SOFTWARE UPDATE ANNOUNCEMENT: 30 AUG - 15 SEP
|
Error creating thumbnail: convert: unable to open image `/var/www/ISWiki/prod/current/energypedia/images/0/0a/Icon_Announcement.png': No such file or directory @ error/blob.c/OpenBlob/2641. convert: no images defined `/tmp/transform_5926cf1-1.png' @ error/convert.c/ConvertImageCommand/3044.
|
Hurrah! Your beloved energypedia is getting a new software update to ensure faster and easier knowledge exchange and sharing on energypedia. After the new software update, you can expect a new and updated energypedia with a responsive design.
Hence, from 30 Aug to 15 Sep, energypedia will be on read-only mode and you will not be able to download/upload content or create/edit articles on energypedia.
|
ToR Development of Detailed Designs and Technical Specifications
From old.energypedia.info
ToR Development of Detailed Designs and Technical Specifications
Title of Document
|
ToR Development of Detailed Designs and Technical Specifications
|
Abstract
|
The ToR describes consultancy services for developing detailed designs, drawings and technical specifications on EE for government buildings.
The main tasks are:
- Prepare drawings of audited facilities;
- Prepare detailed technical specifications and basic renovation designs;
- Consultation with construction firms to gauge their capacity for building renovations;
- Bidding documents for EE Audits;
- Supervise a construction project;
- Assist the evaluation committee of the EE agency with technical advice on contractor selection.
|
File Download
|
► English: ToR Development of Detailed Designs and Technical Specifications.docx
|
Original Source
|
|
Year
|
2013
|
Region/Country
|
|
Language(s)
|
English
|
Document Type
|
Terms of Reference - Development of Specifications. Testing and Certification, Project Implementation Support, Laws; Policies and Regulations
|
Sector
|
Buildings, Public Lighting
|