrnqCeq0iQe5ht2kBQ&usg=AFQjCNFWY8HnPdCNMupvau0a3OXB9N63nA SME Renewable Energy]whi imported [http://www.google.com/url?sa=t&rct=j&q=ankur+gasifier&source=web&cd=1&ved=0CDwQFjAA&url=http://www.ankurscientific.com/&ei=79_eToaTFa2kiAeUg6GqBQ&usg=AFQjCNGQPhvBP9YFUlQQ0ZehucyLRZ5y6w Ankur] gasifiers from India. Soon, local companies started copying these gasifiers - with varying quality. Especially ice plants which run 24/7 can achieve huge savings with gasifiers, as do big rice mills due to the available fuel.Due to the huge amount of rice husk available - if all risk husk resources from mills were used in gasifiers to generate electricity, up to 30% of Cambodia's current electricity demand could be met (1.3 mio. metric tons of rice husk generating 650.000 MWh - 750 MW capacity). Additionally,Cambodia should also focus on improving quality and safety of gasifiers, as well as only using sustainable biomass/ bio waste, such as cut off from rubber or cashew plantations, to avoid contributing to deforestation. In many rice mills, only 25% of rice husk is needed to generated the power needed. Therefore, abundant husks could be sold on to other gasifier operators. The logistics in this and in harnessing the vast potential of rice husk through out the country where smaller (e.g. houshold) mills operate are further challenges to overcome.Rice mills do not operate throughout the year, therefore easier access to licenses to sell electricity and act as an REE or to feed into the grid would make this business more profitable for them and would make use of the installed capacity. |
| | | |
− | Biomass technologies for power generation and heating process should be studied and developed. Based on existing crop and livestock residues and if assumes 35% conversion efficiency, the preliminary assessment of biomass generation potential estimate at around 18.852 GWh/yr with 2 MW already exploited.
| + | Main challenges for implementing these gasifiers are lacking know how of the workforce/operators, careless handling of waste tar and waste water which is often dumped in nearby rivers or fields with great harmful impacts, low work safety and lacking quality, waste and environmental standards. |
| | | |
− | <br/>
| + | There is also great potential for '''other biomass waste applications '''such as sustainable charcoal bricketts, rice husk bricketts, gasification of corn colbs, etc. |
− | | + | |
− | '''Biomass gasification''' is currently beeing further looked into: on the one hand, more and more rice mills (rice husk), ice factories (wood) and garment factories (wood) are using gasifiers. . Also, rural electricity enterprises (REE) which supply rural villages with basic electricity services are increasingly evaluating biomass gasifiers due to increasing diesel prices. Currently roughly 150 biomass gasifiers have been installed throughout Cambodia, mostly using dual-fuel mode thus replacing up to 80% of diesel. In some cases, gas engines have been installed. Estimates see a market of up to 600 more medium sized gasifiers (100-300kW), and maybe 50 larger gasifiers (uo to 1MW).
| + | |
− | | + | |
− | <br/>
| + | |
− | | + | |
− | The first biomass (mostly rice husk is used by rice mills and fire wood by ice plants and REE) were introduced in 2006 by [http://www.google.com/url?sa=t&rct=j&q=sme+renewable+cambodia&source=web&cd=1&ved=0CCgQFjAA&url=http://www.smerenewables.com/&ei=0t_eTrnqCeq0iQe5ht2kBQ&usg=AFQjCNFWY8HnPdCNMupvau0a3OXB9N63nA SME Renewable Energy]whi imported [http://www.google.com/url?sa=t&rct=j&q=ankur+gasifier&source=web&cd=1&ved=0CDwQFjAA&url=http://www.ankurscientific.com/&ei=79_eToaTFa2kiAeUg6GqBQ&usg=AFQjCNGQPhvBP9YFUlQQ0ZehucyLRZ5y6w Ankur] gasifiers from India. Soon, local companies started copying these gasifiers - with varying quality. Especially ice plants which run 24/7 can achieve huge savings with gasifiers, as do big rice mills due to the available fuel. Main challenges to be overcome are the lacking know how of the workforce/operators, careless handling of wast tar and wast water which is often dumped in nearby rivers or fields with great harmful impacts, low work safety and lacking quality, waste and environmental standards. Due to the huge amount of rice husk available - if all risk husk recources from mills were used in gasifiers to generate electricity, up to 30% of Cambodia's current electricity demand could be met (1.3 mio. metric tons of rice husk generating 650.000 MWh - 750 MW capacity.)
| + | |
− | | + | |
− | <br/>
| + | |
− | | + | |
− | Yet, focus has to be put on improving quality and safety of gasifiers, as well as only using sustainable biomass/ bio waste, such as cut off from rubber or cashew plantations, to avoid contributing to deforestation. In many rice mills, only 25% of rice husk is needed to generated the power needed. Therefore, abundant husks could be sold on to other gasifier operators. The logistics in this and in harnessing the vast potential of rice husk through out the country where smaller (e.g. houshold) mills operate are further challenges to overcome.
| + | |
− | | + | |
− | Rice mills do not operate throughout the year, therefore easier access to licenses to sell electricity and act as an REE or to feed into the grid would make this business more profitable for them and would make use of the installed capacity.
| + | |
− | | + | |
− | There is great potential for '''other biomass waste applications '''such as sustainable charcoal bricketts, rice husk bricketts, gasification of corn colbs, etc. | + | |
| | | |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
| | | |
− | <br/>
| + | == Biogas == |
− | | + | For biogas implementation on household level see [[Biogas Technology in Cambodia|National Biodigester Programme]], Industrial and community application not very common. Single pig farms use biodigesters. Potential for upscaling.<br/> |
− | | + | |
− | === Biogas ===
| + | |
− | Household level see [[Biogas Technology in Cambodia|National Biodigester Programme]], Industrial and community application not very common. Single pig farms use biodigesters. Potential for upscaling.<br/>
| + | |
− | | + | |
− | <br/>
| + | |
− | | + | |
− | <br/>
| + | |
− | | + | |
| | | |
− | === Biofuel ===
| + | == Biofuel == |
| Jatropha – 200 ha (Fencing), around 10 companies - 1.000ha, Palm Oil – 4,000 ha (recently) (potential up to 10, 000 ha) and sugar cane 20,000 ha.<br/>One Korean company is producing ethanol from cassava: production capacity of ethanol 36,000 t/year from 100,000 tons of cassava. | | Jatropha – 200 ha (Fencing), around 10 companies - 1.000ha, Palm Oil – 4,000 ha (recently) (potential up to 10, 000 ha) and sugar cane 20,000 ha.<br/>One Korean company is producing ethanol from cassava: production capacity of ethanol 36,000 t/year from 100,000 tons of cassava. |
| | | |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
| | | |
− | <br/>
| + | == Solar<br/> == |
− | | + | Based on insulation of 5.10 kWh/sq.m on 0.02% of Cambodia's land area, the preliminary solar power generation potential estimate is about 7,665 GWh/yr and solar hot water potential is estimated at 17,995 GWh/yr. |
− | | + | |
− | === Solar<br/> ===
| + | |
− | Based on insulation of 5.10 kWh/sq.m and 0.02% of Cambodia's land area, the preliminary solar power generation potential estimate is about 7,665 GWh/yr and solar hot water potential estimate at 17,995 GWh/yr. | + | |
| | | |
| In Cambodia, the use of solar photovoltaic technology has started since 1997 for lighting, radio, TV and telecommunication in the rural areas. The total installation is about 1,150 kWp and primarily has been installed on telecommunication repeater station in remote areas. Most of the solar systems resulted from donor projects supported by SIDA, NEDO and other donors. All the equipment is imported from other countries. | | In Cambodia, the use of solar photovoltaic technology has started since 1997 for lighting, radio, TV and telecommunication in the rural areas. The total installation is about 1,150 kWp and primarily has been installed on telecommunication repeater station in remote areas. Most of the solar systems resulted from donor projects supported by SIDA, NEDO and other donors. All the equipment is imported from other countries. |
| | | |
− | A World Bank programme carried out via the REF and Sunlabob/Kamworks is to install 12,000 solar home systems (SHS) throughout seven of Cambodia’s provinces from Mid 2011 till January 2012. The project is implemented by Lao-based company Sunlabob. Sunlabob is also said to be in talks with the government to continue developing solar energy beyond household units, possibly expanding to the construction of centralised systems in remote areas that households could connect to. It allegedly is also looking at a larger-scale solar plant that would allow Sunlabob to sell energy to the state power company Electricite du Cambodge.<ref name="http://www.phnompenhpost.com/index.php/2012011853987/Business/largest-ever-cambodian-solar-project-launched.html">http://www.phnompenhpost.com/index.php/2012011853987/Business/largest-ever-cambodian-solar-project-launched.html</ref><br/>The main obstacles to the advancement of the industry in Cambodia are accessibility, awareness and affordability.<ref name="http://www.phnompenhpost.com/index.php/2011071550395/Business/cambodias-energy-dilemma.html">http://www.phnompenhpost.com/index.php/2011071550395/Business/cambodias-energy-dilemma.html</ref> | + | A World Bank programme carried out via the REF and Sunlabob/Kamworks is to install 12,000 solar home systems (SHS) throughout seven of Cambodia’s provinces from Mid 2011 till January 2012. The project is implemented by Lao-based company Sunlabob. Sunlabob is also said to be in talks with the government to continue developing solar energy beyond household units, possibly expanding to the construction of centralised systems in remote areas that households could connect to. It allegedly is also looking at a larger-scale solar plant that would allow Sunlabob to sell energy to the state power company, Electricite du Cambodge.<ref name="http://www.phnompenhpost.com/index.php/2012011853987/Business/largest-ever-cambodian-solar-project-launched.html">http://www.phnompenhpost.com/index.php/2012011853987/Business/largest-ever-cambodian-solar-project-launched.html</ref><br/>The main obstacles for solar industry are accessibility, awareness and affordability.<ref name="http://www.phnompenhpost.com/index.php/2011071550395/Business/cambodias-energy-dilemma.html">http://www.phnompenhpost.com/index.php/2011071550395/Business/cambodias-energy-dilemma.html</ref> |
| | | |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
| | | |
− | <br/>
| + | == Wind<br/> == |
− | | + | The potential of wind energy is small in account of average wind speed of 3m/s and less. The estimated wind generation potential is 3,666 GWh/yr. However, the southern coastal area (Sihanouk Ville, Kampot, Kep, Koh Kong) and mountainous areas in the southwest and northeast of the country, as well as on the southern part of the reat lake Tonle Sap, have favorable wind condition for wind power generation because of average wind speed of around 5m/s. (5% of country surface). Still, wind energy is subject to great seasonal variations. |
