| (One intermediate revision by one user not shown) | 
| Line 6: | 
Line 6: | 
|   | |HPDBOperator=Kisiizi Power Ltd  |   | |HPDBOperator=Kisiizi Power Ltd  | 
|   | |HPDBProject Status=Completed  |   | |HPDBProject Status=Completed  | 
| − | |HPDBContact=pauldarrall50(at)aol.com  | + | |HPDBContact=please contact Paul Darrall (see bottom of the page)  | 
|   | |HPDBLink to Photos=www.kisiizihospital.org.ug  |   | |HPDBLink to Photos=www.kisiizihospital.org.ug  | 
|   | |HPDBPower=300  |   | |HPDBPower=300  | 
| Line 47: | 
Line 47: | 
|   | |HPDBCommentEI=cost of service connection and meter  |   | |HPDBCommentEI=cost of service connection and meter  | 
|   | }}  |   | }}  | 
|   | + |  | 
|   | Non-profit company to return all profit to hospital to subsidise treatment for poor people, including psychiatric.  |   | Non-profit company to return all profit to hospital to subsidise treatment for poor people, including psychiatric.  | 
|   | + |  | 
|   | + |  | 
|   | + |  | 
|   | + | UPDATE 2020: The number of external customers has now risen from 300 to just over 600!  | 
		Latest revision as of 18:28, 4 February 2020
Back to the Hydropower Sites Database
  General Information 
|  Country:
 | 
 Uganda
 | 
|  City/Town:
 | 
 Kisiizi
 | 
|  Coordinates (Powerhouse):
 | 
 | 
|  Year of Commission:
 | 
 2009
 | 
|  Basin Name:
 | 
 | 
|  Stream Name:
 | 
 | 
|  Developer:
 | 
 Friends of Kisiizi UK
 | 
|  Operator:
 | 
 Kisiizi Power Ltd
 | 
|  Project Status:
 | 
 Completed
 | 
|  Any other uses of the water source:
 | 
 | 
|  Contact:
 | 
 please contact Paul Darrall (see bottom of the page)
 | 
|  Comment:
 | 
 | 
|  Link to Photos:
 | 
 www.kisiizihospital.org.ug
 | 
  Technical Information 
|  Power: (kW)
 | 
 300
 | 
|  Energy (kWh/a):
 | 
 | 
|  Capacity Factor (%):
 | 
 | 
|  Penstock Diameter (mm):
 | 
 800
 | 
|  Penstock Length (m):
 | 
 45
 | 
|  Penstock Material (m³/s):
 | 
 Helically welded 8mm steel
 | 
|  Maximum Flow of the Penstock (m³/s):
 | 
 1
 | 
|  Minimum Flow of the Stream (m³/s):
 | 
 2
 | 
|  Head (m):
 | 
 30
 | 
|  Turbine Type:
 | 
 Crossflow
 | 
|  Turbine Manufacturer:
 | 
 Ossberger
 | 
|  Generator Type:
 | 
 Synchronous Brushless
 | 
|  Generator Capacity (kW):
 | 
 500
 | 
|  Generator Manufacturer:
 | 
 | 
|  Comment:
 | 
 Gearbox 2:1
 | 
  Mini/Island Grid Information 
|  Mini Grid:
 | 
 Yes
 | 
|  Load Control Information:
 | 
 Load Tank
 | 
|  Connection Type:
 | 
 | 
|  Public Lighting:
 | 
 Yes
 | 
|  Length of Transmission Line (m):
 | 
 10000
 | 
|  Voltage (v):
 | 
 11000
 | 
|  Transmission Conductor (type) :
 | 
 ACSR
 | 
|  Diameter of Conductor (mm²):
 | 
 6
 | 
|  Transformer Rating (kVA):
 | 
 315
 | 
|  Link to Grid:
 | 
 Off Grid
 | 
|  S.W.E.R:
 | 
 No
 | 
|  Operational Period (Xdays/year):
 | 
 365
 | 
|  Comment:
 | 
 300 external paying customers
 | 
  Dam Information 
| 
 Dam Type:
 
 | 
 Run of river
 | 
|  Dam Construction Material:
 | 
 Concrete Gravity Dam
 | 
|  Dam Height [m]:
 | 
 2
 | 
|  Length of Dam [m]:
 | 
 3
 | 
|  Storage Volume of Reservoir (m³):
 | 
 0
 | 
|  Flood Storage of Reservoir:
 | 
 No
 | 
|  Channel Material:
 | 
 Stone/cement
 | 
|  Comment:
 | 
 Water diverted from 30m waterfall
 | 
  Economic Information 
| Cost (€):
 | 
 900000
 | 
|  Donor/Financier & Percentage:
 | 
 World Bank
 | 
|  Tariff Levels:
 | 
 Same as Umeme
 | 
|  Connected Households:
 | 
 300
 | 
|  Connection Cost (€):
 | 
 Individually priced
 | 
|  Cost to be Covered by Households (%):
 | 
 | 
|  Comment:
 | 
 cost of service connection and meter
 | 
|  Link to Cost Breakdown:
 | 
 | 
Non-profit company to return all profit to hospital to subsidise treatment for poor people, including psychiatric.
UPDATE 2020: The number of external customers has now risen from 300 to just over 600!