Revision as of 19:46, 27 March 2014 by
***** (***** | *****)
Overview
| Name of the site:
|
El Plan
|
| Country:
|
Nicaragua (GPS Coordinates: ?)
|
| Turbine Type:
|
Pelton
|
| Power Output:
|
X kW
|
| Project Status:
|
in operation
|
| Comments:
|
?
|
Operation Data
| Gross Head:
|
|
| Net Head:
|
|
| Flow (design flow):
|
|
| Comments on flow variation during the year:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Technical Information
| Comments:
|
General Technical Comments on the Project
|
Civil Works and Penstock
| Dam construction material:
|
|
| Dam Height:
|
|
| Dam Lenght:
|
|
| Dam Width:
|
|
| Storage Volume Reservoir:
|
?
|
| Sedimentation Basin:
|
|
| Penstock Length:
|
|
| Penstock Diameter at Beginning:
|
X
|
| Penstock Diameter at End:
|
X
|
| Penstock Changes of Diameter:
|
|
| Penstock Material:
|
PVC
|
| Security Valve:
|
|
Electromechanical Equipment
Turbine
| Turbine Type:
|
Pelton, x injectors
|
| Turbine Manufacturer:
|
(Contact:)
|
| Potencial (nominal):
|
|
| Rated Head:
|
|
| Rated Flow:
|
|
| Rated Speed:
|
X
|
| :
|
|
| :
|
|
|
|
|
| :
|
|
| :
|
|
| :
|
|
| :
|
|
| :
|
|
Generator:
| Generator Manufacturer and Model:
|
|
| Phases:
|
3
|
| Potencial (nominal):
|
|
| Nominal voltage:
|
|
| Speed:
|
|
| Frequenzy:
|
X
|
| Insolation Class:
|
|
| :
|
|
|
|
|
Electrical Transmission
Mini Grid yes Connection to national Grid Voltage Transmission Conductor Diameter of Conductor Transformer Rating kvA
Economic Information
Developer: (Contact: )
Operator: (Contact: )
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Cost: Connected Hounsholds Connection Cost Cost to be covered by houshold
|-
| style="width: 194px;" | Start of Construction:
| style="width: 390px;" | ?
|-
| style="width: 194px;" | Date of Commissioning:
| style="width: 390px;" | ?
Project Photos