− | | + | |
− | === Wind<br/> ===
| + | |
− | The potential of wind energy in Cambodia is small in account of average wind speed of 3m/s and less. The estimated wind generation potential is 3,666 GWh/yr. However, the southern coastal area (Sihanouk Ville, Kampot, Kep, Koh Kong) and mountainous areas in the southwest and northeast of the country, as well as on the southern part of the reat lake Tonle Sap, have favorable wind condition for wind power generation because of average wind speed is around 5m/s. (5% of country surface). Still, wind energy is subject to great seasonal variations. | + | |
| | | |
| Wind energy has been utilized for water pumping in central part of Cambodia (Prey Veng province) which is supported by the NGO with installed capacity of 700 kW. | | Wind energy has been utilized for water pumping in central part of Cambodia (Prey Veng province) which is supported by the NGO with installed capacity of 700 kW. |
Line 237: |
Line 163: |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
| | | |
− | <br/>
| + | == Hydro == |
− | | + | In theory, the hydro potential is said to be 10.000 MW, but current contribution is far less (20 MW, with many more under construction). |
− | | + | |
− | === Hydro ===
| + | |
− | In theory, the hydro potential in Cambodia is said to be 10.000 MW, but current contribution is far less (20 MW, with many more under construction). | + | |
| | | |
| In 2010, hydro contributed 3% to Cambodia's total electricity supply. | | In 2010, hydro contributed 3% to Cambodia's total electricity supply. |
Line 247: |
Line 170: |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
| | | |
− | <br/> | + | === Large-scale Hydro power === |
| + | The potential for large hydro has only been explored. 29 locations with a potential greater than 10 MW have been identified and are at different stages of development. A huge issue is the mitigation of social and environmental impacts of large dams, especially on the Mekong and its tributaries (e.g. fisheries, resettlement, land issues, changes in flood patterns, less sediments, GHG emissions from reservoirs in (sub-)tropical countries, etc.). Lacking transparency, great involvement of foreign investment, lacking environmental and social impact assessment and community consultations make large scale hydro highly controversial.Critics say that these plants infringe on indigenous customs of tribal people (e.g. Koh Kong plant, Se San 2). <ref name="http://www.rfa.org/english/news/cambodia/dam-04062012184436.html">http://www.rfa.org/english/news/cambodia/dam-04062012184436.html</ref> Grass-root level community protests, such as the one against the planned Hydro Dam Lower Se San 2 are becoming more common and heard.<ref name="http://www.rfa.org/english/news/cambodia/dam-02282012135535.html">http://www.rfa.org/english/news/cambodia/dam-02282012135535.html</ref> |
| | | |
− | | + | Besides the already existing large scale hydro power generation plant, a serious of new plants is being planned. Especially Vietnamese (EVNI) and Chinese companies are investing in Cambodia in the large-scale hydro field: |
− | ==== Large-scale Hydro power ====
| + | |
− | The potential for large hydro is only at the beginning of being fully harvested. 29 locations with a potential greater than 10 MW have been identified and are at different stages of development. A huge issue is the mitigation of social and environmental impacts of large dams, especially on the Mekong and its tributaries (e.g. fisheries, resettlements, land issues, changes in flood patterns, less sediments, GHG emissions from reservoirs in (sub-)tropical countries, etc.). Lacking transperancy, great involvement of foreign investment, lacking environmental and social impact assessement and community consultations make large scale hydro highly controversial.Critis say that these plants infringe on indigeneous customs of tribal people (e.g. Koh Kong plant, Se San 2). <ref name="http://www.rfa.org/english/news/cambodia/dam-04062012184436.html">http://www.rfa.org/english/news/cambodia/dam-04062012184436.html</ref> Grass-root level community protests, such as the one against the planned Hydro Dam Lower Se San 2 are becoming more common and heard.<ref name="http://www.rfa.org/english/news/cambodia/dam-02282012135535.html">http://www.rfa.org/english/news/cambodia/dam-02282012135535.html</ref>
| + | |
− | | + | |
− | <br/>
| + | |
− | | + | |
− | Besides the already existing large scale hydro power generation plant, a serious of new plants is planned. Especially Vietnamese (EVNI) and Chinese companies are investing in Cambodia in the large-scale hydro field: | + | |
| | | |
| '''Five hydroelectric dams with a total capacity of 915 MW are currently (2011) under construction by Chinese investors with the total investments of 1.6 billion U.S. dollars<ref name="http://english.peopledaily.com.cn/90001/90776/90883/7431947.html">http://english.peopledaily.com.cn/90001/90776/90883/7431947.html</ref>:''' | | '''Five hydroelectric dams with a total capacity of 915 MW are currently (2011) under construction by Chinese investors with the total investments of 1.6 billion U.S. dollars<ref name="http://english.peopledaily.com.cn/90001/90776/90883/7431947.html">http://english.peopledaily.com.cn/90001/90776/90883/7431947.html</ref>:''' |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| {| cellspacing="2" border="0" style="width: 100%;" | | {| cellspacing="2" border="0" style="width: 100%;" |
Line 309: |
Line 224: |
| | | |
| '''Planned projects where MoUs for studies have been signed:''' | | '''Planned projects where MoUs for studies have been signed:''' |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| {| cellspacing="2" border="0" style="width: 100%;" | | {| cellspacing="2" border="0" style="width: 100%;" |
Line 378: |
Line 290: |
| | | |
| '''Permitted projects:''' | | '''Permitted projects:''' |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| {| cellspacing="2" border="0" style="width: 100%;" | | {| cellspacing="2" border="0" style="width: 100%;" |
Line 414: |
Line 323: |
| | style="background-color: rgb(219, 229, 241);" | Korea | | | style="background-color: rgb(219, 229, 241);" | Korea |
| |} | | |} |
| + | |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
| | | |
− | <br/>
| + | === Mini/Micro/Pico Hydro power === |
− | | + | Cambodia has an enormous water resource for hydropower development and in some parts of the country, mini/micro/pico hydropower may provide opportunities for rural electrification. The assessment of theoretical potential of mini, micro, pico hydropower is about 300 MW with present installed capacity of 1.87 MW. At present, there is one mini hydropower plant with 1 MW installed capacity and 2 micro hydropower plants with total installed capacity of 370 kW which are in operation under the responsibility of Provincial Electricity Unit of Electricite Du Cambodge (EDC). There are also privatly owned micro and pico hydropower plants with the installed capacity ranged from 1 kW to 30 kW in the northern provinces and the units are imported from Vietnam or China. |
− | | + | |
− | ==== Mini/Micro/Pico Hydro power ====
| + | |
− | Cambodia has an enormous water resource for hydropower development and in some parts of the country, mini/micro/pico hydropower may provide opportunities for rural electrification. The assessment of theoretical potential of mini, micro, pico hydropower is about 300 MW with present installed capacity of 1.87 MW. At present, there is one mini hydropower plant with 1 MW installed capacity and 2 micro hydropower plants with total installed capacity of 370 kW which are in operation under the responsibility of Provincial Electricity Unit of Electricite Du Cambodge (EDC). There are also private owned micro and pico hydropower plants with the installed capacity ranged from 1 kW to 30 kW in the northern provinces and the units are imported from Vietnam or China. | + | |
| | | |
− | Often, however, likely users live far away from the economically viable production sites which are mostly located in mountain areas. The costs for distribution networks hence make small hydro power in many cases unaffordable. | + | Often, these hydropower stations are located in mountainous areas and the cost for establishing distribution networks is very high, making small -hydropower in many cases unaffordable. |
| | | |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| == Other RE sources == | | == Other RE sources == |
− | Geothermal: no assessments available, some thermal springs, but appear low-grade. Tidal: no assessments available, low apparent potential. | + | Geothermal: no assessments available, some thermal springs, but appear low-grade. <br/>Tidal: no assessments available, low apparent potential. |
| | | |
− | At present the RE development is still at the beginning stage and need more support from the Royal Government to overcome serious barriers to promote RE development and to facilitate private sector participation. | + | At present the RE development is still at the beginning stage and needs more support from the Royal Government to overcome serious barriers to promote RE development and to facilitate private sector participation. |
| | | |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| = Electricity Situation <ref name="http://agmhp.aseanenergy.org/focus-countries/2009/10/30/current-status-of-electricity-sector-of-kingdom-of-cambodia">http://agmhp.aseanenergy.org/focus-countries/2009/10/30/current-status-of-electricity-sector-of-kingdom-of-cambodia</ref><br/> = | | = Electricity Situation <ref name="http://agmhp.aseanenergy.org/focus-countries/2009/10/30/current-status-of-electricity-sector-of-kingdom-of-cambodia">http://agmhp.aseanenergy.org/focus-countries/2009/10/30/current-status-of-electricity-sector-of-kingdom-of-cambodia</ref><br/> = |
− | During the 1970s, the electricity sector in the Kingdom of Cambodia was seriously damaged due to the civil war from 1970 to 1979. During that time, there was only one transmission line in the Kingdom of Cambodia connecting the Kiriom I Hydropower Station to Phnom Penh capital town with a voltage rating of 115 kV and length of 120 km which ceased to operate since 1973 when most electricity related facilities including generation, transmission and distribution facilities were nearly destroyed. | + | During the 1970s, the electricity sector was seriously damaged by the civil war from 1970 to 1979. During this time, there was only one transmission line in Cambodia connecting the Kiriom I Hydropower Station to Phnom Penh capital town with a voltage rating of 115 kV and length of 120 km which ceased to operate since 1973 when most electricity related facilities including generation, transmission and distribution facilities were nearly destroyed. |
| | | |
− | Due to the effort of Cambodian government, the electricity sector was rehabilitated since 1995, however till present there is no national electricity network yet and all electricity supply is based on 24 small isolated electricity systems.
