SOFTWARE UPDATE ANNOUNCEMENT: 30 AUG - 15 SEP
|
Error creating thumbnail: convert: unable to open image `/var/www/ISWiki/prod/current/energypedia/images/0/0a/Icon_Announcement.png': No such file or directory @ error/blob.c/OpenBlob/2641. convert: no images defined `/tmp/transform_345bfa8-1.png' @ error/convert.c/ConvertImageCommand/3044.
|
Hurrah! Your beloved energypedia is getting a new software update to ensure faster and easier knowledge exchange and sharing on energypedia. After the new software update, you can expect a new and updated energypedia with a responsive design.
Hence, from 30 Aug to 15 Sep, energypedia will be on read-only mode and you will not be able to download/upload content or create/edit articles on energypedia.
|
Risks in Project Development
From old.energypedia.info
(Difference between revisions)
|
|
Line 4: |
Line 4: |
| |ECA Topics=Other | | |ECA Topics=Other |
| |ECA Country=Worldwide | | |ECA Country=Worldwide |
− | |ECA Answer=An extensive list of risks organized in six sub-categories based on literature review and field experience in monitoring. For most of the risks there are suggestions on how to minimize, mitigate or controll them during the life cycle of a project. | + | |ECA Answer=Extensive list of risks organized in six sub-categories based on literature review and field experience in monitoring. With additional suggestions on how to minimize, mitigate or controll some of the riks during the life cycle of a project. |
− | The four main steps of risk management are presented in a graph that encapsulates the essentials of this iterative process. In addition, there is an explanation on how to prioritize risks according to the dimensions of their probability to occur and their impact potential.
| + | |
− | An example of activities that can be carried out during a projects’ preparation as guidance on how to be aware of risks.
| + | |
− | At the end the reader can consider revising some experiences applying de-risking approaches for rural electrification projects (mini-grids and hydro), as well as further reading about risks management for renewable energy systems.
| + | |
| | | |
| + | Explanation on how to prioritize risks according to the dimensions of their probability to occur and their impact potential. |
| + | |
| + | Example of activities that can be carried out during a projects’ preparation as guidance on how to be aware of risks. |
| + | |
| + | List of experiences applying de-risking approaches for rural electrification projects (mini-grids and hydro), as well as further reading about risks management for renewable energy systems. |
| }} | | }} |
| {{ECA Links | | {{ECA Links |
| |ECA Answer Link=https://energypedia.info/wiki/Risks_in_Energy_Access_Projects | | |ECA Answer Link=https://energypedia.info/wiki/Risks_in_Energy_Access_Projects |
| }} | | }} |
Latest revision as of 09:45, 19 May 2017
►See all questions
Title:
|
Risks in Project Development
|
Questions in detail:
|
What types of risks are involved implementing an energy access project?
|
Topics:
|
Other
|
Country:
|
Worldwide
|
Answer:
|
Extensive list of risks organized in six sub-categories based on literature review and field experience in monitoring. With additional suggestions on how to minimize, mitigate or controll some of the riks during the life cycle of a project.
Explanation on how to prioritize risks according to the dimensions of their probability to occur and their impact potential.
Example of activities that can be carried out during a projects’ preparation as guidance on how to be aware of risks.
List of experiences applying de-risking approaches for rural electrification projects (mini-grids and hydro), as well as further reading about risks management for renewable energy systems.
|