| Line 1: | 
Line 1: | 
| − | 
  |   | 
| − | 
  |   | 
|   |  |   |  | 
|   | = Overview<br/> =  |   | = Overview<br/> =  | 
| Line 36: | 
Line 34: | 
|   | == MHP costs in Rwanda<br/> ==  |   | == MHP costs in Rwanda<br/> ==  | 
|   |  |   |  | 
| − | *in [[Results GIZ Kigali MHP meeting 2011|Rwanda in 2011 various cost categories for MHP were analysed.]]  | + | *in [[Results_GIZ_Kigali_MHP_meeting_2011|Rwanda in 2011 various cost categories for MHP were analysed.]]  | 
| − | *A special chapter about the [[Estimation of management costs|management costs]] was developed, too.  | + | *A special chapter about the [[Micro-Hydropower_Plants_-_Estimation_of_Management_Costs|management costs]] was developed, too.  | 
|   |  |   |  | 
|   | + | <br/>  | 
|   |  |   |  | 
|   | = Further Information =  |   | = Further Information =  | 
| − | 
  |   | 
| − | 
  |   | 
|   |  |   |  | 
|   | = References<br/> =  |   | = References<br/> =  | 
| Line 48: | 
Line 45: | 
|   | <references />  |   | <references />  | 
|   |  |   |  | 
| − | [[Category:Financing_and_Funding]]
  |   | 
| − | [[Category:Rwanda]]
  |   | 
| − | [[Category:Hydro]]
  |   | 
|   | [[Category:Micro_Hydro]]  |   | [[Category:Micro_Hydro]]  | 
|   | + | [[Category:Hydro]]  | 
|   | + | [[Category:Rwanda]]  | 
|   | + | [[Category:Financing_and_Funding]]  | 
		Revision as of 13:38, 9 July 2014
  Overview
 
Micro-Hydro Power (MHP) projects come along with a big variety of costs. Planning and developing a site brings a number of country, probalby regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework conditition might occur. A clear cost analysis upfront is highy recommended.
  Cost factors are eventually: 
a locations feasibility check by respective personal
land/water ownership/usage
civil construction (canal, wear, intake, pipes, powerhouse)
electro-mechanical equipment (turbine, generator, load controller)
power grid (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...)
opperation & maintenance (collecting tarrifs, running and maintaining the assets)
 
Land & water requirements are mostly small. But there may be interference with existing schemes (irrigation) or legal issues to be considered.
Order to delivery of electro-mechanical equipment may take half a year. Ensure to order in time.
Costs for power lines and household connections often require a substantial amount from the overall budged.
Any mhp scheme supplying a group of households has to install fixed procedures to cover operation & maintenance.
This includes the collection of tariffs from each user.
  MHP costs in Rwanda
 
  Further Information 
  References