| + | Since 1995, the Cambodian government is making efforts to reestablish the electricity sector. However till today, there is no national electricity network and electricity is supplied via the 24 small isolated electricity systems. |
| | | |
− | EdC, the government-owned utility, serves Phnom Penh, Sihanoukville, Siem Reap, Kampong Cham, Takeo and Battambang, accounting for nearly 90 percent of total electricity consumption. EdC serves approximately 10 percent of the population with most of its customers located in Phnom Penh. There is no national grid and towns are supplied through isolated systems. Nearly half of EdC’s installed power supply capacity of 140MW is purchased from 2 IPPs (63 MW). Despite the creation of substantial IPP generation capacity and EdC’s commendable efforts to reduce system losses from nearly 25 percent to 13 percent, the quality and reliability of supply in Phnom Penh continues to be poor.<ref name="http://www.worldbank.org/en/country/cambodia/overview">http://www.worldbank.org/en/country/cambodia/overview</ref> | + | EdC, the government-owned utility, serves Phnom Penh, Sihanoukville, Siem Reap, Kampong Cham, Takeo and Battambang, accounting for nearly 90 percent of total electricity consumption. EdC serves approximately 10 percent of the population with most of its customers located in Phnom Penh.Nearly half of EdC’s installed power supply capacity of 140MW is purchased from 2 IPPs (63 MW). Despite the creation of substantial IPP generation capacity and EdC’s commendable efforts to reduce system losses from nearly 25 percent to 13 percent, the quality and reliability of electricity supply in Phnom Penh continues to be poor.<ref name="http://www.worldbank.org/en/country/cambodia/overview">http://www.worldbank.org/en/country/cambodia/overview</ref> |
| | | |
− | Electricity demand in Cambodia is growing rapidly with annual growth rate of 21.5% for electricity supply and 22.3% for electricity demand in the average of 5 years from 2003 to 2008. In terms of electric energy production in 2008 was 1,681 GWh with only 695 GWh in 2003 and for electricity demand, it was 314 MW and 134 MW respectively. In particular, the highest record of growth rate is being updated year by year and reached 26.7% and 27.5% for electricity supply and electricity demand respectively in 2007.
| + | From 2003 to 2008, the electricity demand rose on an average 22.3% while the electricity supply rose only 21.5%. The electricity production rose from 695 GWh in 2003 to 1,681 GWh in 2008. However, the electricity demand rose from 134 MW in 2003 to 314 MW in 2008. In particular, the highest record of growth rate is being updated year by year and reached 26.7% and 27.5% for electricity supply and electricity demand respectively in 2007. In 2010 the annual electric energy consumption per capita was 160 kWh. |
| | | |
− | <br/>
| + | The electricity mix consist of 34% imported electricity (28% Vietnam, 13.6% Thailand, 0.4% Lao), 54% heavy fuel oil, 3% hydropower, 2% coal and others. At the moment Cambodia is eager in increasing electricity generation capacities (hydro and coal plants) to decrease import dependencies. 93% of electricity generated by licensed operators is based on expensive, imported diesel fuel. |
| | | |
− | In 2010 the annual electric energy consumption per capita was 160 kWh. | + | In 2008, only 25% of households have access to electricity (rural electrification rate of around 15%). The Phnom Penh capital zone, in particular, shares 80% or more of national total electricity consumption: in 2010 300 MW annual consumption load (of 538 MW nation wide). Yet, power shortages are common and increasing as power supply cannot keep track with demand.<ref name="http://www.opendevelopmentcambodia.net/power/electricity/in-need-of-power-phnom-penh-blacks-out/">http://www.opendevelopmentcambodia.net/power/electricity/in-need-of-power-phnom-penh-blacks-out/</ref> |
− | | + | |
− | The electricity mix consist of 34% imported electricity (28% Vietnam, 13.6% Thailand, 0.4% Lao), 54% heavy fuel oil, 3% hydropower, 2% coal and others. At the moment Cambodia is eager in increasing electricity generation capacities (hydro and coal plants) to decrease import dependencies.
| + | |
− | | + | |
− | 93% of electricity generated by licenced operators is based on expensive, imported diesel fuel.
