SOFTWARE UPDATE ANNOUNCEMENT: 30 AUG - 15 SEP
|
Error creating thumbnail: convert: unable to open image `/var/www/ISWiki/prod/current/energypedia/images/0/0a/Icon_Announcement.png': No such file or directory @ error/blob.c/OpenBlob/2641. convert: no images defined `/tmp/transform_a9914b-1.png' @ error/convert.c/ConvertImageCommand/3044.
|
Hurrah! Your beloved energypedia is getting a new software update to ensure faster and easier knowledge exchange and sharing on energypedia. After the new software update, you can expect a new and updated energypedia with a responsive design.
Hence, from 30 Aug to 15 Sep, energypedia will be on read-only mode and you will not be able to download/upload content or create/edit articles on energypedia.
|
Village Hydro/Wind/Biomass Post-Installation Verification (Sustainability Audit)
From old.energypedia.info
Village Hydro/Wind/Biomass Post-Installation Verification (Sustainability Audit)
Title of Document
|
Village Hydro/Wind/Biomass Post-Installation Verification (Sustainability Audit)
|
Abstract
|
The Government of Sri Lanka with the assistance of the World Bank and the Global Environmental Facility (GEF) has established a Project which aims to foster rural economic development through private sector and community based development models. The Project channels funds through participating credit institutions (PCI) to individual investments. Grant funds are also available from the GEF for selected technical assistance activities.
|
File Download
|
► English: Sri Lanka Village Hydro-Wind-Biomass Post installation Verification.pdf
|
Original Source
|
PPP in Infrastructure Resource Center
|
Year
|
2008
|
Region/Country
|
South Asia - Sri Lanka
|
Language(s)
|
English
|
Document Type
|
Terms of Reference - Pipeline Development
|
Technology
|
Bioenergy Biomass Hydro Wind
|
Connection Type
|
Mini-grid/Distributed Generation
|