Revision as of 14:47, 17 July 2012 by 
*****  (***** | *****) 
				 
        				
        				        				        				        				
        				
Back to the Hydropower Sites Database
  General Information 
|  Country:
 | 
 Ethiopia
 | 
|  City/Town:
 | 
 Oromiya
 | 
|  Coordinates (Powerhouse):
 | 
 The following coordinate was not recognized: Latitude= 9.558, Longitude= 37.3663..The following coordinate was not recognized: Latitude= 9.558, Longitude= 37.3663..
 | 
|  Year of Commission:
 | 
 1974
 | 
|  Basin Name:
 | 
 Tana Lake
 | 
|  Stream Name:
 | 
 | 
|  Developer:
 | 
 | 
|  Operator:
 | 
 Ethiopian Electric and Power Company
 | 
|  Project Status:
 | 
 | 
|  Any other uses of the water source:
 | 
 | 
|  Contact:
 | 
 | 
|  Comment:
 | 
 | 
|  Link to Photos:
 | 
 | 
  Technical Information 
|  Power: (kW)
 | 
 84,000
 | 
|  Energy (kWh/a):
 | 
 532,000,000
 | 
|  Capacity Factor (%):
 | 
 72
 | 
|  Penstock Diameter (mm):
 | 
 | 
|  Penstock Length (m):
 | 
 | 
|  Penstock Material (m³/s):
 | 
 | 
|  Maximum Flow of the Penstock (m³/s):
 | 
 | 
|  Minimum Flow of the Stream (m³/s):
 | 
 | 
|  Head (m):
 | 
 | 
|  Turbine Type:
 | 
 Pelton
 | 
|  Turbine Manufacturer:
 | 
 | 
|  Generator Type:
 | 
 | 
|  Generator Capacity (kW):
 | 
 | 
|  Generator Manufacturer:
 | 
 | 
|  Comment:
 | 
 | 
  Mini/Island Grid Information 
|  Mini Grid:
 | 
 No
 | 
|  Load Control Information:
 | 
 | 
|  Connection Type:
 | 
 | 
|  Public Lighting:
 | 
 | 
|  Length of Transmission Line (m):
 | 
 | 
|  Voltage (v):
 | 
 | 
|  Transmission Conductor (type) :
 | 
 | 
|  Diameter of Conductor (mm²):
 | 
 | 
|  Transformer Rating (kVA):
 | 
 | 
|  Link to Grid:
 | 
 | 
|  S.W.E.R:
 | 
 | 
|  Operational Period (Xdays/year):
 | 
 | 
|  Comment:
 | 
 | 
  Dam Information 
| 
 Dam Type:
 
 | 
 Dam on river with reservoir
 | 
|  Dam Construction Material:
 | 
 | 
|  Dam Height [m]:
 | 
 20
 | 
|  Length of Dam [m]:
 | 
 340
 | 
|  Storage Volume of Reservoir (m³):
 | 
 650,000,000
 | 
|  Flood Storage of Reservoir:
 | 
 | 
|  Channel Material:
 | 
 | 
|  Comment:
 | 
 | 
  Economic Information 
| Cost (€):
 | 
 32,797,514
 | 
|  Donor/Financier & Percentage:
 | 
 | 
|  Tariff Levels:
 | 
 | 
|  Connected Households:
 | 
 | 
|  Connection Cost (€):
 | 
 | 
|  Cost to be Covered by Households (%):
 | 
 | 
|  Comment:
 | 
 | 
|  Link to Cost Breakdown:
 | 
 |