Revision as of 21:04, 26 March 2014 by 
*****  (***** | *****) 
				 
        				
        				        				        				        				
        				
= Overview<br/> =
<u>Location of the site:</u>
*<u>Country</u>: Germany
*<u>District</u>: <span style="color: rgb(34, 34, 34); font-family: arial, sans-serif; font-size: small; line-height: 16px">Baden-Württemberg</span>
*<u>River</u>: Schanzbach
*<u>GPS Coordinates</u>: 47<span style="text-align: left">º55’40.5’’N 7º55’31.2’’E</span>
<br/>This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: 
sites.google.com/site/haeusleberg/
<br/>
= Further Information - Project<br/> =
Start of Construction: December 2011<br/>Date of Commissioning: June 2012
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
<br/>Turbine: Pelton
Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
{| class="FCK__ShowTableBorders" border="0" cellpadding="3" cellspacing="1" style="width: 100%;"
|-
| colspan="2" | 
[[File:Haeusleberg farm.jpg|frame|center|A view over the Häusleberg organic farm]]
|-
| colspan="2" | 
<br/>
|-
| [[File:Haeusleberg turbine 1.jpg|frame|center|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
| [[File:Haeusleberg turbine 2.jpg|frame|center|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
|-
| <br/>
| <br/>
|-
| [[File:Haeusleberg turbine 3.jpg|frame|center|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/>
| [[File:Haeusleberg turbine 4.jpg|frame|center|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/>
|-
| <br/>
| <br/>
|-
| [[File:Haeusleberg turbine 5.jpg|frame|center|Nozzle alignment test.]]<br/>
| 
|-
| <br/>
| 
|}
<br/>
= Further Information<br/> =
<br/>
= References<br/> =
<references />
Location of the site:
- Country: text
 - District: text
 - River: text
 - GPS Coordinates: text
 
add general comments such as number of connected HH in this segment
Start of construction:
Date of Commissioning:
Ownership / Operation Model:
Tariff structure:
Turbine:
Generator: 
 
|  add picture of MHP location
 | 
 add picture of MHP location
 | 
|  add description of picture
 | 
 add description of picture
 | 
 add picture of MHP location 
 | 
 add picture of MHP location
 | 
|  add description of picture
 | 
 add description of picture
 | 
add respective country category