Tariffs and Billings Systems - Experience Matrix - MATA 2009
From old.energypedia.info
Error creating thumbnail: convert: unable to open image `/var/www/ISWiki/prod/current/energypedia/images/7/78/M-revision.PNG': No such file or directory @ error/blob.c/OpenBlob/2641. convert: no images defined `/tmp/transform_1350742-1.png' @ error/convert.c/ConvertImageCommand/3044.
|
This article needs to be revised. Please rewrite the article according to the specifications below. Only remove this maintenance box after a thorough revision of this article. See the discussion page for more details or start a discussion there.
In particular the following aspects and passages have been specified to be in need for a revision:
Überarbeitungshinweis: Überführen in Übersichtstabelle im zukünftigen Finance-Portal.
|
Overview[1]
- Which tariffs and billing systems have been successful?
- Which challenges have been identified?
Country / Project / System
|
System applied successful
|
Challenges
|
Indonesia / MHP /Micro Hydro Schemes
|
- Flat rate (households)
- Item based (eg # of bulbs)
- Cluster metering
|
- Overloading
- Sanction management
|
Pakistan
|
- Item based (eg # of bulbs)
|
|
planned in Ethiopia / EnDev / Micro Hydro Schemes
|
- flat rate (no productive use) + mech.load limiter; only CLF, no social tariff
|
- billing - recovery rate too low
- monitoring of applied devices
- Static system
- risk: pilot --> not cost covering
|
Republic South Africa / SHS
Pakistan / SHS
|
|
- Fee for service with pre-paid metering
- complete financial failure
- conceptual design resulted in no ownership and caused vandalism, theft,...
|
Senegal / SHS
Burkina Faso / SHS
|
- Fee for service successful
|
|
Ghana / grid
|
- prepaid and post paid metered
- lifeline tariff
|
|
China / grid - households
|
- one tariff pre paid metered
|
|
Rwanda / grid
|
- one tariff pre paid metered
|
- power production to low for overall demand
- utility prefers to connect only big consumers
- off grid tariff (MHP) lower than grid tariff
- not cost covering
|
Zambia / grid
|
- recently change from flat rate to prepaid tariff
- resulted in lower electricity consumption
|
- with reduced electricity consumption the demand for charcoal increase singnificant
|
Senegal / Minigrids
|
- flat rate with consumption limiter
|
- not cost covering under all conditions
|
Marocco / planned for island grid
|
|
|
Further Information
References
- ↑ Results of the discussions during Mata 2009 (GIZ)