| Line 2: | 
Line 2: | 
|   | = Overview<br/> =  |   | = Overview<br/> =  | 
|   |  |   |  | 
| − | '''Micro-Hydro Power (MHP)''' projects come along with a big variety of costs. Planning and developing a site brings a number of country, probalby regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework conditition might occur. A clear cost analysis upfront is highy recommended.<br/>  | + | '''Micro-Hydro Power (MHP)''' projects come along with a big variety of costs. Planning and developing a site brings a number of country, probably regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework condition might occur. A clear cost analysis upfront is highly recommended.<br/>  | 
|   |  |   |  | 
|   | == Cost factors are eventually: ==  |   | == Cost factors are eventually: ==  | 
| Line 16: | 
Line 16: | 
|   | <u>power grid</u> (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...)  |   | <u>power grid</u> (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...)  | 
|   |  |   |  | 
| − | <u>opperation & maintenance</u> (collecting tarrifs, running and maintaining the assets)  | + | <u>operation & maintenance</u> (collecting tariffs, running and maintaining the assets)  | 
|   |  |   |  | 
|   | == Some remarks regarding costs: ==  |   | == Some remarks regarding costs: ==  | 
| Line 40: | 
Line 40: | 
|   |  |   |  | 
|   | = Further Information =  |   | = Further Information =  | 
|   | + |  | 
|   | + | *[[Portal:Hydro|Portal:Hydro]]<br/>  | 
|   | + | *[[Micro-Hydro_Power_-_Analysis_of_Costs|Micro-Hydro Power - Analysis of Costs]]<br/>  | 
|   | + | *[[Micro-Hydropower_Plants_-_Estimation_of_Management_Costs|Micro-Hydropower Plants - Estimation of Management Costs]]  | 
|   |  |   |  | 
|   | = References<br/> =  |   | = References<br/> =  | 
| Line 45: | 
Line 49: | 
|   | <references />  |   | <references />  | 
|   |  |   |  | 
| − | [[Category:Micro_Hydro]]
  |   | 
| − | [[Category:Hydro]]
  |   | 
| − | [[Category:Rwanda]]
  |   | 
|   | [[Category:Financing_and_Funding]]  |   | [[Category:Financing_and_Funding]]  | 
|   | + | [[Category:Rwanda]]  | 
|   | + | [[Category:Hydro]]  | 
|   | + | [[Category:Micro_Hydro]]  | 
		Revision as of 13:58, 30 July 2014
  Overview
 
Micro-Hydro Power (MHP) projects come along with a big variety of costs. Planning and developing a site brings a number of country, probably regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework condition might occur. A clear cost analysis upfront is highly recommended.
  Cost factors are eventually: 
a locations feasibility check by respective personal
land/water ownership/usage
civil construction (canal, wear, intake, pipes, powerhouse)
electro-mechanical equipment (turbine, generator, load controller)
power grid (evtl. transformers, powerlines, house-cabeling, load limiters, meter installation, ...)
operation & maintenance (collecting tariffs, running and maintaining the assets)
 
Land & water requirements are mostly small. But there may be interference with existing schemes (irrigation) or legal issues to be considered.
Order to delivery of electro-mechanical equipment may take half a year. Ensure to order in time.
Costs for power lines and household connections often require a substantial amount from the overall budged.
Any mhp scheme supplying a group of households has to install fixed procedures to cover operation & maintenance.
This includes the collection of tariffs from each user.