| + | |
− | | + | |
− | in 2008, only 25% of households have access to electricity (rural lectrification rate of around 15%). The Phnom Penh capital zone, in particular, shares 80% or more of national total electricity consumption: in 2010 300 MW annual consumption load (of 538 MW nation wide). Yet, power shortages are common and increasing as power supply cannot keep track with demand.<ref name="http://www.opendevelopmentcambodia.net/power/electricity/in-need-of-power-phnom-penh-blacks-out/">http://www.opendevelopmentcambodia.net/power/electricity/in-need-of-power-phnom-penh-blacks-out/</ref>
| + | |
| | | |
| Several private companies are active in the electricity sector in Cambodia, running or investing in power porjects (mostly hydro or coal) or advising the Government on its electrification strategy.<ref name="http://www.awrlloyd.com/news-and-publications/view/awr-lloyd-contributing-to-cambodia-energy-master-plan/">http://www.awrlloyd.com/news-and-publications/view/awr-lloyd-contributing-to-cambodia-energy-master-plan/</ref> | | Several private companies are active in the electricity sector in Cambodia, running or investing in power porjects (mostly hydro or coal) or advising the Government on its electrification strategy.<ref name="http://www.awrlloyd.com/news-and-publications/view/awr-lloyd-contributing-to-cambodia-energy-master-plan/">http://www.awrlloyd.com/news-and-publications/view/awr-lloyd-contributing-to-cambodia-energy-master-plan/</ref> |
| | | |
− | <br/>
| + | The figure below shows the generation as well as supply of electricity in Cambodia (2011). <ref>http://aseanrenewables.info/wp-content/uploads/2013/05/KH-Combodia_Rev02.pdf</ref>[[File:Cambodia.PNG|border|left|500px|Electricity Generation Capacity|alt=300]]<br clear=all>[[Cambodia Energy Situation#toc|►Go to Top]] |
− | | + | |
− | The figure below shows the generation as well as supply of electricity in Cambodia (2011). [[File:Cambodia.PNG|border|left|500px|Electricity Generation Capacity|alt=300]]<br/>[[Cambodia Energy Situation#toc|►Go to Top]] | + | |
− | | + | |
− | <br/>
| + | |
− | | + | |
| | | |
| == Electricity Prices == | | == Electricity Prices == |
− | As a great share of the electricity is imported and as imported fossil fuels are used to produce more than half of locally produced electricity, Cambodian electricity prices are amongst the highest in the region. With the development of large hydro potentials and more coal fired plants, these tariffs might decline in the future. Yet,the national power grid is still being constructed, so tariffs will also have to fund the extension of the distribution network. In summer 2011, electricity prices were: | + | As a great share of the electricity is imported and are used to produce more than half of locally produced electricity, Cambodian electricity prices are among the highest in the region. With the development of large hydro potentials and more coal fired plants, these tariffs might decline in the future. Yet,the national power grid is still being constructed, so tariffs will also have to fund the extension of the distribution network. In summer 2011, electricity prices were: |
− | | + | |
− | <br/>
| + | |
− | | + | |
| | | |
| *Phnom Penh: 0.18 USD/kWh for households, 0.19 USD/kWh for businesses | | *Phnom Penh: 0.18 USD/kWh for households, 0.19 USD/kWh for businesses |
Line 480: |
Line 367: |
| | | |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| == Electricity Demand Forecasts == | | == Electricity Demand Forecasts == |
− | According to the available electricity demand forecast in Cambodia prepared by the Ministry of Industry, Mines and Energy in 2007 based on the demand forecast by World Bank and KEPCO in 2006, the electricity demand projection in Cambodia in 2024 is 3,045.33 MW and 16,244.61 GWh for capacity and electric energy respectively. | + | According to the available electricity demand forecast in Cambodia prepared by the Ministry of Industry, Mines and Energy in 2007 and on the demand forecast by World Bank and KEPCO in 2006, the electricity demand projection in Cambodia in 2024 is 3,045.33 MW and 16,244.61 GWh for capacity and electric energy respectively. |
| | | |
− | Cambodia Power Report 2011 <ref name="http://news.wooeb.com/779997/cambodia-power-report-q3-2011-new-market-research-report">http://news.wooeb.com/779997/cambodia-power-report-q3-2011-new-market-research-report</ref> | + | According to Cambodia Power Report 2011 <ref name="http://news.wooeb.com/779997/cambodia-power-report-q3-2011-new-market-research-report">http://news.wooeb.com/779997/cambodia-power-report-q3-2011-new-market-research-report</ref>, Cambodia's power consumption is forcast to rise from 1.4TWh in 2010 to 3.4TWh by the end of 2020, representing average annual growth of 9.4% in 2011-2020. |
− | | + | |
− | Cambodia's power consumption is forcast to rise from 1.4TWh in 2010 to 3.4TWh by the end of 2020, representing average annual growth of 9.4% in 2011-2020. | + | |
| | | |
| Cambodian power generation in 2010 is put at 1.3TWh, having risen around 5.0% from the 2009 level. An average 8.9% annual increase to 2.0TWh between 2011 and 2015 is expected. Thermal generation, comprising coal, gas and oil, is expected to increase by an average 8.9% per annum during the period to 2015, but growth looks set to accelerate later in the decade. | | Cambodian power generation in 2010 is put at 1.3TWh, having risen around 5.0% from the 2009 level. An average 8.9% annual increase to 2.0TWh between 2011 and 2015 is expected. Thermal generation, comprising coal, gas and oil, is expected to increase by an average 8.9% per annum during the period to 2015, but growth looks set to accelerate later in the decade. |
Line 496: |
Line 378: |
| | | |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| == Electricity Grid Development == | | == Electricity Grid Development == |
− | So far, no national connected grid exists. Cambodia has ambitious plans regarding its grid developent plan. Until 2027 roughly 2,100 km electricity grid (230kV and 115kV transfer lines) are to be constructed with interconnections between existing grid systems such as Phnom Penh and surroundings, connections to planned power plants as well as cross-border lines to Lao. | + | So far, no national grid exists. Cambodia has ambitious plans regarding its grid development plan. Until 2027 roughly 2,100 km electricity grid (230kV and 115kV transfer lines) are to be constructed with interconnections between existing grid systems such as Phnom Penh and surroundings, connections to planned power plants as well as cross-border lines to Lao. |
| | | |
| Grid extension works are funded by China<ref name="http://www.chinadaily.com.cn/bizchina/2012-04/06/content_14992134.htm">http://www.chinadaily.com.cn/bizchina/2012-04/06/content_14992134.htm</ref> , KfW and others. | | Grid extension works are funded by China<ref name="http://www.chinadaily.com.cn/bizchina/2012-04/06/content_14992134.htm">http://www.chinadaily.com.cn/bizchina/2012-04/06/content_14992134.htm</ref> , KfW and others. |
| | | |
− | '''►Go to Top'''
| + | [[Cambodia Energy Situation#toc|►Go to Top]] |
− | | + | |
− | <br/>
| + | |
− | | + | |
| | | |
| = Policy Framework, Laws and Regulations<br/> = | | = Policy Framework, Laws and Regulations<br/> = |
| | | |
| == Electricity Sector Development Policy<ref name="http://agmhp.aseanenergy.org/focus-countries/2009/10/30/current-status-of-electricity-sector-of-kingdom-of-cambodia">http://agmhp.aseanenergy.org/focus-countries/2009/10/30/current-status-of-electricity-sector-of-kingdom-of-cambodia</ref> == | | == Electricity Sector Development Policy<ref name="http://agmhp.aseanenergy.org/focus-countries/2009/10/30/current-status-of-electricity-sector-of-kingdom-of-cambodia">http://agmhp.aseanenergy.org/focus-countries/2009/10/30/current-status-of-electricity-sector-of-kingdom-of-cambodia</ref> == |
− | Cambodia faces a major challenge to develop an adequate and reliable source of electricity in the years ahead. Based on intensive studies of the best means of providing a national electricity supply network, the Royal Government of Cambodia (RGC) formulated an electricity sector development policy in October 1994, which aimed at: | + | Cambodia faces a major challenge to develop an adequate and reliable source of electricity in the years ahead. Based on intensive studies of the best means for providing a national electricity supply network, the Royal Government of Cambodia (RGC) formulated an electricity sector development policy in October 1994, which aimed at: |
| | | |
− | <br/>
| + | *Providing an adequate supply of electricity throughout Cambodia at reasonable and affordable price. |
| + | *Ensuring a reliable, secure electricity supply at prices, which facilitate investment in Cambodia and development of the national economy |
| + | *Encouraging exploration and environmentally and socially acceptable development of energy resources needed for supplying to all sectors of the Cambodian economy, and |
| + | *Encouraging an efficient use of electric energy and minimizing detrimental environmental effects resulting from electricity supply and use. |
| | | |
| + | In order to meet the growing demand for electricity over the next 20 years, the RGC is formulating an electricity sector strategy which consists of: |
| | | |
− | #Providing an adequate supply of electricity throughout Cambodia at reasonable and affordable price.<br/>
| + | *Development of generation and transmission |
− | #Ensuring a reliable, secure electricity supply at prices, which facilitate investment in Cambodia and development of the national economy
| + | *Power trade with neighboring countries, and |
− | #Encouraging exploration and environmentally and socially acceptable development of energy resources needed for supplying to all sectors of the Cambodian economy, and
| + | *Provincial and Rural Electrification |
− | #Encouraging an efficient use of electric energy and minimizing detrimental environmental effects resulting from electricity supply and use.
| + | |
− | <br/>In order to meet the growing demand for electricity over the next 20 years, the RGC is formulating an electricity sector strategy which consists of:
| + | |
− | | + | |
| <br/> | | <br/> |
− |
| |
− |
| |
− | #Development of generation
| |
− | #Development of Transmission
| |
− | #Power trade with neighboring countries, and
| |
− | #Provincial and Rural Electrification
| |
− | <br/>
| |
− |
| |
− | The need for Cambodia will be to find the energy sources in order to meet future electricity demand and reduce its dependence upon imported fuel oil, to strengthen its energy security and to exchange of electricity with neighboring countries.
| |
| | | |
| It was reported that the major natural resources for power generation available in Cambodia is hydropower with potential of 10,000 MW or more, however, the hydropower capacity already developed in Cambodia is very limited to be only around 13 MW and 10,000 MW is large enough compared with the next 15 years domestic electricity demand of around 3,045.33 MW in 2024. | | It was reported that the major natural resources for power generation available in Cambodia is hydropower with potential of 10,000 MW or more, however, the hydropower capacity already developed in Cambodia is very limited to be only around 13 MW and 10,000 MW is large enough compared with the next 15 years domestic electricity demand of around 3,045.33 MW in 2024. |
| | | |
− | In summary, it is the strategic plan for the electricity sector of Cambodia to procure the required electric energy by the electricity import from neighboring countries for the coming several years and, after that, to utilize hydropower, which is the major source of domestic renewable energy, as much as possible in parallel with development of coal thermal plants step by step. | + | In summary, the strategic plan of Cambodia is to procure the required electric energy by importing electricity from neighboring countries for the coming years and, after that, to utilize hydropower, which is the major source of domestic renewable energy, as much as possible in parallel with development of coal thermal plants step by step. |
| | | |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| == Rural Electrification Plan<ref name="http://agmhp.aseanenergy.org/focus-countries/2009/09/30/rural-electrification-plan-in-kingdom-of-cambodia">http://agmhp.aseanenergy.org/focus-countries/2009/09/30/rural-electrification-plan-in-kingdom-of-cambodia</ref> == | | == Rural Electrification Plan<ref name="http://agmhp.aseanenergy.org/focus-countries/2009/09/30/rural-electrification-plan-in-kingdom-of-cambodia">http://agmhp.aseanenergy.org/focus-countries/2009/09/30/rural-electrification-plan-in-kingdom-of-cambodia</ref> == |
− | Eighty five (85) percent of the population of Cambodia is living in rural areas and most of them cannot access the electricity. The provision of rural energy is a key factor in the rehabilitation and development of Cambodia. Electricity is very important for the improvement of living standards and an important infrastructure requirement for agricultural and small scale industrial development in the rural areas.
