Back to the Hydropower Sites Database
General Information
Country:
|
Uganda
|
City/Town:
|
Kisiizi
|
Coordinates (Powerhouse):
|
|
Year of Commission:
|
2009
|
Basin Name:
|
|
Stream Name:
|
|
Developer:
|
Friends of Kisiizi UK
|
Operator:
|
Kisiizi Power Ltd
|
Project Status:
|
Completed
|
Any other uses of the water source:
|
|
Contact:
|
please contact Paul Darrall (see bottom of the page)
|
Comment:
|
|
Link to Photos:
|
www.kisiizihospital.org.ug
|
Technical Information
Power: (kW)
|
300
|
Energy (kWh/a):
|
|
Capacity Factor (%):
|
|
Penstock Diameter (mm):
|
800
|
Penstock Length (m):
|
45
|
Penstock Material (m³/s):
|
Helically welded 8mm steel
|
Maximum Flow of the Penstock (m³/s):
|
1
|
Minimum Flow of the Stream (m³/s):
|
2
|
Head (m):
|
30
|
Turbine Type:
|
Crossflow
|
Turbine Manufacturer:
|
Ossberger
|
Generator Type:
|
Synchronous Brushless
|
Generator Capacity (kW):
|
500
|
Generator Manufacturer:
|
|
Comment:
|
Gearbox 2:1
|
Mini/Island Grid Information
Mini Grid:
|
Yes
|
Load Control Information:
|
Load Tank
|
Connection Type:
|
|
Public Lighting:
|
Yes
|
Length of Transmission Line (m):
|
10000
|
Voltage (v):
|
11000
|
Transmission Conductor (type) :
|
ACSR
|
Diameter of Conductor (mm²):
|
6
|
Transformer Rating (kVA):
|
315
|
Link to Grid:
|
Off Grid
|
S.W.E.R:
|
No
|
Operational Period (Xdays/year):
|
365
|
Comment:
|
300 external paying customers
|
Dam Information
Dam Type:
|
Run of river
|
Dam Construction Material:
|
Concrete Gravity Dam
|
Dam Height [m]:
|
2
|
Length of Dam [m]:
|
3
|
Storage Volume of Reservoir (m³):
|
0
|
Flood Storage of Reservoir:
|
No
|
Channel Material:
|
Stone/cement
|
Comment:
|
Water diverted from 30m waterfall
|
Economic Information
Cost (€):
|
900000
|
Donor/Financier & Percentage:
|
World Bank
|
Tariff Levels:
|
Same as Umeme
|
Connected Households:
|
300
|
Connection Cost (€):
|
Individually priced
|
Cost to be Covered by Households (%):
|
|
Comment:
|
cost of service connection and meter
|
Link to Cost Breakdown:
|
|
Non-profit company to return all profit to hospital to subsidise treatment for poor people, including psychiatric.
UPDATE 2020: The number of external customers has now risen from 300 to just over 600!