SOFTWARE UPDATE ANNOUNCEMENT: 30 AUG - 15 SEP
|
Error creating thumbnail: convert: unable to open image `/var/www/ISWiki/prod/current/energypedia/images/0/0a/Icon_Announcement.png': No such file or directory @ error/blob.c/OpenBlob/2641. convert: no images defined `/tmp/transform_1fa35f4-1.png' @ error/convert.c/ConvertImageCommand/3044.
|
Hurrah! Your beloved energypedia is getting a new software update to ensure faster and easier knowledge exchange and sharing on energypedia. After the new software update, you can expect a new and updated energypedia with a responsive design.
Hence, from 30 Aug to 15 Sep, energypedia will be on read-only mode and you will not be able to download/upload content or create/edit articles on energypedia.
|
Solar Hybrid Systems: Costs, Financing, Business and Operation Models
From old.energypedia.info
►Back to Solar Portal
Overview
Specifications of costs, financial models and subsidies of Solar Hybrid Systems can be found in the following parts.
Operator Models
This article summarizes different operator models for Hybrid Systems and describes experience in Senegal.
Costs and Tariff Setting
Costs and Tariff Settings are discussed with regard to a project in Senegal.
Metering and Billing Systems
This article shows various systems for metering and billing, such as flat-rate / limiters, pre-payment as well as experience in Nepal.
Further Information
References