| + | The Rural Electrification Strategy (RES) of the Royal Government of Cambodia (RGC) aims to substantially scale up access to electricity services for rural area, where about 85% of the Cambodian population lives and only 15% of them have access to electricity services and to improve the standard of living, reduce poverty and foster economic development. By 2020, the objective is for all villages (100%) to have access to electricity in different forms; by the year 2030 - 70% of all rural households should be electrified. The remaining rural households (30%) shall be targeted by a "Renewable Energy Development Program" which will provide quality renewable energy services in remote regions by using mostly solar applications (solar lanterns, SHS). The main components of the Rural Electrification Strategy are as follows: |
− | | + | *Grid expansion from the existing grids<br/> |
− | The Royal Government of Cambodia has formulated a rural electrification strategy to provide the best electricity supply option for rural areas. By 2020, the objective is for all villages (100%) to have access to electricity in different forms; by the year 2030 - 70% of all rural households should be electrified. The remaining rural households (30%) shall be targeted by a "Renewable Energy Development Program" which will provide quality renewable energy services in remote regions by using mostly solar applications (solar lanterns, SHS). The main components of the Rural Electrification Strategy are as follows:
| + | *Upscaling of power generation (hydro, oil, coal) and cross border power supply from neighbouring countries (Thailand, Viet Nam and Lao PDR) and |
− | | + | *Mini grids (diesel, biomass (especially gasification), micro hydro) |
− | <br/>
| + | *Battery lighting (solar, locally wind). |
− | | + | |
− | | + | |
− | #Grid expansion from the existing grids<br/>Upscaling of power generation (hydro, oil, coal) and cross border power supply from neighbouring countries (Thailand, Viet Nam and Lao PDR) and
| + | |
− | #Mini grids (diesel, biomass (espec. gasification), micro hydro)
| + | |
− | #Battery lighting (solar, locally wind).
| + | |
− | <br/>
| + | |
− | | + | |
− | Renewable Energy (solar, wind, mini/micro hydro power, biomass, biogas, etc.) - renewable energy target of 15% of electricity generation by 2015 (excluding large gydro)<br/>
| + | |
− | | + | |
− | In particular for remote rural areas located near streams with year around flow, micro hydropower development is contemplated. Micro hydropower stations, which generate about 300 W to 1 kW are quite common and require little capital. They will be ideal for small rural communities. If a micro hydropower potential exists in the vicinity of a village, it should be exploited for providing electricity supply. As micro hydropower scheme is site specific, it is not possible to include them in a generalized rural electricity supply strategy, except, to mention that where possible they should be investigated as a source of rural electricity supply in the first instance.
| + | |
− | | + | |
− | <br/>
| + | |
− | | + | |
− | On the other hand, in order to facilitate access to electricity supply at reasonable and affordable price in rural areas, the Government of Cambodia has established "Rural Electrification Fund" (see below) for enabling the development of electricity supply facilities in such areas. The objective of the fund includes to promote and encourage the private sector to participate in providing the sustainable rural electrification services.
| + | |
− | | + | |
− | <br/>
| + | |
| | | |
− | According to the "Master Plan Study Rural Electrification by Renewable Energy in the Kingdom of Cambodia (June 2006, JICA), the maximum use of renewable energy including micro hydropower was proposed to secure sustainability for source of electricity. This study recommended the off-grid electrification with micro hydropower scheme for such mountainous or hilly areas where hydropower potential is bigger than village size demand and village exists within an economic distance for transmission from the potential site as the most promising electricity source for such areas. The 145 number of micro to mini hydro power potential sites in the capacity range from 1 kW to 2,585 kW were identified in this Master Plan Study. | + | Renewable Energy (solar, wind, mini/micro hydro power, biomass, biogas, etc.) - renewable energy target of 15% of electricity generation by 2015 (excluding large hydro)<br/> |
| + | According to the "Master Plan Study Rural Electrification by Renewable Energy in the Kingdom of Cambodia (June 2006, JICA), the maximum use of renewable energy including micro hydropower was proposed to secure sustainability for source of electricity. This study recommended the off-grid electrification with micro hydropower scheme for such mountainous or hilly areas where hydropower potential is bigger than village size demand and village exists within an economic distance for transmission from the potential site as the most promising electricity source for such areas. The 145 number of micro to mini hydro power potential sites in the capacity range from 1 kW to 2,585 kW were identified in this Master Plan Study. Micro hydropower stations, which generate about 300 W to 1 kW are quite common and require little capital. They will be ideal for small rural communities. |
| + | In order to facilitate access to electricity supply at reasonable and affordable price in rural areas, the Government of Cambodia has established "Rural Electrification Fund" (see below) for enabling the development of electricity supply facilities in such areas. The objective of the fund is to promote and encourage the private sector to participate in providing the sustainable rural electrification services. |
| | | |
| Also, the objective of Rural Electrification Fund for the next five years term includes the provision of grant for development of 850 kW of micro hydropower and 6,000 kW of mini hydropower plants as well as 12,000 solar home systems. | | Also, the objective of Rural Electrification Fund for the next five years term includes the provision of grant for development of 850 kW of micro hydropower and 6,000 kW of mini hydropower plants as well as 12,000 solar home systems. |
| | | |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| == Wood and Biomass Energy Strategy == | | == Wood and Biomass Energy Strategy == |
− | In early 2012, in a haste, a wood and biomass energy strategy was comissioned by MIME. Even though biomass remains a very important energy source for the Cambodian people, it has widely been ignored. The strategy is a combination of different projects: efficient charcoal production, efficient fuel wood/biomass use in industries (brick kilns, garment factories, ice plants), up-scaling of the improved cook stove project to rural areas, analysing wood flows, managing forest resssources sustainably, using agricutlrural wast (rice husk), etc. Funding is outstanding. Coordination between MIME and the Forestry Administration is lacking. A interministerial working group has been suspended. The supply and demand side do not coordinate their actions. | + | In early 2012, in a haste, a wood and biomass energy strategy was commissioned by MIME. Even though biomass remains a very important energy source for the Cambodian people, it has widely been ignored. The strategy is a combination of different projects: efficient charcoal production, efficient fuel wood/biomass use in industries (brick kilns, garment factories, ice plants), up-scaling of the improved cook stove project to rural areas, analysing wood flows, managing forest resources sustainably, using agricultural waste (rice husk), etc. Funding is outstanding. Coordination between MIME and the Forestry Administration is lacking. A inter-ministerial working group has been suspended. The supply and demand side do not coordinate their actions. |
| | | |
| [[Cambodia Energy Situation#toc|►Go to Top]] | | [[Cambodia Energy Situation#toc|►Go to Top]] |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| == Rural Energy Strategy Program == | | == Rural Energy Strategy Program == |
| Recently, an effort has been started to come up with an entire energy sector strategy. This approach is new to the energy topic in Cambodia but leaves room for hope for the future development of the energy situation, especially for rural areas. Aspects from the Masterplan are also used for this programme. | | Recently, an effort has been started to come up with an entire energy sector strategy. This approach is new to the energy topic in Cambodia but leaves room for hope for the future development of the energy situation, especially for rural areas. Aspects from the Masterplan are also used for this programme. |
− |
| |
− | <br/>
| |
| | | |
| Under the Worldbank's Rural Electrification and Transmission Project (RETP) the Rural Energy Strategy Program is carried out. The General Department of Energy at MIME is in charge of the programm which is divided into two modules: | | Under the Worldbank's Rural Electrification and Transmission Project (RETP) the Rural Energy Strategy Program is carried out. The General Department of Energy at MIME is in charge of the programm which is divided into two modules: |
| | | |
− | <br/>
| + | *'''Module 1''': Rural Electrification - 3 Consultants (WB, EdC, EAC) for the Rural Electrification Strategy and Implementation Plan, Distribution Planning and Regulatory Strategies in Electricity Distribution Market respectively |
− | | + | *'''Module 2''': Non Power Rural Energy - Wood and Biomass Energy Strategy, Sustainable Charcoal Pilot Project, Commercialization of efficient Household Cook Stoves Project. (Cambodia is one of the national partners of the Global Alliance for Clean Cook Stoves). |
− | | + | [[File:Cambodian Rural Energy Strategy MIME-WB 2011.png|left|300px|Components of Rural Energy Strategy Program|alt=Components of Rural Energy Strategy Program]]<br clear=all> |
− | #'''Module 1''': Rural Electrification - 3 Consultants (WB, EdC, EAC) for the Rural Electrification Strategy and Implementation Plan, Distribution Planning and Regulatory Strategies in Electricity Distribution Market respectively
| + | |
− | #'''Module 2''': Non Power Rural Energy - Wood and Biomass Energy Strategy, Sustainable Charcoal Pilot Project, Commercialization of efficient Household Cook Stoves Project. (Cambodia is one of the national partners of the Clobal Alliance for Clean Cook Stoves).
