| Line 1: | 
Line 1: | 
| − | = '''<u></u>'''Overview<br/> =  | + | = Overview<br/> =  | 
|   |  |   |  | 
| − | '''<u>Location of the site:<br/></u>'''  | + | '''<u>Location of the site:</u>'''  | 
|   |  |   |  | 
|   | *<u>Country</u>: Germany  |   | *<u>Country</u>: Germany  | 
| Line 12: | 
Line 12: | 
|   |  |   |  | 
|   |  |   |  | 
| − | = Construction and Comissioning<br/> =  | + | = Further Information - Project<br/> =  | 
|   |  |   |  | 
|   | '''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012  |   | '''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012  | 
| Line 29: | 
Line 29: | 
|   | |-  |   | |-  | 
|   | | colspan="2" |    |   | | colspan="2" |    | 
| − | [[File:Haeusleberg farm.jpg|frame|none|760px|A view over the Häusleberg organic farm]]  | + | [[File:Haeusleberg farm.jpg|frame|center|760px|A view over the Häusleberg organic farm]]  | 
|   |  |   |  | 
|   | |-  |   | |-  | 
| Line 36: | 
Line 36: | 
|   |  |   |  | 
|   | |-  |   | |-  | 
| − | | [[File:Haeusleberg turbine 1.jpg|frame|none|370px|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/>  | + | | [[File:Haeusleberg turbine 1.jpg|frame|center|370px|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/>  | 
| − | | [[File:Haeusleberg turbine 2.jpg|frame|none|370px|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/>  | + | | [[File:Haeusleberg turbine 2.jpg|frame|center|370px|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/>  | 
|   | |-  |   | |-  | 
|   | | <br/>  |   | | <br/>  | 
|   | | <br/>  |   | | <br/>  | 
|   | |-  |   | |-  | 
| − | | [[File:Haeusleberg turbine 3.jpg|frame|none|370px|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/>  | + | | [[File:Haeusleberg turbine 3.jpg|frame|center|370px|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/>  | 
| − | | [[File:Haeusleberg turbine 4.jpg|frame|none|370px|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/>  | + | | [[File:Haeusleberg turbine 4.jpg|frame|center|370px|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/>  | 
|   | |-  |   | |-  | 
|   | | <br/>  |   | | <br/>  | 
|   | |  <br/>  |   | |  <br/>  | 
|   | |-  |   | |-  | 
| − | | [[File:Haeusleberg turbine 5.jpg|frame|none|370px|Nozzle alignment test.]]<br/>  | + | | [[File:Haeusleberg turbine 5.jpg|frame|center|370px|Nozzle alignment test.]]<br/>  | 
|   | |    |   | |    | 
|   | |-  |   | |-  | 
		Revision as of 14:03, 12 December 2012
  Overview
 
Location of the site:
- Country: Germany
 - District: Baden-Württemberg
 - River: Schanzbach
 - GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E
 
This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: sites.google.com/site/haeusleberg/
  Further Information - Project
 
Start of Construction: December 2011
Date of Commissioning: June 2012
 
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Turbine: Pelton
Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
   A view over the Häusleberg organic farm  
 | 
| 
   
 
 | 
    Side view of the installed turbine atop the wooden framed drainage barrel.  
 | 
    Top view of the installed turbine atop the wooden framed drainage barrel.  
 | 
  
 | 
  
 | 
    The turbine from below showing the pelton runner at the nozzle mounting bracket.  
 | 
    The stator of the direct drive motor during modifications for the 12 V hybrid system.  
 | 
  
 | 
   
 | 
    Nozzle alignment test.  
 | 
 | 
  
 | 
 | 