Revision as of 21:53, 11 December 2012 by
***** (***** | *****)
Location of the site:
- Country: Germany
- District: Baden-Württemberg
- River: Schanzbach
- GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E
This small pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website:
https://sites.google.com/site/haeusleberg/
Start of construction: December 2011
Date of Commissioning: June 2012
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Turbine: Pelton
Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)