| + | |
− | [[File:Cambodian Rural Energy Strategy MIME-WB 2011.png|center|600px|Components of Rural Energy Strategy Program|alt=Components of Rural Energy Strategy Program]]<br/> | + | |
− | | + | |
− | <br/>
| + | |
| | | |
− | In 2011, as part of the above mentioned Rural Energy Strategy Program, the French Consultancy Innovation Energie Développement (IED) developed the [[:File:Rural Electrification Plan Final Report - Cambodia.pdf|Sustainable Rural Electrification Plan for Cambodia]] [[:File:Rural Electrification Plan Final Report - Cambodia (part1).pdf|(Executive Summary)]] ([http://www.srep-cambodia.com www.srep-cambodia.com]) which shall be executed in order to reach the rural electrification targets set out be the government. Around 1 billion USD will be needed in three stages to reach these targets. The extension of the national grid plays a vital role, but so do mini-grids based on biomass, hydro and solar applications:<br/> | + | In 2011, as part of the above mentioned Rural Energy Strategy Program, the French Consultancy Innovation Energie Développement (IED) developed the [[:File:Rural Electrification Plan Final Report - Cambodia.pdf|Sustainable Rural Electrification Plan for Cambodia]] [[:File:Rural Electrification Plan Final Report - Cambodia (part1).pdf|(Executive Summary)]] ([http://www.srep-cambodia.com www.srep-cambodia.com]) which shall be executed in order to reach the rural electrification targets set out by the government. Around USD 1 billion will be needed in three stages to reach these targets. The extension of the national grid plays a vital role, but so do mini-grids based on biomass, hydro and solar applications:<br/> |
| | | |
| '''Stage 1 of SREP 2011- 2015: $ 418. 5 million''' | | '''Stage 1 of SREP 2011- 2015: $ 418. 5 million''' |
Line 607: |
Line 445: |
| | | |
| Total Off-Grid $ 91.1 million, of which | | Total Off-Grid $ 91.1 million, of which |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| *Off Grid: | | *Off Grid: |
Line 618: |
Line 453: |
| *Community PV $ 2.2 million | | *Community PV $ 2.2 million |
| *Solar Battery Charging $ 0.4 million | | *Solar Battery Charging $ 0.4 million |
− | '''Stage 2: 2016 – 2020, 301.8 million<br/>Stage 3: 2021 – 2030, 287.6 million'''<br/>[[Cambodia Energy Situation#toc|►Go to Top]]
| |
| | | |
− | <br/> | + | '''Stage 2: 2016 – 2020, 301.8 million'''<br/> |
| + | '''Stage 3: 2021 – 2030, 287.6 million'''<br/> |
| + | |
| + | [[Cambodia Energy Situation#toc|►Go to Top]] |
| | | |
| | | |
| == Means of Facilitation == | | == Means of Facilitation == |
| There are basically two means of facilitation used for the improvement of rural energy supply: | | There are basically two means of facilitation used for the improvement of rural energy supply: |
− |
| |
− | <br/>
| |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| === Rural Electrification Fund (REF) === | | === Rural Electrification Fund (REF) === |
Line 639: |
Line 471: |
| | | |
| Activities include: | | Activities include: |
− |
| |
− | <br/>
| |
− |
| |
| | | |
| *'''REE''': grant assistance for REE for increasing household connections (45 USD/connection) - target of 50.000 additional connections nearly reached. Certain eligibility criteria (location, likely reach of the national grid, license, price/kWh, etc.). An Association of REE has been established (2011), funded by REF, to collect info from REE (improvements, challenges, etc.) and to spread technical knowledge and training information. | | *'''REE''': grant assistance for REE for increasing household connections (45 USD/connection) - target of 50.000 additional connections nearly reached. Certain eligibility criteria (location, likely reach of the national grid, license, price/kWh, etc.). An Association of REE has been established (2011), funded by REF, to collect info from REE (improvements, challenges, etc.) and to spread technical knowledge and training information. |
Line 902: |
Line 731: |
| <references /> | | <references /> |
| | | |
− | [[Category:East_Asia_and_Pacific]]
| |
− | [[Category:Cambodia]]
| |
| [[Category:Country_Energy_Situation]] | | [[Category:Country_Energy_Situation]] |
| + | [[Category:Cambodia]] |
| + | [[Category:East_Asia_and_Pacific]] |
The Kingdom of Cambodia is located in the tropical region of Southeast Asia in the Lower Mekong region. The physical landscape is dominated by the lowland plains around the Mekong River and the Tonle Sap Lake. Of the country area 181,040 Km2, approximately 49% remains covered by forest. There are about 2.5 million hectares of arable land and over 0.5 million hectares of pasture land. The climate in Cambodia is tropical and subject to both southeast and northwest monsoons. Cambodia has a population of around 15.1 million people, with a growth rate of about 1.8 % and an average age of the population of 19 years. [1]
Years of war has severely damaged Cambodia’s power sector. After restoration of order in the country the Government has followed a program focused on rehabilitation and development of the basic infrastructure, with the aim of improving the socio - economic conditions. Cambodia is an agricultural country, where over 85% of the population live in rural areas with agriculture as the main profession. Their livelihood depends mainly on agriculture: farming, fishing, livestock, forest and non-forest products.
At the moment, all commercial fossil fuels available in Cambodia (2008: 1.549 ktoe) are imported in the form of LPG(liquidified petroleum gas), gasoline, diesel and other petroleum products.[4]
Oil reserves have been found off the shore of Cambodia. The size of the oil fields are unknown, however, estimated at around 2 billion barrels of oil, which could contribute $2 billion in annual revenues, and about 11 trillion cubic feet of natural gas.
Exploitation was underway when, neighbouring Thailand contested the maritime area claimed by Cambodia based on a 1973 Thai claim on the eastern boundary line of the Gulf in an area known as the Overlapping Claims Area (OCA). In an effort to ease tensions, both countries signed a Memorandum of Understanding in 2001 in which an agreement outlines a framework to solve the maritime dispute. It was however scrapped by the Thai cabinet in 2009 when the Cambodian government appointed ousted prime minister Thaksin Shinawatra as special adviser to Prime Minister Hun Sen. Foreign investors are expected to be strongly involved in the exploitation process. This, together with high corruption rate in Cambodia, contributes to the assumptions of many that the broader population will not profit from these natural resources.
With the new Thai government in place from August 2011 an, Cambodia (as well as Thailand due to its growing energy demand) is eager to start negotiations again soon. Chevron was expected to develop the site.
Chevron Overseas Petroleum (Cambodia) Ltd. is believed to start drilling in offshore Bloc A soon, even though it is quite small. There is some time pressure as work has been delayed, yet not all remaining issues are solved so far. Extraction is to start in 2012. Before this, a possible joint production with Thailand will have to be agreed on. South Korea is also said to be interested in the oil and gas sector in Cambodia. Japanese JOGMEC (Japan Oil Gas Metals Coporation) has signed an MoU with the Cambodian Petroleum Authority on all 17 inland blocs (K. Thim, Siem Reap and Peah Vihear) to investigate data on oil resources. [6]
During the period 1958-61, China’s countrywide mineral survey mission reported indication of coal in Kampot, Kampong Thom, Kratie, Stung Treng and Battanbang provinces. One deposit in Phum Talat in Stung Treng province has also been identified and the reserve has been estimated to be around 7 million tons, the exploitation might be feasible for application in cement production and for domestic fuel. The inventory and feasibility study of coal deposits in Cambodia are needed.[1]
A new coal fired power plant is planned to be built in Sihanoukville: 135 MW. With a PPA agreement, the government is obliged to have a guarantee i.e. the Cambodia International Investment Development Group, which is owned by ruling party senator Lao Meng Khin, in case the state-owned Electrucite du Cambodge, fails to pay for the power.[7]
Another coal fired power plant (1,800 MW) is planned to be built in Koh Kong by Cambodian tycoon Ly Yong Phat (Cambodia People's Party senator, stakes in hotels, entertainment, utilities, plantations etc in Koh Kong) under a US$3 billion joint-venture agreement with Thai energy firm Ratchaburi Electricity Generating Plc. The ownership structure is unknown and would be Cambodia's largest power station. However, under 90 % of the power (1,600 MW), would be sold to Thailand. Tariffs are currently being negotiated. Also 30 Million USD are going to be invested in power lines between the coal plant and the Tata Hydropower plant in Koh Kong.From the Thai side, this project is attractive as in Thailand the company has received very strong criticism from environmentalists on projects like this - now this problem is being outsourced to Cambodia. The Cambodian government should conduct a proper environmental impact assessment for the plant. Marketing the power domestically could drop power prices to $0.04, down from the current $0.17, one of the highest rates in the region. Yet the plant would far exceed the country’s current demand for power.[8]
Cambodia has abundant RE resources such as mini/micro/pico hydropower, solar, biomass and other.At present, the development of RE sources in Cambodia is very slow in comparison with its neighboring countries, because of the lack of experiences and funds, and inadequate data. Hence the utilization of these sources is also insignificant in the contribution to the total energy supply mix, which is mainly based on imported fuel oil for power generation.
