Revision as of 19:46, 27 March 2014 by 
*****  (***** | *****) 
				 
        				
        				        				        				        				
        				
  Overview
 
|  Name of the site:
 | 
 El Plan
 | 
|  Country:
 | 
 Nicaragua (GPS Coordinates: ?)
 | 
|  Turbine Type:
 | 
 Pelton
 | 
|  Power Output:
 | 
 X kW
 | 
|  Project Status:
 | 
 in operation
 | 
|  Comments:
 | 
 ?
 | 
  Operation Data
 
|  Gross Head:
 | 
 
 | 
|  Net Head:
 | 
 
 | 
|  Flow (design flow):
 | 
 
 | 
|  Comments on flow variation during the year:
 | 
 
 | 
|  
 | 
 
 | 
|  
 | 
 
 | 
|  
 | 
 
 | 
|  
 | 
 
 | 
|  
 | 
 
 | 
  Technical Information
 
|  Comments:
 | 
 General Technical Comments on the Project
 | 
  Civil Works and Penstock
 
|  Dam construction material:
 | 
 
 | 
|  Dam Height:
 | 
 
 | 
|  Dam Lenght:
 | 
 
 | 
|  Dam Width:
 | 
 
 | 
|  Storage Volume Reservoir:
 | 
 ?
 | 
|  Sedimentation Basin:
 | 
 
 | 
|  Penstock Length:
 | 
 
 | 
|  Penstock Diameter at Beginning:
 | 
 X
 | 
|  Penstock Diameter at End:
 | 
 X
 | 
|  Penstock Changes of Diameter:
 | 
 
 | 
|  Penstock Material:
 | 
 PVC
 | 
|  Security Valve:
 | 
 
 | 
  Electromechanical Equipment
 
Turbine
|  Turbine Type:
 | 
 Pelton, x injectors
 | 
|  Turbine Manufacturer:
 | 
 (Contact:)
 | 
|  Potencial (nominal):
 | 
 
 | 
|  Rated Head:
 | 
 
 | 
|  Rated Flow:
 | 
 
 | 
|  Rated Speed:
 | 
 X
 | 
|  :
 | 
 
 | 
|  :
 | 
 
 | 
|  
 | 
 
 | 
|  :
 | 
 
 | 
|  :
 | 
 
 | 
|  :
 | 
 
 | 
|  :
 | 
 
 | 
|  :
 | 
 
 | 
Generator:
|  Generator Manufacturer and Model:
 | 
 
 | 
|  Phases:
 | 
 3
 | 
|  Potencial (nominal):
 | 
 
 | 
|  Nominal voltage:
 | 
 
 | 
|  Speed:
 | 
 
 | 
|  Frequenzy:
 | 
 X
 | 
|  Insolation Class:
 | 
 
 | 
|  :
 | 
 
 | 
|  
 | 
 
 | 
  Electrical Transmission
 
Mini Grid yes Connection to national Grid Voltage Transmission Conductor Diameter of Conductor Transformer Rating kvA
  Economic Information
 
Developer: (Contact: )
Operator: (Contact: )
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Cost: Connected Hounsholds Connection Cost Cost to be covered by houshold
|-
| style="width: 194px;" | Start of Construction:
| style="width: 390px;" | ?
|-
| style="width: 194px;" | Date of Commissioning:
| style="width: 390px;" | ?
  Project Photos