Revision as of 20:11, 27 March 2014 by
***** (***** | *****)
Overview
| Name of the site:
|
El Plan
|
| Country:
|
Nicaragua (GPS Coordinates: ?)
|
| Turbine Type:
|
Pelton
|
| Power Output:
|
X kW
|
| Project Status:
|
in operation
|
| Comments:
|
?
|
Operation Data
| Gross Head:
|
|
| Net/Design Head:
|
|
| Flow (design flow):
|
|
| Comments on flow variation during the year:
|
|
Technical Information
| Comments:
|
General Technical Comments on the Project
|
Civil Works and Penstock
| Dam construction material:
|
|
| Dam Dimensions:
|
|
| Storage Volume Reservoir:
|
?
|
| Sedimentation Basin material:
|
|
| Sedimentation Basin Dimensions:
|
|
| Penstock Length:
|
|
| Penstock Diameter at Beginning:
|
X
|
| Penstock Diameter at End:
|
X
|
| Penstock Changes of Diameter:
|
|
| Penstock Material:
|
PVC
|
| Security Valve:
|
|
Electromechanical Equipment
Turbine
| Turbine Type:
|
Pelton, x injectors
|
| Turbine Diameter:
|
Pelton, x injectors
|
| Turbine Material:
|
Pelton, x injectors
|
| Turbine Manufacturer:
|
(Contact:)
|
| Potencial (nominal):
|
|
| Rated Head:
|
|
| Rated Flow:
|
|
| Rated Speed:
|
X
|
| Runnaway Speed:
|
|
| Shaft diameter and material:
|
|
| Direction of Rotation:
|
|
| Orientation of Shaft:
|
|
Generator:
| Generator Manufacturer and Model:
|
|
| Phases:
|
3
|
| Potencial (nominal):
|
|
| Nominal voltage:
|
|
| Nominal Speed:
|
|
| Frequency:
|
X
|
| Isolation Class:
|
|
Mechanical Transmission / Coupling
| Type of Belt:
|
|
| Belt Manufacturer:
|
3
|
| Distance between Pulleys:
|
|
| Diameter of Generator Pulley:
|
|
| Diameter of Generator Pulley:
|
|
Control System
| Control System Manufacturer and Model:
|
|
| Type of Control:
|
3
|
| Capacity:
|
|
Electrical Transmission
| Mini Grid:
|
|
| Connection to national Grid:
|
3
|
| Grid Voltage:
|
|
| Diameter of Conductor:
|
3
|
| Transformer Rating:
|
|
Economic Information
| Developer: (Contact: )
|
|
| Operator:
|
3
|
| Ownership / Operation Model:
|
|
| Tariff structure:
|
3
|
| Connected Housholds:
|
|
| Costs:
|
|
| Connection Cost Cost to be covered by houshold:
|
3
|
| Connected Hounsholds:
|
|
| Start of Construction:
|
?
|
| Date of Commissioning:
|
?
|
Project Photos