In order to promote RE development, Cambodia (in late 2011/ early 2012) is working on a RE strategy which lays down the policy intention, objectives and guidelines for developing the requisite infrastructure for providing renewable electricity services in rural areas.
Biomass is the main source of energy for Cambodia, mainly in the form of the wood and charcoal. Wood-fuel serves about 85% of the total energy demand and is used for domestic cooking and also extensively by industries, but currently is not used for power generation.
The New Energy and Industrial Technology Development Organization (NEDO) has conducted an assessment of the potential for using biomass as a source of renewable energy in Cambodia.Based on existing crop and livestock residues and if assumes 35% conversion efficiency, the preliminary assessment of biomass generation potential estimate at around 18.852 GWh/yr with 2 MW already exploited.
The first biomass (mostly rice husk is used by rice mills and fire wood by ice plants and REE) were introduced in 2006 by SME Renewable Energywhi imported Ankur gasifiers from India. Soon, local companies started copying these gasifiers - with varying quality. Especially ice plants which run 24/7 can achieve huge savings with gasifiers, as do big rice mills due to the available fuel.Due to the huge amount of rice husk available - if all risk husk resources from mills were used in gasifiers to generate electricity, up to 30% of Cambodia's current electricity demand could be met (1.3 mio. metric tons of rice husk generating 650.000 MWh - 750 MW capacity). Additionally,Cambodia should also focus on improving quality and safety of gasifiers, as well as only using sustainable biomass/ bio waste, such as cut off from rubber or cashew plantations, to avoid contributing to deforestation. In many rice mills, only 25% of rice husk is needed to generated the power needed. Therefore, abundant husks could be sold on to other gasifier operators. The logistics in this and in harnessing the vast potential of rice husk through out the country where smaller (e.g. houshold) mills operate are further challenges to overcome.Rice mills do not operate throughout the year, therefore easier access to licenses to sell electricity and act as an REE or to feed into the grid would make this business more profitable for them and would make use of the installed capacity.
Main challenges for implementing these gasifiers are lacking know how of the workforce/operators, careless handling of waste tar and waste water which is often dumped in nearby rivers or fields with great harmful impacts, low work safety and lacking quality, waste and environmental standards.
Jatropha – 200 ha (Fencing), around 10 companies - 1.000ha, Palm Oil – 4,000 ha (recently) (potential up to 10, 000 ha) and sugar cane 20,000 ha.
One Korean company is producing ethanol from cassava: production capacity of ethanol 36,000 t/year from 100,000 tons of cassava.
Based on insulation of 5.10 kWh/sq.m on 0.02% of Cambodia's land area, the preliminary solar power generation potential estimate is about 7,665 GWh/yr and solar hot water potential is estimated at 17,995 GWh/yr.
In Cambodia, the use of solar photovoltaic technology has started since 1997 for lighting, radio, TV and telecommunication in the rural areas. The total installation is about 1,150 kWp and primarily has been installed on telecommunication repeater station in remote areas. Most of the solar systems resulted from donor projects supported by SIDA, NEDO and other donors. All the equipment is imported from other countries.
A World Bank programme carried out via the REF and Sunlabob/Kamworks is to install 12,000 solar home systems (SHS) throughout seven of Cambodia’s provinces from Mid 2011 till January 2012. The project is implemented by Lao-based company Sunlabob. Sunlabob is also said to be in talks with the government to continue developing solar energy beyond household units, possibly expanding to the construction of centralised systems in remote areas that households could connect to. It allegedly is also looking at a larger-scale solar plant that would allow Sunlabob to sell energy to the state power company, Electricite du Cambodge.[10]
The main obstacles for solar industry are accessibility, awareness and affordability.[2]
The potential of wind energy is small in account of average wind speed of 3m/s and less. The estimated wind generation potential is 3,666 GWh/yr. However, the southern coastal area (Sihanouk Ville, Kampot, Kep, Koh Kong) and mountainous areas in the southwest and northeast of the country, as well as on the southern part of the reat lake Tonle Sap, have favorable wind condition for wind power generation because of average wind speed of around 5m/s. (5% of country surface). Still, wind energy is subject to great seasonal variations.
Wind energy has been utilized for water pumping in central part of Cambodia (Prey Veng province) which is supported by the NGO with installed capacity of 700 kW.
In theory, the hydro potential is said to be 10.000 MW, but current contribution is far less (20 MW, with many more under construction).
In 2010, hydro contributed 3% to Cambodia's total electricity supply.
The potential for large hydro has only been explored. 29 locations with a potential greater than 10 MW have been identified and are at different stages of development. A huge issue is the mitigation of social and environmental impacts of large dams, especially on the Mekong and its tributaries (e.g. fisheries, resettlement, land issues, changes in flood patterns, less sediments, GHG emissions from reservoirs in (sub-)tropical countries, etc.). Lacking transparency, great involvement of foreign investment, lacking environmental and social impact assessment and community consultations make large scale hydro highly controversial.Critics say that these plants infringe on indigenous customs of tribal people (e.g. Koh Kong plant, Se San 2). [11] Grass-root level community protests, such as the one against the planned Hydro Dam Lower Se San 2 are becoming more common and heard.[12]
Besides the already existing large scale hydro power generation plant, a serious of new plants is being planned. Especially Vietnamese (EVNI) and Chinese companies are investing in Cambodia in the large-scale hydro field:
Cambodia has an enormous water resource for hydropower development and in some parts of the country, mini/micro/pico hydropower may provide opportunities for rural electrification. The assessment of theoretical potential of mini, micro, pico hydropower is about 300 MW with present installed capacity of 1.87 MW. At present, there is one mini hydropower plant with 1 MW installed capacity and 2 micro hydropower plants with total installed capacity of 370 kW which are in operation under the responsibility of Provincial Electricity Unit of Electricite Du Cambodge (EDC). There are also privatly owned micro and pico hydropower plants with the installed capacity ranged from 1 kW to 30 kW in the northern provinces and the units are imported from Vietnam or China.
Often, these hydropower stations are located in mountainous areas and the cost for establishing distribution networks is very high, making small -hydropower in many cases unaffordable.
Geothermal: no assessments available, some thermal springs, but appear low-grade.
Tidal: no assessments available, low apparent potential.
At present the RE development is still at the beginning stage and needs more support from the Royal Government to overcome serious barriers to promote RE development and to facilitate private sector participation.
During the 1970s, the electricity sector was seriously damaged by the civil war from 1970 to 1979. During this time, there was only one transmission line in Cambodia connecting the Kiriom I Hydropower Station to Phnom Penh capital town with a voltage rating of 115 kV and length of 120 km which ceased to operate since 1973 when most electricity related facilities including generation, transmission and distribution facilities were nearly destroyed.
Since 1995, the Cambodian government is making efforts to reestablish the electricity sector. However till today, there is no national electricity network and electricity is supplied via the 24 small isolated electricity systems.
EdC, the government-owned utility, serves Phnom Penh, Sihanoukville, Siem Reap, Kampong Cham, Takeo and Battambang, accounting for nearly 90 percent of total electricity consumption. EdC serves approximately 10 percent of the population with most of its customers located in Phnom Penh.Nearly half of EdC’s installed power supply capacity of 140MW is purchased from 2 IPPs (63 MW). Despite the creation of substantial IPP generation capacity and EdC’s commendable efforts to reduce system losses from nearly 25 percent to 13 percent, the quality and reliability of electricity supply in Phnom Penh continues to be poor.[16]
From 2003 to 2008, the electricity demand rose on an average 22.3% while the electricity supply rose only 21.5%. The electricity production rose from 695 GWh in 2003 to 1,681 GWh in 2008. However, the electricity demand rose from 134 MW in 2003 to 314 MW in 2008. In particular, the highest record of growth rate is being updated year by year and reached 26.7% and 27.5% for electricity supply and electricity demand respectively in 2007. In 2010 the annual electric energy consumption per capita was 160 kWh.
The electricity mix consist of 34% imported electricity (28% Vietnam, 13.6% Thailand, 0.4% Lao), 54% heavy fuel oil, 3% hydropower, 2% coal and others. At the moment Cambodia is eager in increasing electricity generation capacities (hydro and coal plants) to decrease import dependencies. 93% of electricity generated by licensed operators is based on expensive, imported diesel fuel.
In 2008, only 25% of households have access to electricity (rural electrification rate of around 15%). The Phnom Penh capital zone, in particular, shares 80% or more of national total electricity consumption: in 2010 300 MW annual consumption load (of 538 MW nation wide). Yet, power shortages are common and increasing as power supply cannot keep track with demand.[17]
Several private companies are active in the electricity sector in Cambodia, running or investing in power porjects (mostly hydro or coal) or advising the Government on its electrification strategy.[18]
The figure below shows the generation as well as supply of electricity in Cambodia (2011).
As a great share of the electricity is imported and are used to produce more than half of locally produced electricity, Cambodian electricity prices are among the highest in the region. With the development of large hydro potentials and more coal fired plants, these tariffs might decline in the future. Yet,the national power grid is still being constructed, so tariffs will also have to fund the extension of the distribution network. In summer 2011, electricity prices were:
According to the available electricity demand forecast in Cambodia prepared by the Ministry of Industry, Mines and Energy in 2007 and on the demand forecast by World Bank and KEPCO in 2006, the electricity demand projection in Cambodia in 2024 is 3,045.33 MW and 16,244.61 GWh for capacity and electric energy respectively.
Cambodian power generation in 2010 is put at 1.3TWh, having risen around 5.0% from the 2009 level. An average 8.9% annual increase to 2.0TWh between 2011 and 2015 is expected. Thermal generation, comprising coal, gas and oil, is expected to increase by an average 8.9% per annum during the period to 2015, but growth looks set to accelerate later in the decade.
The use of domestic natural gas supply in power generation is dependent on successful development of gas resources currently under investigation, with Chevron's Block A prospects capable of supplying gas from 2013. Oil currently accounts for around 95.7% of total generation, rising to a possible 96.3% by 2015, in spite of greater hydro, coal and gas expansion. Oil will remain a significant part of the Cambodian power generation mix, although its market share should eventually fall thanks to fuel substitution.
So far, no national grid exists. Cambodia has ambitious plans regarding its grid development plan. Until 2027 roughly 2,100 km electricity grid (230kV and 115kV transfer lines) are to be constructed with interconnections between existing grid systems such as Phnom Penh and surroundings, connections to planned power plants as well as cross-border lines to Lao.
Cambodia faces a major challenge to develop an adequate and reliable source of electricity in the years ahead. Based on intensive studies of the best means for providing a national electricity supply network, the Royal Government of Cambodia (RGC) formulated an electricity sector development policy in October 1994, which aimed at:
In order to meet the growing demand for electricity over the next 20 years, the RGC is formulating an electricity sector strategy which consists of:
It was reported that the major natural resources for power generation available in Cambodia is hydropower with potential of 10,000 MW or more, however, the hydropower capacity already developed in Cambodia is very limited to be only around 13 MW and 10,000 MW is large enough compared with the next 15 years domestic electricity demand of around 3,045.33 MW in 2024.
In summary, the strategic plan of Cambodia is to procure the required electric energy by importing electricity from neighboring countries for the coming years and, after that, to utilize hydropower, which is the major source of domestic renewable energy, as much as possible in parallel with development of coal thermal plants step by step.
The Rural Electrification Strategy (RES) of the Royal Government of Cambodia (RGC) aims to substantially scale up access to electricity services for rural area, where about 85% of the Cambodian population lives and only 15% of them have access to electricity services and to improve the standard of living, reduce poverty and foster economic development. By 2020, the objective is for all villages (100%) to have access to electricity in different forms; by the year 2030 - 70% of all rural households should be electrified. The remaining rural households (30%) shall be targeted by a "Renewable Energy Development Program" which will provide quality renewable energy services in remote regions by using mostly solar applications (solar lanterns, SHS). The main components of the Rural Electrification Strategy are as follows:
Renewable Energy (solar, wind, mini/micro hydro power, biomass, biogas, etc.) - renewable energy target of 15% of electricity generation by 2015 (excluding large hydro)
According to the "Master Plan Study Rural Electrification by Renewable Energy in the Kingdom of Cambodia (June 2006, JICA), the maximum use of renewable energy including micro hydropower was proposed to secure sustainability for source of electricity. This study recommended the off-grid electrification with micro hydropower scheme for such mountainous or hilly areas where hydropower potential is bigger than village size demand and village exists within an economic distance for transmission from the potential site as the most promising electricity source for such areas. The 145 number of micro to mini hydro power potential sites in the capacity range from 1 kW to 2,585 kW were identified in this Master Plan Study. Micro hydropower stations, which generate about 300 W to 1 kW are quite common and require little capital. They will be ideal for small rural communities.
In order to facilitate access to electricity supply at reasonable and affordable price in rural areas, the Government of Cambodia has established "Rural Electrification Fund" (see below) for enabling the development of electricity supply facilities in such areas. The objective of the fund is to promote and encourage the private sector to participate in providing the sustainable rural electrification services.
Also, the objective of Rural Electrification Fund for the next five years term includes the provision of grant for development of 850 kW of micro hydropower and 6,000 kW of mini hydropower plants as well as 12,000 solar home systems.
In early 2012, in a haste, a wood and biomass energy strategy was commissioned by MIME. Even though biomass remains a very important energy source for the Cambodian people, it has widely been ignored. The strategy is a combination of different projects: efficient charcoal production, efficient fuel wood/biomass use in industries (brick kilns, garment factories, ice plants), up-scaling of the improved cook stove project to rural areas, analysing wood flows, managing forest resources sustainably, using agricultural waste (rice husk), etc. Funding is outstanding. Coordination between MIME and the Forestry Administration is lacking. A inter-ministerial working group has been suspended. The supply and demand side do not coordinate their actions.
Recently, an effort has been started to come up with an entire energy sector strategy. This approach is new to the energy topic in Cambodia but leaves room for hope for the future development of the energy situation, especially for rural areas. Aspects from the Masterplan are also used for this programme.
Under the Worldbank's Rural Electrification and Transmission Project (RETP) the Rural Energy Strategy Program is carried out. The General Department of Energy at MIME is in charge of the programm which is divided into two modules:
In 2011, as part of the above mentioned Rural Energy Strategy Program, the French Consultancy Innovation Energie Développement (IED) developed the Sustainable Rural Electrification Plan for Cambodia (Executive Summary) (www.srep-cambodia.com) which shall be executed in order to reach the rural electrification targets set out by the government. Around USD 1 billion will be needed in three stages to reach these targets. The extension of the national grid plays a vital role, but so do mini-grids based on biomass, hydro and solar applications:
There are basically two means of facilitation used for the improvement of rural energy supply:
The REF is part of the REAP with the goal of achieving Cambodia's electrification targets. Renewable energies play a certain role in its programme. Mini hydro plants and solar home systems are eligible to recieve subsidies up to 25% of total investment costs. The International Development Association (IDA) and der Global Environmental Facility (GEF) provide the money for the REF.
The project period of the fund is 2004 to 01/2012. From 2012 onwards, the fund has to find new means of funding.
Several fiscal and investment incentives have been agreed upon for project developers active in renewable energies in a law from 2003. Yet, it is not clear, in which degree companies can use these incentives and up to which amount they can be granted. Also, information on reduced custom duties on renewable energy equipment varies greatly.
While the policy framework for rural electrification is quite comprehensive, there is a policy gap with respect to other types of energy that are essential for the rural population. In other words, cooking energy that is supplied by biomass, or fuels such as LPG is not yet covered by a specific policy.[23]
Yet, a wood and biomass energy strategy is currently under development by MIME, funded by the WB RETP. First results are expected in late 2011. Under the same programme, a sustainable charcoal pilot project is being carried out (GERES). The third component of the non-power sector activities currently deals with the commercialization of efficient household cook stoves (funded by RETP/Aus-AID) (also GERES).
Of the 249 REEs (estimate), approx. 226 are engaged in distribution and retailing, the remaining ones are only distributors. 50% of REEs offer 24h service, the rest operates only 4-12 hours per day.
Other figueres mention: Some REEs (31) are only distributors, bying power from EdC and selling it on to the customers, 178 are consolidated companies which generate and distribute electricity.
226 (estimate) are unlicensed REEs. REEs are extremely important for the electricity sector in Cambodia.
Overview of the institutional set-up of Cambodia's electricity sector.
The project will focus on innovative pilot projects in corporation with the private sector to establish sustainability beyond the project phase: Pilots in the field of solar and wind pumps (for irrigation and water supply), bio-gasification (rise husk, etc.) and further business models regarding Jatropha are under discussion.
So far, no formal working group on renewable energies has been established to foster communication and coordination between donors and between donors and governmental institutions.
Finland will double its support for green energy projects in Thailand, Laos, Vietnam and Cambodia from 4.9 mil. Euro to 9.1 mil. Euro for the 2013 - 2016 extension. TheEnergy and Environment Partnership Programme for clean technologies was launched in 2009 by the Ministry for Foreign Affairs of Finland with support from theNordic Development Fund, also sponsored by Denmark, Iceland, Norway, and Sweden. During the first phase of the programme that runs till this year the donors have allocated a budget of Euro 7,9 million. To date, more than thirty projects in Thailand, Laos, Cambodia and Vietnam have benefited from the funds.[31]